1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.

Slides:



Advertisements
Similar presentations
How to center the top roller Current Situation The slider is not centered because the bottom slider was not placed at 6 o’clock ?!
Advertisements

Instructions for making plunger fork tool. Drawing for the trigger assembly.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Optical Manufacturing Solutions 1 Probe Assembly.
Click on this image to open the full PDF document.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
L2000 Technical Training 6. Assemble/Disassemble.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
Instruction Manual for inserting the CMS ZDCs using the crane.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
Solidworks Lesson 5 - Assembly Configurations and Motion
ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.
CMS ZDC Remote Exchange Crane Paul Debbins University of Iowa June 26, 2008.
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Transport & Handling of Detectors TAN Workshop S. Prodon –
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
VETERAN TECHNICAL INSPECTORS ADVANCED SEMINAR 2015.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Handling Discussions LAGUNA-LBNO/Layout Study Group - Friday 19/7/2013 Keith Kershaw EN-HE.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Baby-MIND Modules & Services
A.-L. Perrot, TS/LEA-int LEMIC A.L. Perrot – TS/LEA/int LEMIC
Call to Fix Dell Printer Error Code
Simple Way to Install Auto Lock Door in Car
Mounting a BalanceBox®650 to a brick wall
W201 3R hardboard Replacement Procedure.
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
Reader Swap out Guide.
M200, M200N, M200Z (2½”– 10”) M200A (2½”- 4”).
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
BRAN: LS2-plans TREX M. Palm, E. Bravin, BE-BI-PM.
Presentation transcript:

1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group

2 Several problems fitting in TAN 1.bumps in the ZDC, biggest bumps flattened & threaded rods were inserted through the empty screw holes in the 2 hadronic modules 2.Poor assembly of TAN improved 3.The slope of the LHC, the bottom of the ZDCs has been bevelled 4.Limitations of crane; Paul and Ianos have come up with a much better design that should be much cheaper than option proposed by CERN. (See ZDC_crane.ppt for full details)

3 Partial Vertical Extraction Twin Lead screws (not shown) located vertically between each end of the Lift frame and outer frame pull ZDC from slot..

4 Full Extraction

5 Partial Rotation Clever Bell assembly is rotated slightly upward and out toward transport side of tunnel. Motion is again by a pair of lead screws which span between each set of fixed and rotating leaves.

6 “Clever Bell” mated to Shielding Pig Clever Bell assembly mates on alignment pins to pig. Alignment blocks on sideof TAN allow accurate pre-placement of pig.

7 ZDC Fully lowered into Pig Human intervention then to disconnect ZDC fromcrane. Pig is removed, pig containing copper bars put in place, affixed to crane and procedure reversed. Copper bar module must be built to duplicate the manner in which ZDC attaches to lift frame.

8 Schedule Right hand ZDC will most likely be installed sometime in weeks 7,8 or 9, left sometime between Feb 24 and Apr 9 Getting crane approved and built by then is a great challenge but everyone on ZDC team will work on this KU, Iowa will cover these times but we could do with help

9 Trigger ZDC has very simple “on”, “off” contributions to trigger that will be used for beam tuning, diffraction and heavy ion. Need to start programming frim-ware for this. One student coming to CERN for 3 months, perhaps he could learn how to do this.

10 ZDC => LHCC We have not yet presented ZDC project to LHCC. Skuja approved the the report but we are trying to improve its “look and feel” Oleg and David d’Enterrira are working on this