Mobility Initiatives in Metro Manila Department of Transportation and Communications 12 March 2014.

Slides:



Advertisements
Similar presentations
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
Advertisements

CENTRAL CORRIDOR TRANSIT ACCESS STUDY Citizens for Modern Transit March 27, 2014.
PPP Center of the Philippines
Shoppes at Park Place Option June 27, Background March 2012 – PSTA Approves Policy to Staff all PSTA Restrooms April 2012 –Pinellas Park Confirms.
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011.
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
Noor E Alam, Ministry of Road Transport and Bridges, Bangladesh 2 nd ASIA BRTS, Ahmedabad, India BRTS IN D HAKA : D ESIGNING UNDER C ONSTRAINTS.
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
9/7/2012 MBS UU.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
Transit Improvements on East-West Routes in Downtown Minneapolis Michael Mechtenberg Planner Metro Transit Minneapolis-St. Paul, MN.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Brief Overview of the Passenger Transport Sector in the Philippines Gilberto M. Llanto C.P. ROMULO HALL, NEDA SA MAKATI BUILDING May 7, 2013.
MTF Rail Development Forum
1 Salt Lake City Gateway Area Railroad Consolidation Project Grant G. Schultz, Ph.D., P.E., PTOE Assistant Professor Brigham Young University CE En 361.
SUBWAY SYSTEM IN NEW YORK CITY The Magical Subway.
Recent process of Metrô Planning in São Paulo. Who I am João Carlos Scatena Civil Engineer 32 years working in transportation planning for São Paulo Metrô.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
Managing Director/CEO
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
RapidRide Briefing Growing Transit Communities East Corridor Task Force January 31 th, 2012 Ron Posthuma, Assistant Director King County Dept. of Transportation.
RATINALIZING THE SUBSIDY ALLOCATED TO MASS RAIL TRANSITS: THE CASE OF METRO RAIL TRANSIT LINE 3 IN EDSA PHILIPPINES RUZETTE MORALES - MARIANO.
Anaheim Regional Transportation Intermodal Center Project Update.
JASPERS – Supporting Urban Transport Projects Ministry of Regional Development, Czech Republic JASPERS Seminar, Prague - 28th November 2007 Dr. Joachim.
River to Sea TPO CAC A Presentation to: May 19, 2015.
Rapid Transit System Steering Committee Meeting December 4, 2012.
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
Buenos Aires Subway Expansion Country:Argentina Borrower:Government of the City of Buenos Aires Project: US$ 2.5 billion IDB Loan: US$ 1.5 billion Objective:Expansion.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
1 Program of Projects Study The Impacts of Regional Transit Investment Forum March 21, 2013 Move LA - "LA's Got Lines"
Afghanistan National Railway Plan and Way Forward
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Rail Division State & Federal Funding FY Operations & Facilities.
Purpose To develop and evaluate a range of transit and transportation alternatives throughout the MPO area, considering: u Regional Goals and Objectives.
TRANSPORT REGULATION: CHALLENGES AND POLICY RECOMMENDATIONS.
Comparative Evaluation between Elevated and Underground Metro Charkop-Bandra-Mankhurd Link By Hitesh L Bhanushali Under guidance of Prof. S.L.Dhingra.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
Background B Case Studies & C. Public Improvement Plan Presented by: Erin Newton.
Mercer Corridor Stakeholder Committee November 4, 2015 Sound Transit.
San Diego Trolley. Current Current/future expansion Propose extension.
II. Facility Program, A. Providers HOUSTON INTERMODAL CENTER/MULTIMODAL TERMINAL.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
METRO PADYAKAN Walk and Bike Ways Go to Home Page.
Virginia Department of Rail and Public Transportation Amy Inman Planning and Mobility Programs Administrator Department of Rail and Public Transportation.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Phoenix Regional ITS Fiber Optic Backbone. PURPOSES  Improve agency operations by establishing a shared, regional, telecommunications network.  Create.
BUS RAPID TRANSIT (BRT) PLANNING EFFORTS STATUS 1 Planning & Development Committee April 5, 2016.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
2015 Annual Program Evaluation (APE) Status Update July 14, 2015.
Stage 2 Light Rail Transit Program “In the ground ready”
Northwest Area Mobility Study FasTracks Monitoring Committee
Regional Roads Committee
Tramways in Norway Nordic Rail 6 October 2015 Ove Skovdahl
25th Avenue Grade Separation
25th Avenue Grade Separation
Status Report on Rochester’s DMC Transportation Plan
BASIC ELEMENTARY ASSESSMENT IN EDUCATION (BEAC)
I-85 Corridor Light Rail Transit Feasibility Study
2014 Annual Program Evaluation (APE) Status Update
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Northeast Area Transit Evaluation (NATE) II Update FasTracks Monitoring Committee August 5, 2014.
Presentation transcript:

Mobility Initiatives in Metro Manila Department of Transportation and Communications 12 March 2014

[BACK] Line 1 Cavite Extension Construction of 11.7 km of rail to connect Baclaran terminal station to Niyog in Bacoor, Cavite Project Cost: Php 64.9 B Includes construction of 3 intermodal facilities and 1 satellite depot Will serve an additional 500,000 to 700,000 riders daily Project rebid ongoing

[BACK] Line 2 East Extension Construction of 4.19 km of rail from Santolan terminal station to Masinag, Antipolo Project Cost: Php 9.76 B Will serve an additional 120,000 riders daily Consultancy for Detailed Engineering Design (DED) awarded; Consultancy for Electro- Mechinical Systems undergoing bid evaluation

[BACK] North-South Commuter Rail Description – Design and construction of a standard gauge commuter rail line for approx. 90 km from Malolos, Bulacan to Calamba, Laguna – Involves procurement of rolling stock and installation of electro-mechanical systems – Also passes through Cavite, Batangas, Metro Manila, Rizal, and Quezon Cost: USD B After Project – Expected annual demand of 750,000 in 2020; and over 1 M in 2030 Status – For NEDA Board approval Alignment

[BACK] Mass Transit System Description – Aims to connect the cities of Makati, Pasay and Taguig via a rail-based mass transit system Estimated Cost: USD 3.2 B Status – Feasibility Study ongoing, for completion by June 2014 Makati Bonifacio Global City Pasay Manila Parañaque

[BACK] Common Station, BRT ProjectDescription Common Station Establishment of an elevated station to connect the following lines: LRT 1, MRT 3, and MRT 7 For bidding Manila (Quezon Ave) BRT Development of bus-based corridor improvement initiatives between Fairview and Manila City Hall Involves establishment of 31 stations along Quezon Avenue Involves improvement of ancillary structures for pedestrians For submission to NEDA

[BACK] Initiatives for NCR Line 1 Metro Line 2 Metro Line 3 Metro PNR Commuter PNR Inter-City Line 7 ITS Bus Systems C5 Corridor Improvement Manila (Quezon Ave) BRT Ferry bus MRT7

Thank you.