Presentation is loading. Please wait.

Presentation is loading. Please wait.

San Marcos & Texas State

Similar presentations


Presentation on theme: "San Marcos & Texas State"— Presentation transcript:

1 San Marcos & Texas State
2017 Nonroutine Adaptive Management San Marcos & Texas State Water Quality Protection Measures Presentation to the IC EAHCP Program Manager February 2017

2 Introduction Over the course of implementing the Conservation Measures associated with water quality protection in San Marcos, challenges, obstacles, and problems have been identified Analysis conducted through the EAHCP supported WQPP research & development as well as through the larger WPP process HCP provides a mechanism—the Adaptive Management Process—to address this issue

3 Water Quality Measures Affected
City of San Marcos HCP § Sediment Removal below Sewell Park HCP § Minimizing Impacts of Contaminated Runoff HCP § Impervious Cover/Water Quality Protection Texas State University HCP § Sediment Removal in Spring Lake & Dam to City Park HCP § Sessom Creek Sand Bar Removal

4

5 IC MEETING HERE City Park BMP Downtown BMP Hopkins BMP Veramendi BMP Hopkins BMP

6 Performance Comparisons
Comparison Metric Veramendi BMP Downtown BMP Surface Area Capture 0.18 acres 32 acres Total P Removed/Year 8.5 lbs 24.2 lbs Comparison Metric Hopkins BMP City Park BMP Surface Area Capture 0.1 acre 11 acres Total P Removed/Year 6.4 lbs 16 lbs

7 Water Quality AMP #1 Timeline
BACKGROUND Water Quality AMP #1 Timeline Mar 2 PM submits AMP proposal #1 (“Minimizing Impacts”) Mar 8 SC possibly recommends proposal & evaluation. SC provides input on designs. Mar 16 SH possibly recommends proposal. IC possibly approves proposal and USFWS letter.

8 Sessom Creek Watershed
Reach-based restoration recommended

9 Sessom Creek Watershed

10 Water Quality AMP #2 Timeline
BACKGROUND Water Quality AMP #2 Timeline March 8 SC will endorse the creation of a Work Group. July 31 PM submits AMP proposal #2 (“Sediment Removal/Water Quality Protection...”) Aug 7 SC possibly recommends proposal & evaluation. Sept 21 SH possibly recommends proposal. IC possibly approves proposal and USFWS letter.


Download ppt "San Marcos & Texas State"

Similar presentations


Ads by Google