DPNC Daniel La Marra Activities in the Electronics Group « GrElec »

Slides:



Advertisements
Similar presentations
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Advertisements

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
ABC130 and HCC Submissions F.Anghinolfi 08/02/131ABC Final Design Review.
DPNC Daniel La Marra Activities in 2013 for the Electronics Group « GrElec »
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
LECC COLMAR - Alessandro Gabrielli1 Realization and Test of a 0.25  m Rad-Hard Chip for ALICE ITS Data Acquisition Chain Davide Falchieri - Alessandro.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Mind Board Company Profile Company Profile. Meets the challenge of Meets the challenge of creating complex designs PCB DESIGN CENTER.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
A multi-chip board for X-ray imaging in build-up technology Alessandro Fornaini, NIKHEF, Amsterdam 4 th International Workshop on Radiation Imaging Detectors.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
DPNC Yannick FAVRE Electronics Highlights /12/ Electronics Highlights2 Electronics group  3 Engineers  Daniel La Marra  Stéphane Débieux.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
TLB project status report Laboratoire Leprince Ringuet LLR Polytechnique IN2P3/CNRS Project manager : P. BUSSON (LLR) Technical manager / designer : T.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Status of NA62 straw electronics Webs Covers Services Readout.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Baby-Mind SiPM Front End Electronics
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
BPM stripline acquisition in CLEX Sébastien Vilalte.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Wander baldini on behalf of the SHIP Muon Group
Markus Friedl (HEPHY Vienna)
Calorimeter Mu2e Development electronics Front-end Review
Project definition and organization milestones & work-plan
Baby-Mind SiPM Front End Electronics
Baby-Mind SiPM Front End Electronics
TPC Large Prototype Toward 7 Micromegas modules
CALICE/EUDET Electronics in 2007
Presentation transcript:

DPNC Daniel La Marra Activities in the Electronics Group « GrElec »

18/12/ Electronic Highlights GrElec in 2012  3+1 Electronics Engineers  Daniel La Marra  Stéphane Débieux  Yannick Favre  Alessandro La Rosa IBL  2 Technical Assistants  Gabriel Pelleriti  Javier Mesa 2

18/12/ Electronic Highlights Projects Highlight  ATLAS (LHC)  IBL (upgrade phase )  ABCn130 (upgrade phase2 2022)  Neutrinos  MICE (production)  Astrophysique  LOFT  POLAR 3

18/12/ Electronic Highlights IBL : Local support - stave 4

18/12/ Electronic Highlights IBL : Dressed module with flex 5

18/12/ Electronic Highlights IBL - Loading procedure 6

IBL : Test bench for PCB/Flex Saver production  Purpose : Full production test : ~80 PCB savers, 500 Flex savers  Details : 320 signals / PCB saver : automatic test for short & open circuit on each signal FPGA firmware development for signals stimulus & PC communication (Yannick) PC software development for checking & reporting (Yannick) Test execution (Gaby) Saver under test Checked OK for ID=1 PC interface Flex savers PCB saver Xilinx Stimulus Board HW interface 18/12/ Electronic Highlights7

IBL : IST & beam pipe EMI qualification  Purpose : Screening qualification against ElectroMagnetic Interference  Measurement : Transfer impedance + Screening attenuation vs frequency : Tube under test inserted into a copper tube for environment insensitivity IBL Support Tube (IST) qualification (carbon fiber + Ag glue + end rings) Beam pipe shielding methods investigation & qualification  Hardware : Vector Network Analyzer [100KHz-4GHz] IST Beam Pipe VNA Copper tube enclosure Good shielding Bad shielding Tubes under test 18/12/ Electronic Highlights8

18/12/ Electronic Highlights ABCn-130 : Main improvements ABCn-250New ABCn-130 Technology:250nm130nm # channels: Data rate:40 Mbit/s80 Mbit/s Data flow :VariableFixed (data rate increase) TX Chain (chip to chip) Hardware token signalSoftware Xon/Xoff (more flexibility) Single Event Upset Protection noneConfiguration choice : - Watchdog or - 3X Flip Flop + vote or - Hamming code # buffer levels:12 (L0 & L1 triggers) 9

ABCn-130 : Layout (not final) Submission Scenarios 18/12/ Electronic Highlights Chip size 7900 um x 6700 um  Independent of HCC  Regular MOSIS MPW on 4 th February 2013 (reachable for ABC130, not for HCC)  Shared Engineering run with the NA62/TDCpix submission (forecast 1Q 2013, may be very close to the MOSIS MPW date, but with some flex.)  With HCC :  Engineering Run, attached to HCC schedule Preferred scenario 10

DBB : Digitizer & Buffer Board  Context : MICE experiment (RAL/UK) Electron Muon Ranger detector (EMR) Part of a collaborative team with the Front End Board Board & FPGA design + test : Stéphane Débieux 18/12/ Electronic Highlights11 Mice experiment EMR

DBB : Overview 18/12/ Electronic Highlights12 2 Gigabit transceivers Altera Stratix II FPGA Power Supply : 3 DC/DC LVDS Connections to FEB Connectors for DBBs daisy-chain DAQ SMA Connectors DIP switch for Board ID Connector for FPGA programming

DBB : Current status 18/12/ Electronic Highlights13  Further tests in the lab qualified the DBB for production  54 boards to be produced identically to the first 6 prototypes  2 to 3 months delay expected for the production, delivery in March/April 2013

LOFT : Large Observatory For x-ray Timing  Context : Matter in neutrons Stars & close to black hole event horizon ESA program, launch Wide Field Monitor : high resolution Large Area Detector : 10m² of detector 2-30keV : 6 panels 7x3 modules/panel 4x4 Front End Electonics/modules => 2016 FEE overall : DPNC/ISDC design responsibility  FEE : ~130x70mm Very low noise Silicon Drift Detector technology (used in ALICE) 14 ASICs per FEE, 16 channels/ASIC Chip On Board technology, very small pads (39µ) Bonding: ASIC to SDD (17µ), Through PCB Bonds, ASIC to PCB PCB: Flex-Rigid technology FEE Module Back End Electronics Panel SDD (bottom) 18/12/ Electronic Highlights14

LOFT : Large Observatory For x-ray Timing  FEE Prototype 2012 : Large PCB for measurements access, Small SDDetector Proto, EMC & HV constraints Components: 4 ASICs, linear regulators, digital interfaces, HV/MV filters Labview interface Board Design Schematics + Layout: Yannick Components & ASIC mounting/bonding: Gaby, Maarten Tests : in progress at BOLOGNA SDD location ASIC Trough PCB hole for bonding 75um PCB trace width 39um square pads 18/12/ Electronic Highlights15

POLAR : An instrument to measure Gamma Ray Bursts polarization  2 layers flex with stiffener: Design made by PSI Schematics and Layout was imported into our Cadence tools Modification with close relationship with the mechanics group Added a rigid part (stiffener) Length changed 18/12/ Electronic Highlights16

POLAR : An instrument to measure Gamma Ray Bursts polarization 18/12/ Electronic Highlights17  News in this design: Very small via between 2 layers Hole: 0.09mm Pad: 0.15mm

18/12/ Electronic Highlights Conclusion  This year was going on with some works initiated last year or even before:  IBL  ABCn130  MICE  There was also new works for several different projects like:  LOFT  POLAR  But we also started some studies for new projects like:  NA61 (neutrinos)  DAMPE (astrophysics)  JEM-EUSO (astrophysics) 18