2014 Drought Outreach Workgroup. On March 20 th the Implementing Committee created the 2014 Drought Outreach Workgroup due to the impending drought and.

Slides:



Advertisements
Similar presentations
Shared vision development for the Kiraly street Business case.
Advertisements

Educational Activities 2013 Karen Panetta R1 Educational Activities March 2013.
Bexar Regional Watershed Management Program Bexar Regional Watershed Management Partnership Pre-Proposal Meeting for Bexar County Program Management of.
Monterey County Water Resources Agency Board of Supervisors Regional Urban Water Supply Management Structure April 19, 2004.
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
PROPOSED PRIORITIES FOR SCIENCE AND COLLABORATION OCTOBER 2012.
2014 Drought Outreach Workgroup. Product of approval 1.Approve regional triggers- provide a comprehensive list of conditions, flow levels, and visual.
Consumer information under the new directives Chris Rowsell Senior policy adviser - consumer issues.
The ELSA for Children Legal Research Group. ELSA for Children LRG ELSA for Children.
“Measuring Water Security Progress” 2008 Water Policy Conference AMWA Security Committee March 3, 2008 By Billy Turner, President, Columbus Water Works.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
2014 Drought Outreach Workgroup Triggers. These outreach strategies recommended, must have a specific date, flow level, index well level, river condition,
Financial Affairs Communication Plan. Meeting Attendance & FAR Member Guidelines   FAR members are responsible for disseminating information to the.
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
Progress on Goals Completed/In Place  SDICCCA policy role, Leadership Team, WDC, Sector Task Force – working well  Voting Process, Regional.
City of New Braunfels Edwards Aquifer and the Habitat Conservation Plan HCP Implementing Committee May 29,
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Review of the Operational Procedures and Parliamentary Rules of Conduct of the EAHCP Implementing Committee Implementing Committee Edwards Aquifer HCP.
Starting Student Chapters. Agenda Outreach Develop Student Chapter Startup Documents Coordinate with Student Chapter Sponsor Approval Coordinate with.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
June 2002 San Diego River Watershed Management Plan PROJECT OVERVIEW.
Communications Committee Update Ryan Roberts, NFHP Staff March 9, 2014.
Water Supply Planning Initiative State Water Commission November 22, 2004.
T AXI L IMOUSINE A DVISORY C OMMITTEE C OMMUNICATING AND E NGAGING S TAKEHOLDERS March 25, 2011.
Conservation Action Committee April 17, 2014 Drought Watch 2014 Lake Oroville, 2014.
May I Have Another Helping Of VISPO? Presented at Uvalde, TX October 3, 2014 Rob Hogan Associate Professor & Extension Economist Texas A&M AgriLife Extension.
Stakeholder Committee’s Role. The Stakeholder Committee’s role in Adaptive Management Decision process (AMP) and the HCP Program as follows: Per Funding.
NBWA 2010 Conference Administrative Steering Committee Meeting- May 14, 2009 Target dates *One Friday in April- April 2, 9, or 16 Location Sheraton, Petaluma.
2015 HCP Work Plan Schedule Tuesday, June 3 rd Submit all comments to HCP Program Manager. Wednesday, June 4 th EAHCP Staff will distribute comments to.
California Drought Contingency Plan Update 2013 Project Team Meeting May 31,
Planning and Community Development Department Housing Element City Council February 03, 2014.
Briefing on Progress made with regard to Prevention and Management of Child Abuse and Neglect Especially Child Sexual Abuse Presentation at the Portfolio.
2014 Drought Outreach Workgroup Introduction.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Planned Public Relations
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Communications Committee Update National Fish Habitat Board Meeting November 5-6, 2014.
TEXAS NODAL: THE BASICS Presentation to ERCOT Technical Advisory Committee Workgroup June 25, 2003.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Working Group 3: Emergency Alert Systems Status Update December 3, 2015 Kelly Williams, Co-Chair National Association of Broadcasters Steve Johnson, Co-Chair.
Drinking Water Source Protection Ministry of the Environment Source Protection Programs Branch March 2010.
How: Overview of Action Plan and Data Utilization Shane McNeill, Director Office of Healthy Schools.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
NATIONAL ACTION PLAN: Priorities for Managing Freshwater Resources in a Changing Climate June
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
California Water Plan Old and New Steve Macaulay, Executive Director.
Background Founded in 1985 to protect the river's flow, natural beauty, purity, watersheds, estuaries and endangered species Run by one staff member.
2004 Annual NAFSA Conference FBIE-SIG Presentation Foreign Born International Educator SIG Open Meeting 2004 NAFSA 56th Annual.
COMET Working Group Progress Report. Purpose of Report Provide Team Updates Potential Future Voting Items Draft Competitive Meter Ownership Timeline.
Progress to Date – July 2014 Purpose statement: Rethink scrap tires as a resource – not a waste. Develop actions to effectively manage scrap tires as a.
Overcoming HIV/AIDS Epidemics in Ukraine: GFATM Project Update Presentation by Andriy Klepikov at the Second Stakeholders’ Meeting Kyiv, June 3, 2004.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #4 June 18 – July 15.
Working Group 3: Emergency Alert Systems Status Update March 16, 2016 Kelly Williams, Co-Chair National Association of Broadcasters Steve Johnson, Co-Chair.
Dr. Thomas Hardy Chief Science Officer River Systems Institute Texas State University.
REGION H Water Planning Group Freese and Nichols, Inc. | LBG-Guyton Associates | Ekistics Corporation DEVELOPING THE REGION H 2016 REGIONAL WATER PLAN.
> Las Vegas Valley Watershed Advisory Committee Regional Water Quality Plan.
Inaugural PIER Working Group Meeting Fort Bend County, TX August 7, 2008.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Drought in Texas Texas Division of Emergency Management
Implementing the Transportation/Land Use Connection Program
San Marcos & Texas State
Presentation and update on the development of the EAHCP Data Management Program Alicia March 17, 2016.
Request for Extension of the Implementing Agreement for …… (xxx IA)
TIBC Budget Formulation Improvement Project
Request for Extension of the Implementing Agreement for …… (xxx IA)
Initiatives Oversight Committee Update on Other Activities
Central Ohio Intelligent Transportation System (ITS) Committee
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
CoC Coordinator & Lead Agency Compliance & Evaluation
Presentation transcript:

