 Challenge: to design a rubber band car out of simple materials that will travel a distance of at least 3 meters within a 1 meter wide track  Piece of.

Slides:



Advertisements
Similar presentations
Motion Objective 4.01 Determine the motion of an object by following and measuring its position over time.
Advertisements

Ms. Filiaga. Fill out on index card at your table : Name Class period 1) What motivated you to take Art B? 2) What do you expect to learn in art? 3) What.
Mousetrap Car Lab Write-Up and Sketches Requirements
The Writing Process Communication Arts.
Catching the Wind for 3 rd grade. Activity Guide Challenge: Discuss the challenge (5-10 minutes) Generate Ideas and Multiple Perspectives ( instructor.
+ Build a Better Candy Bag Build Your Own Robot Arm Critical Load Working With Wind Energy User Handouts Corali Ferrer Yvonne Pelham November 2010.
How to Succeed in Mrs. Boyle’s Class. What should I bring to class each and every day?? You need your science text, some NON mechanical pencils, a simple.
Honors Physics 5 Oct 2009 Today: – Discuss student notebooks – Quick determination of g in Lansdowne – Handout Graphical Analysis Lab Homework: review.
Projectile Launcher Mini Project 10/22/13. Bellwork If you are only given time (t) and range (d x ) how can you find v y ?
The Writing Process.
Ms. Filiaga. Fill out on index card at your table : Name Class period 1) What motivated you to take Art B? 2) What do you expect to learn in art? 3) What.
By April Nelson Sherrills Ford Elementary School.
Distance and Displacement, Speed and Velocity, and Acceleration Physics Olympics Photo:
Study Hall: Work quietly at your seat (homework, study, draw, read, etc.) You are not up wondering around the classroom – 1. Sharpen your pencils 2. Sit.
Problem Solving Unit 2. Problem Solving 1. Define the problem – What is the problem? 2. Generate possible solutions – What are some things I can do to.
Please CLOSE YOUR LAPTOPS, and turn off and put away your cell phones, and get out your note-taking materials. Today’s daily quiz will be given at the.
 Title your pages:  Page 69: Unit 2 Student Reflection  Page 70: Unit 2 Parent Review  Page 71: Table of Contents (Only if you don’t have Table of.
Chapter 1. Bell Work 1/4/10  Welcome Back! I hope you all enjoyed your break.  We are going to try something new with bell work this quarter. Please.
Warm-up Discuss the free response problems from the practice or come up with any last minute questions.
Chapter 1 Force and motion.
CLASSROOM EXPECTATIONS Ms. Bain Holgate Middle School 8 th Grade Language Arts.
Math Minutes, September /9 – 4/5 2. Carrie ran around the school’s track 1 ½ times. She started to walk ¼ of the distance and then began to run.
Science Fair Information. The purpose of the Science Fair is to offer students the opportunity to think deeply about science as it applies to everyday.
Name:___________________ Room #_____________. Science Fair Contract By signing below I realize I am responsible for: Paying Attention in Class Asking.
On a half sheet of paper answer the following in complete sentences: 1. What is the difference between distance and displacement? 2. Compare and contrast.
Unit 6 The Multigenre Research Project. Unit 6 In this unit, you will select someone to study who has made significant contributions to society. You can.
Review of roles and expectations.   Each role will lead a part of the discussion.  The leader of the discussion will “teach” the others in the group.
Warmup: (Far Side) 1)Turn in your permission forms to the yellow box in front of the room. 2)Open up to “Paper Platforms.” 3)The next section is “Evaluate.
Monday, November 5 th Entry Task Take the next couple of minutes to review for your 4.1 quiz Schedule: 4.1 Quiz Investigate Chemical Weathering Pre-Lab.
Quarter 3.  Do Now: In your engineering Journal remember to RTQ and put in the date. Use the back of the paper. ◦ What different things can we measure?
Changing speed and direction
Intro to Engineering Design 9/11/2015. Creating Shortcuts Log onto the network – Your log in number is on your schedule – Your password is your Student.
Daily Agendas Pre-Algebra and Algebra. Monday Pre-Algebra Finish and turn-in p. 6-8 problems 1-3 through 1-7 Moby Max – Placement.
EGG DROP WORKSHEETS Updated 3/24/10 Individual Plan Group Plan Purchase Order.
Monday, September 14, 2015 DO NOW: Voice level 1 1.Get your binder 2.Complete planner (leave open to today) 3.Read silently. Planners: EQ: How do I annotate?
Paper Towers Mr. Peterson’s Science Class. Paper Towers You will work with your lab partner to build a tower as tall as possible. – One sheet of computer.
Math Minutes, September /9 – 4/5 2. Carrie ran around the school’s track 1 ½ times. She started to walk ¼ of the distance and then began to run.
Constant velocity Monday, September 14, Monday, 9/14 Unit 1: Linear Motion  Find out what your elbow partner said would stop Messi. Write your.
Force and Motion December 7, 2013 Ms. Smith Mrs. Malone Ms. Cedillo DO NOW: Date: December 7, B Identify and describe the changes in position,
Facilitator – FACILITATOR Position Description: You are the important person in charge of making sure each of your group members gets to share his/her.
Take Out Catalyst Sheet Pencil Science notebook. Catalyst What potential sources for error do you foresee occurring in this lab?
Ms. Filiaga. Fill out on index card at your table : Name Class period 1) What motivated you to take Art B? 2) What do you expect to learn in art? 3) What.
Mr. Karns’ Science Class
Ms. Filiaga. Fill out on index card at your table : Name Class period 1) What motivated you to take Art B? 2) What do you expect to learn in art? 3) What.
Monday September 14th, 2015 Planner: – HW: Safety rules poster due Wed. 9/16 – Safety Quiz tomorrow - based on rules You Need: – Today: Daily 5 To Do:
Communication Arts The Writing Process. Communication Arts Five Stages of the Writing Process Prewriting Drafting Revising Editing Publishing.
DO NOW – 5 th period V: 0 Monday 11/9 On your post-it note, answer the following question. Use the sentence stem to answer in a complete sentence. What.
2 nd Semester/Famo us Physicists Wednesday, January 6, 2016.
Math Minutes, September /9 – 4/5 2. Carrie ran around the school’s track 1 ½ times. She started to walk ¼ of the distance and then began to run.
Air Power Car Design Challenge. Sir Isaac Newton ( ), English natural philosopher, generally regarded as the most original and influential theorist.
To Do: 15 minutes to work… Turn in October Sky Lab Write-up (regular sci) Grab a yellow lab sheet and answer all analysis questions from Physics 500 in.
Science Fair Second Draft Check List:  Read the questions presented in this slideshow.  On a separate sheet of paper, take note of components you need.
This assignment is required for credit in Ms. Benton’s class. Speeches begin Friday, May 23. DO NOT PRINT IT OUT WITHOUT PERMISSION. We are low on ink.
Math Minutes, September /9 – 4/5 2. Carrie ran around the school’s track 1 ½ times. She started to walk ¼ of the distance and then began to run.
© 2012 by Project Gals New Goals for a New Year A Learning Activity.
Creating a children’s picture book Day by day activities and expectations.
St. Mary’s Catholic School, Mayville Mrs. Kaiser, Technology Teacher.
Inquiry Lab. Lab Planning Day Today you will work as a group to create a testable question. You will then design/plan a lab that tests your variable.
Do Now 3/14 1.Copy down this week’s homework. 2.Put page 3, your tech rubric in the In Box. Make sure your name is on it! 3.Clear your desk and collect.
Finish scientific method, begin speed
Science Binder Setup Mr. Fuller-Room 312.
Intro to Engineering Design
Motion of a Toy Car Lab Position vs. Time Graph
Building the BEST Structure Challenge
September 6, 2017 Block.
Wednesday, October 3, 2018 Reading Log due tomorrow (60 mins requires, 90 mins extra credit) FINAL COPY of reflection due on Google Classroom by Sunday.
2. Sit in the same seat as yesterday
Honors Physics I and AP Physics
Reading prompts.
If you did not do so yet, join Google Classroom:
Presentation transcript:

