S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.

Slides:



Advertisements
Similar presentations
Welcome Interstate I-66 / Route 28 Preliminary Study Stakeholder Workshop May 29, 2012.
Advertisements

SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
CPM Scheduling Techniques & Technologies Cayuga I-35E, St. Paul
Great Western Corridor Feasibility Study
D2 Roadway Discussion Sound Transit Board September 22, 2011.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
CEM-512 Value Engineering Highway Project: South Interchange.
US 52 Corridor Study Public Meeting November 15, 2010.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Hansen’s Truck Stop Inc. Property in Humboldt County Charlie Fielder District Director Caltrans District 1.
Jan. 16, 208 CoW1 - Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole January.
Environmental Assessment Public Meeting
City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
I-65 Added Travel Lanes Project in Tippecanoe County
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Current Construction Projects Major Projects Pinellas County.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
I-95 Managed Lanes CORSIM Analysis Status Meeting Presented by David Stroud, PE, AICP Reynolds, Smith and Hills, Inc.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Transportation Committee Meeting January 27, 2012.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Program Manager Administrator
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Visit Our Website at: Click to edit Master title style.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
I-15 North Phase 4 Scoping & Project Management Assistance
Fordham at Columbia as a Grade-Separated Intersection
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
FM 518 By-pass Traffic Review
STATE SUEE AND ONE WAY CORRIDORS
Lyle Parkway to SR 540 (Winter Lake Road)
Fordham at Columbia as a Grade-Separated Intersection
TT – National Trade Corridors Fund – Airport Trail Phase 2
Metropolitan District | mndot.gov
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

S.R. 690 (118th Avenue) (C.R. 296)

Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative Selection at US-19 WB SR 690 to NB US-19 (Interim) WB SR 690 to NB US-19 Flyover (Ultimate) –Staging Menu/Travel Time –Summary of Recommendations Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative Selection at US-19 WB SR 690 to NB US-19 (Interim) WB SR 690 to NB US-19 Flyover (Ultimate) –Staging Menu/Travel Time –Summary of Recommendations

Alternative Analysis Viaduct at 49 th St. Compressed at 49 th St. Compressed Ramps Viaduct Ramp SR 690 COMPRESSED ALTERNATIVE (without EB Zipper) SR 690 VIADUCT ALTERNATIVE (without EB Zipper)

Compressed ROW vs. Viaduct

Why the Viaduct? No roadway right of way required East of Progress Energy Corridor Reduces or eliminates impacts to businesses east of 49th St. Less maintenance cost over 50 year period. Avoids potentially contaminated sites northeast of 49th St. Existing drainage system remains in place. Simplifies permitting. Existing underground utilities can remain in service without impact. Construction duration is 150 days less than compressed.

WB SR 690 to NB US-19 (Interim) Provides an interim free flow right turn lane from WB SR 690 to NB US-19 Minimal Additional impact to Calvary Cemetery identified in PD&E Calvary Catholic Cemetery

US-19 & SR 690 Flyovers Provides free flow movement from SR 690 & US-19 Ramps can be constructed independently with staged construction West to North ramp avoids cemetery property Provides free flow movement from SR 690 & US-19 Ramps can be constructed independently with staged construction West to North ramp avoids cemetery property Calvary Catholic Cemetery

Staging Menu CURRENT FUNDING Fiscal YearFDOTCountyTotal 2012$ $ $1.0$20.0$ $ $25.0 TOTAL:$4.3$65.0$69.3

Construction Staging Options Sequence 1 & 2 Construct WB Express lanes from 28th St to 40th St and tie to existing 118th Ave. Includes improvements at 43rd St, 34th St and 31st Court. Includes improvements to Ramps P and P1. Sequence 1 & 2 Construct WB Express lanes from 28th St to 40th St and tie to existing 118th Ave. Includes improvements at 43rd St, 34th St and 31st Court. Includes improvements to Ramps P and P1. Estimated 2035 Travel Time (minutes) SequenceAM EBPM EBAM WBPM WB 1 &

Construction Staging Options Sequence 3 & 3a Construct EB/WB SR 690 Frontage Rd and Viaduct from US- 19 to past 43rd St including interchange at 49th St. Includes ramp from EB Frontage to I-275 Ramp at 31 st St. and addition of third lane to EB SR 690 Frontage Rd from 40th St to 31 St. Sequence 3 & 3a Construct EB/WB SR 690 Frontage Rd and Viaduct from US- 19 to past 43rd St including interchange at 49th St. Includes ramp from EB Frontage to I-275 Ramp at 31 st St. and addition of third lane to EB SR 690 Frontage Rd from 40th St to 31 St. EB Ramp Estimated 2035 Travel Time (minutes) SequenceAM EBPM EBAM WBPM WB 1 & & 3a

Construction Staging Options Sequence 4 Construct EB SR 690 Express lanes from 40th St to 28th St. Sequence 4 Construct EB SR 690 Express lanes from 40th St to 28th St. Estimated 2035 Travel Time (minutes) SequenceAM EBPM EBAM WBPM WB 3 & 3a

Construction Staging Options Sequence 5 & 6 Construct WB SR 690 to NB US-19 and SB US-19 to EB SR 690 Flyovers. Sequence 5 & 6 Construct WB SR 690 to NB US-19 and SB US-19 to EB SR 690 Flyovers. Estimated 2035 Travel Time (minutes) SequenceAM EBPM EBAM WBPM WB &

Summary of Recommendations Viaduct Alignment Stage Construction Add Interim free flow right at US-19 Construct SB US-19 to EB SR 690 Flyover and add a WB SR 690 to NB US-19 Flyover Viaduct Alignment Stage Construction Add Interim free flow right at US-19 Construct SB US-19 to EB SR 690 Flyover and add a WB SR 690 to NB US-19 Flyover

Thank You