8800 Richmond Highway Redevelopment working together to redevelop and clean up the environment.

Slides:



Advertisements
Similar presentations
Kitchen Creek CREP & Stream Bank Stabilization Project Project Sponsors: Greenbrier Valley Conservation District West Virginia Conservation Agency U.S.D.A.
Advertisements

LID Overview Low Impact Development “Redefining Storm Water” In Mecklenburg County Presented by: David Woodie, PE, CPSWQ Project Manager, Charlotte-Mecklenburg.
Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Kirby & Richmond. D C A B KIRBY 3 Lanes each way Center continuous turning lane Utilities Run along the West side Green space on the side between street.
Regulatory Context Natural Environment Chapter Tukwila Comprehensive Plan.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Lake and Streambed Alteration Program (1600). Department’s Mission:  The Mission of the Department of Fish and Game is to manage California's diverse.
Don Edwards San Francisco Bay National Wildlife Refuge Where Wildlife Comes First!
Florida Water Forum Everglades Restoration June 3, 2011.
West Sacramento’s The Bridge District Green Streets: A Case Study Current Trends and Case Studies in Low Impact Development October 6, 2010.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
ZMA Out of Bounds Insert Image or map. Vicinity Map.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
South West Study Area Introduction ► Summary of Study Area ► Unified Development Code Amendments ► Points of Interest ► Staff Recommendation ► Review.
Floyd County Public Meeting Amendment to the County Comprehensive Plan and Zoning Ordinance for New Albany Township Area.
Jefferson County Parks Initiative David Heyman and Brian Wright.
Center for Watershed Protection USDA Forest Service, Northeastern Area, State and Private Forestry How to estimate future forest cover in a watershed.
Community Development Department Neoga Lakes – Development of Regional Impact (DRI) Master Planned Development (MPD) Rezoning Application.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Assessment of Riparian Buffer Reestablishment in Stevens-Rugg Brook Assessment of Riparian Buffer Reestablishment in Stevens-Rugg Brook Jessica Etzkin,
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
CHAPEL HILL HIGH SCHOOL ISLAND PROJECT Water: The Essential Ingredient & Thoughts for Sustainability ©Town of Chapel Hill Stormwater Management Division.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Community Development Department Special Exceptions for: Automotive parts (e.g. accessories and tires) and Automotive, Recreational Vehicle, and Boat Dealers.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Site Suitability for Lake Overholser Cassi Poor CRP 551.
NEWPORT POINTE COUNTY FILES: GP# , RZ# , SD# , AND DP# BOARD OF SUPERVISORS HEARING June 4, 2013.
University Storage and Office Orange County Board of County Commissioners Amendment S-5-1 and LUPA January 27, 2015.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Natural vs. Accelerated Soil Erosion Natural geologic erosion has occurred at a relatively slow rate since the earth was formed. Natural erosion produces.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Real Estate is Great at Judge Fite. FOR SALE 281 Acres on Highway 380 Greenville, TX Perfect for almost any development – commercial, warehousing or residential.
Green Infrastructure Techniques Runoff Reduction by Area Conservation of natural areas Conservation of natural areas Vegetated buffer, filter strip and.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Colorado Front Range Trail Corridor Plan Colorado Front Range Trail Corridor Plan.
Community Development Department COUNTRY CLUB HARBOR SINGLE FAMILY RESIDENTIAL-2 AND PARKS & GREENWAYS ZONING DISTRICTS REZONING APPLICATION #2511.
Request: rezone 32 acres from PD-OP (Office Park) to R-16 (Residential) & PD-CC-CC (Commercial Center) – 128 multifamily units & 260,000 sf retail and.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
“ Grand Landings North” Comprehensive Plan Amendment & Rezoning City Council Public Hearing March 3, 2015.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
CDP Application No Integral Communities 500 California Hwy 75, City of Imperial Beach CCC Hearing Item Th24b August 13, 2015.
Land Uses & Water Pollution Sources By Joan Schumaker Chadde, Western U.P. Center for Science, Mathematics and Environmental Education. All photos by Chadde,
Pittsylvania County: A Review of Setback Considerations.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
Community Development Department Ryan’s Landing Planned Unit Development Application No
City Council Meeting – January 10, 2007 Rezoning Application No Salters Creek Material Recovery Facility.
Community Development Department MADISON GREEN AND TUSCAN RESERVE MASTER PLANNED DEVELOPMENT AMENDMENT APPLICATION #2616.
VILLA AMADOR VICINITY MAP. CASE SPECIFICS Subject properties encompass ± acres –Entails 10 parcels of land –Located south of Amador Avenue, west.
July 11, 2017.
Jefferson County SA Red Rocks Site Approval
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
Jefferson County Planning Commission Hearing April 10, 2013
WVAR Sierra RV S. Virginia Street (old 395 S)
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Potholes Supplemental Feed Route Project
Land Uses & Water Pollution Sources
Land Uses & Water Pollution Sources
Kristel Riddervold Environmental Sustainability Manager
Agricultural Order 4.0 Discussion
Presentation transcript:

8800 Richmond Highway Redevelopment working together to redevelop and clean up the environment

site area image IMP Bldg. to the SW and Sacramento Center to the NE, Park Authority pond to the North

Southern End of Richmond Highway Little sense of community—this can change No sense of place—destination— this can change Woodlawn is next door—great opportunity Lets build on to the Woodlawn Vibe Create a place for families Clean up the stream bed Create a community focused front door to the Park Authority Pond area—with its diverse wildlife of birds and small mammals

MVCCA Asked for an out of turn amendment to add residential to this area Gerry Hyland supports the MVCCA out of turn amendment to add a residential option to this part of the commercial zoned land on Richmond highway – this can be the first step We propose to work with the staff to begin the process of changing the C-8 zoned site to residential in keeping with the MVCCA proposal Staff has not moved forward with the Comp Plan amendment this will push the envelope

Site boundary; zoned C-8 and R-2 about 8 acres total

A Problem site that with the right approach has significant potential Was an amusement park from 1947 until the late 1960’s—still owned by the same family Was a spoil site for the state and county for Richmond Highway construction 1960’s Has been in C-8 zoning and used as a contractors offices, shops and storage, repair facilities & etc since not appropriate land use and poor front door on Richmond Highway The Family “gave” most of the small lake, Island and park area to the Park Authority in the 1960’s

8800 site frontage…. hiding an on site mess

Stream Tour: adjacent stream and bridge after 4 days of rain Bridge & sewer manhole in stream to show FP after 4 days of heavy rain note top 1’ Manhole out of 100 year FP

Normal flow view of stream 3/31/14 next slide high flow

Stream Bed at southern part of the site near bridge Note the Channel is Nicely Defined, But channel undercut and see after 4 days of heavy rain

Upstream views of channel: concrete chunks from ?

Site area adjacent to stream bed, concrete slab and remnants of old amusement park

Remnant of old pond from Amusement Park and from former Beaver activity C

From site pond (note impervious area) looking to the Park Authority pond area to the West

Part of the pond is within the property boundary: Also note that structures & storage is right up to the pond area

Lets look on site: it’s not a clean site and impervious both in and out of the FP

More on site environmental problems and site operations, some recently “cleaned”

Examples of on-site imperviousness

Most of the site is macadam/concrete/crushed rock

Toward the rear of the site looking south west to the Park Authority pond from logging operation on site

What we propose Remove the welding shop, boat repair, on site storage of waste soil, wood chipping operation clean up the flood plain of the concrete, macadam and etc, etc, etc Stop the site from continuing to pollute Clean up the stream bed Establish hard riparian buffers to the stream bed and Park Pond/Lake Tree save and restoration Restore the environmental integrity of the site

To do this We will create a higher end market rate townhouse community—create a sense of place and connectivity We will need to change the RPA boundary as it now covers the entire site and clearly the site is no RPA—rather a degraded environmental site This is an 8 acre site and we propose to develop 4 or more acres which will necessitate that we fill some of the FP probably 1.5 acres This will result in 3 up to 4 inches of FP increase up stream on the Park Authority Pond/Lake

Next Steps: Hope for community “buy in” and: We finalize a development plan Return to the 3 MVCCA committees with a Development Plan Meet with the Engleside and other Community Associations concurrently File a rezoning application and ask Supervisor Hyland concurrent “AKA Just in time Comp Plan Amendment” in furtherance of the MVCCA Plan amendment proposal File for an RPA exception concurrently File a “Fill in the FP” plan/application concurrently PC and BOS Hearings hopefully by end of October

Construction Single point of access—right in and right out only Upon approval of site plan “conduct site clean up, delineation of sensitive areas” Remove all concrete footings in FP restore the FP which is now all in impervious surfaces Do Riparian buffer/filter area along stream bed Carry out stream bank restoration Tree save areas and new plantings to restore where needed Recycle any on site material that can be recycled