2014 Drought Outreach Workgroup

On March 20 th the Implementing Committee created the 2014 Drought Outreach Workgroup due to the impending drought and need to consider and evaluate potential outreach strategies that could be utilized by the Implementing Committee members to communicate positive regional messages.

The purpose of the DOW is to consider and evaluate potential outreach strategies that could be utilized by Implementing Committee members in a coordinated manner to collaboratively raise awareness and understanding, by providing the public with information and updates about current drought conditions, HCP conservation measures and springflow protection measure implementation.

These outreach strategies recommended, must have a specific date, flow level, index well level, river condition, or other defined trigger for implementation or distribution

Each Implementing Committee member has appointed a representative At any point the DOW members can request additional information to be presented EAHCP PM will facilitate these meetings and give regular updates back to the IC

City of New Braunfels Steve Ramsey Alternate: Zac Martin City of San Marcos Jan Klein Alternate: TBD Edwards Aquifer Authority Elizabeth Smith Alternate: Terri Herbold Guadalupe-Blanco River Authority LaMarriol Smith Alternate: Todd Vottler Texas State University Shane Townsend Alternate: Emily Warren San Antonio Water System William Peche Alternate: TBD

All recommendations are to be presented to the Implementing Committee on June 19 th

Retention of Services by John Boggess: 1.Communicate with workgroup members between meetings 2.Draft media outreach pieces 3.Recommend preferred media types 4.Provide marketing expertise as needed

Drought Outreach Progress Currently the workgroup has provided two press releases to be approved for distribution by the Implementing Committee on May 29 th : 1.General Positive Messaging of the EAHCP 2.Provision M Additionally a Draft-Press Release Packet has been distributed and is currently being reviewed for approval.