Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment.

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

Closing the Gap Between Green Design and Operations Greg Schindler, PE, CFM Project Manager Convention & Entertainment.
High Performance Buildings Congressional Caucus Coalition April 11, 2012 Washington, DC Bruce D. Hunn ASHRAE.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
HVAC Test and Balance And The Lodging Industry. Source: Florida Power.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Energy Efficient Operations: Giving facility operators the tools to optimize building performance The B3 Energy Efficient Operations Manual Garrett Mosiman.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
December 10, 2007 Multi-family Residential Unit Audits - Garden Apts and Smaller housing stocks1 Multi-Family Residential Unit Audits Garden Apartments.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
Building Commissioning
Effective Energy Management. Keys Save energy Lower utility operating costs Maintain or improve operations Support corporate goals.
Project Close Out CTC-470.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Cleaning products and services Module 3 - Purchasing recommendations European Commission GPP Training Toolkit.
Presented by Mary C. Emplaincourt, M.S Presentation at a MMA Energy Meeting.
Computerized Maintenance Management Solutions (CMMS)
Genesis Solar Module Brochure ™
Total Energy Usage As A Measure of Building Performance 30% Building Energy Savings Through an Energy Lifecycle Approach to Building Construction, Retro-fitting,
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Implementing an Energy Management System Brendan Thorne Aughinish Alumina Limited.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.
Performance Metrics for Weatherization UGI LIURP Evaluation Yvette Belfort Jackie Berger ACI Home Performance Conference April 30, 2014.
Providing Full Service Technology Support in Self-Service Times Objective: To discuss the challenges, pitfalls and opportunities of the current technology.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
© 2009 AirAdvice, Inc. Increasing Profitability Through Energy Services A Comprehensive Program To Deliver Energy and Sustainability Services.
Prof. S. Neti, Director Drs. A. Oztekin, C. Romero, and H. Bilirgren.
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
© 2009 AirAdvice, Inc. Increasing Profitability Through Energy Services A Comprehensive Program To Deliver Energy and Sustainability Services.
Phoenix Convention Center Phoenix, Arizona FEMP Training Supports FBPTA and FMI.gov Institutional Change Federal Buildings Personnel Training Act: Resources.
Building Operator Training Program for Energy Efficient Operations Presentation to Minnesota Chief Engineer’s Guild St Paul, MN December 3, 2013 Center.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
International Newspaper Group 2008 Gannett’s Green Campaign.
Building Commissioning/Energy Performance Contracting.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
Program Overview Public Buildings Enhanced Energy Efficiency Program (PBEEEP) This program was made possible with funding from the U.S. Department of Energy.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
Affordable Computerized Maintenance Management Solutions (CMMS) Gabi Miles Hach Company May 22, 2009.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Energy Services Harsha Holalu Ramakrishna Energy Extension Specialist Department of Mechanical and Aerospace Engineering.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Data Analytics – A Cost Effective Approach to Reducing Operating Costs Automatically “find what matters” in the data from building equipment systems and.
Tier Certification Explained
Fort Stanwix National Monument Energy Audit Contract
Sean Weber Energy Engineer
Aircon Mechanical Systems
ISO/IEC
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Armstrong Fluid Technology | FMA September 2013
Implementing Effective Energy O&M Strategies on a Limited Budget
ANSI/ASHRAE 90.4 Energy Standard for Data Centers
Energy Efficient Design
ECM SERVICES Group Stormwater Monitoring Program
Presentation transcript:

Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment

Page 2  During commissioning projects the commissioning agent develops a deep understanding of the facility Mechanical systems Building envelope Lighting Occupant patterns  Those systems that work right don’t generate recommendations  Energy efficient operations is a part of all systems But, much of the knowledge is not transferred to anyone by the commissioning agent A Valuable Addition to the Building Commissioning Process

Page 3  Assumes Existing Building Commissioning (EBCx)  Transfer of knowledge is needed  Adds value to the customer  Demonstrates expertise of the commissioning agent  Leads to high performing buildings  Peter Herzog has been the driving force in this field for over 40 years For Existing Buildings

Page 4  Understand the building structure and systems (EBCx)  Analyze the operations (EBCx)  Train the staff  Document the results in a manual  Continue the cycle Energy Efficient Operations: The Process

Page 5  80:20 rule Energy intensive operations Common types of deficiencies Needs of the operator  Based on observations during EBCx project Systems Staff Operations Individualized training

Page 6  Depends on operator’s level of expertise  What to check is often less important than how to check it.  Remove barriers related to intermittent activities  Utilize established training methods Repeat three times Break down into simple steps Clearly state the objective Training Module Example: Checking performance with the BAS

Page 7 Using the BAS to Review Schedules Goal: On at 7AM, off at 10 PM

Page 8  Based on interviews and documents in new buildings Owners, occupants and operators  Existing buildings (when occupied) should define OFR  Building must be operating at equilibrium Agreement between owners, operators and occupants Does not mean it is energy efficient  Occupant complaints or unstable conditions indicate non-equilibrium conditions May be due to equipment or design issues Typically a focus of EBCx project Owner’s Facility Requirements

Page 9  Energy efficient operations will be identified in the equilibrium operations through rigorous investigation  Non-equilibrium operations will be investigated and solutions identified  Commissioning agent’s scope covers both  Energy Efficient Operations Manual is the tangible record of these findings, even after prescribed measures are implemented Value of integrating with EBCx

Page 10  Manual must be comprehensive Level of detail depends to some degree on the operator  Check sheets must be tailored to the operator How many things can they check, and how often? What level of detail is needed in the instructions? What is the logging system? What is done with the results?  Facility size may provide a rule of thumb Large 24x7 facility probably has a full staff with specialists Small 50 hr/week facility may have a part time staff, or it may be a secondary responsibility of someone else Operators will differ in competency

Page 11 State of Minnesota Buildings: Most common energy saving opportunities

Page 12 DescriptionAverage SavingsNumber Observed Boiler retrofit8.1 kbtu/sq. ft.3 Heat recovery retrofit3.9 kbtu/sq. ft.5 Stuck or leaky valve3.9 kbtu/sq. ft.14 Time of day enabling is excessive 3.3 kbtu/sq. ft.135 Measures with the largest impact These observations are based on 218 buildings at 49 sites containing 18.5 million square feet Average EUI (site energy use) of these buildings is 107 kbtu/sq. ft.

Page 13 Why Customize? Heating Systems

Page 14  Program developed for building operators to assure persistence of savings following SB2030 new construction and PBEEEP projects  Site specific  Half day of hands on training  Manual and Check Sheets provided  Series of monthly webinars on general energy efficient operations management topics AHU’s Economizers, Fans, Motors, VFD’s Building automation systems Heating and cooling plants Summary: Energy Efficient Operations

Page 15  Requires a relationship  Provide requested Job Instruction sheets  Reminder to submit check sheets (or in PM system) Maintained in a database  Provide long term support Mechanical engineering expertise Controls issues General energy management Sharing of new developments and best practices Energy Efficient Operations: After the Visit

Page 16

Page 17 Verification Check sheet Check mark under Section 41.2 if delta T is greater than 10 degrees: No corrective action is needed.

Page 18 Chris Plum Center for Energy and Environment Thank you