 Challenge: to design a rubber band car out of simple materials that will travel a distance of at least 3 meters within a 1 meter wide track  Piece of corrugated cardboard  4 plastic plates  4 rubber bands  3 unsharpened pencils  4 metal paperclips  16 thumbtacks  Scissors  Masking tape  No sling-shot cars! RUBBER BAND RACERS

 Partner-read “Student Reference Sheets”  In groups, meet and develop a plan for your car  One “Student Worksheet” per group  Use plain white paper to doodle/make sketches  Draw agreed-upon design on “Student Worksheet”, determine materials needed  Be prepared to present your initial design to class on Friday RUBBER BAND RACERS – DAY 1

 Each team presents its initial design to class  Feedback: Begin with “What I like about your design is…”  Pay attention to and learn from other teams to inform your redesign  Teams redesign to incorporate feedback  Journal Entry  Sketch of your revised initial design, including labels for parts RUBBER BAND RACERS – DAY 2

 Reconvene your group  Share additional design ideas, research with your teammates  Decide on revised design  Journal entry  Prompt: “What I am curious about this week in science is how my team’s design for a rubber band racer will perform…”  Title: Rubber Band Racer Design  Describe the design  Sketch the diagram, label parts  Gallery Walk  One member of each team remains at table  Others visit other teams to learn from their design ideas  Reconvene your group to share what you learned from other teams RUBBER BAND RACERS – DAY 3

 Only “A-seat” students get materials for their groups  Fulfill your trading obligations – give away what you promised you would give away, request the materials you were promised on Wednesday during ‘trading’ activity  Notice variation in rubber bands; another opportunity to trade?  Build your rubber band racer as designed  You will be reusing as much of the materials in your redesign, so do not destroy your materials in this construction phase!  During construction you may decide you need additional materials or that your design needs to change  Designate 1 person in your group who will circulate amongst other groups to see if he/she can locate and procure that additional material  In journals, make sure every one in group makes a new sketch and revises their materials list  Write your names somewhere on your car, put it in the area designated by block; write team initials on cups of extras  Finalizing construction tomorrow! RUBBER BAND RACERS – DAY 4 – CONSTRUCTION!

 15 minutes: Final construction of racers  Test it!  Must travel 3m within a 1m wide track  Collect data (yes, use the stop watch on your phone), calculate car’s speed (distance traveled per unit of time, or S=d/t)  Observe tests of other teams and how their different designs worked  Reconvene your team; evaluate your team’s results; redesign your racer; record it in each journal RUBBER BAND RACERS – DAY 5 COMPLETE CONSTRUCTION & TEST Rubber band car data Distance traveled within track (m)Time traveled within track (S)Speed (m/S) Test 1 Test 2 Test 3 Average

 Reconvene your group  Evaluate your initial design by answering these questions as a group  Did you succeed in creating a rubber band car that traveled 3m within the track? If so, how far did it travel, and what made it succeed? If not, why did it fail?  What designs or methods did you see other teams try that you thought worked well?  To do it over again, how would your planned design change? Why? What would it look like? What materials would you use?  In your journals, write an entry responding to the “What I learned this week in science is…” using your answers to the above questions. Make a sketch. RUBBER BAND RACERS – DAY 6 EVALUATE & REDESIGN

 Take 15 minutes:  To make final decisions with your group about your FINAL design  Write down those decisions and sketch of final design in your journal  Build your racers! Round 2  Feel free to trade materials  In Journals, make sure you have written down your final list of materials  If you have made any last-minute tweaks to your design as you construct, be sure to document those changes in your journal RUBBER BAND RACERS – DAY 7

 Build your racers! Round 2  Feel free to trade materials  In Journals, make sure you have written down your final list of materials  If you have made any last-minute tweaks to your design as you construct, be sure to document those changes in your journal RUBBER BAND RACERS – DAY 8

 10 minutes: Final construction of racers  Test it!  Must travel 3m within a 1m wide track  Collect data (yes, use the stop watch on your phone), calculate car’s speed (distance traveled per unit of time, or S=d/t)  Observe tests of other teams and how their different designs worked  Reconvene your team; begin to evaluate your team’s results RUBBER BAND RACERS – DAY 9 TEST! Rubber band car data Distance traveled within track (m)Time traveled within track (S)Speed (m/S) Test 1 Test 2 Test 3 Average

 In groups, evaluate your team’s results by discussing answers to specific prompts  Proceed prompt by prompt  First discuss your response with your group  Write your response in your journal  Number your response based on the Prompt number  Use complete sentences so the reader does not need to look up the original prompts  See handout for the prompts (page 16 of your science binder)  Decide who on your team will present each prompt – make it as evenly distributed as possible  Pick some one on your team to serve as the official artist; this person will draw a diagram of your final tested design  Be prepared to present the evaluation on Monday! RUBBER BAND RACERS – DAY 10 EVALUATE & COMMUNICATE

 Using prompts on Evaluation handout (page 16 of your science binder), prepare a formal report that communicates your evaluation  Times New Roman, 12 point font  1-inch margins, double-spaced  Be sure to use the rubric to guide your writing of each response  Focus/topic sentence  Specific examples  Detailed explanations  Concluding sentence  Work on this today and tomorrow in lab, due next Wed 10/29  Save on your Google Drive or on Copper Drive RUBBER BAND RACERS EVALUATE & COMMUNICATE

 Final report due Wed 10/29 at beginning of class.  Five (5) points deducted from earned grade for every day late  Before turning it in, be sure you…  Look again at rubric and evaluate your draft; revise it!  Proofread for spelling and grammar  Include non-text requirements  Data tables (one for first model, one for second model)  Plot graph  Two diagrams (one of your final design, one of your ideal design)  To turn it in:  Print it and bring it with you no later than 10/29; OR  “Share it” through Google:  Separately, turn in your data tables, graph, and diagrams by due date RUBBER BAND RACERS COMMUNICATE