Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

NOTICE SUBMISSIONS Requirements and Procedures 1.
Tam Valley School Modernization - Phase 1 Summer 2011.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
CORE DESIGN.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
May 6, 2010 Irvine Unified School District HMC Architects.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
AOC Presentation to DBIA
LOCAL ASSISTANCE 5 – YEAR PLAN Facilities Department Mark Thissell.
VOLUSIA COUNTY’S HISTORIC COURT HOUSE Volusia County was created by an act of the Florida Legislature in December …to date four courthouses have.
“TOD” Development Opportunity Case Studies for Reference & Historic Preservation Opportunities Moline, Illinois October 18, 2011.
SCHEMATIC DESIGN PRESENTATION
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Skinner Building, Seattle Team:BenBruceCarriePegRichardRobert.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
Design IX – Technology V Environmental Systems Lecture Overview Linking Architects to Systems Communicating Conceptual Understanding The Checklist Basic.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
WHAT IS MEP?. WHAT IS MEP? MECHANICAL ELECTRICAL PLUMBING SERVICES.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Building Codes and Interior Design
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Phoenix Convention Center Phoenix, Arizona Retrofits of Existing Distributed and District Systems: Case Studies [Track Title][Session Title] Robert R.
Successfully Diverse Partnerships = Economic Impact ACEC Indiana 10 th Annual Diversity Network Fair Shannetta Griffin, P.E.
Tangible Property Regulations Presented by David W. Jennings, CPA.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Southeast Financial Center
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Potomac Hill Campus Master Plan Preliminary Planning Principles “Observing the Past, Planning the Future” Campus Master Plan Potomac Hill.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Tyler Junior College Critical Infrastructure & Renovation Update Spring 2010.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
Planning & Community Development Department 180 South Euclid Avenue Demolition of Existing Structure Consolidated Design Review (Appeal) City Council June.
Recruit, Train, and Educate Airmen to Deliver Airpower for America ENJJPT Steering Committee Briefing Facility Projects Mr. Christopher Coppala Air Education.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
White Pigeon Community Schools
JOHN A. HOLMES IMMEDIATE FACILITY NEEDS
Fun Facts: James M. Bennett High School
The photo is showing the south side of the building and configuration of the exterior side of the windows. Page 1, 2, and 3 of the Pella Window Elevation.
Cornwall Central School District
Library of Parliament in Ottawa
Condominiums Association
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Designing the tiny house
The Asset Management Journey for Building Assets
Recent Bond Accomplishments
Westerly School Legacy Plan: A Vision for the Future of Education
Presentation transcript:

Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012

2 Capitol Campus

3 AOC Organizational Chart

West Refrigeration Plant SUPREME COURT MODERNIZATION U.S. CAPITOL VISITOR CENTER

west refrigeration Project DOME SKIRT POST-ELECTION MOVESBartholdi Fountain Restoration

9 Procurement Overview (Conducting Business with the AOC)

10 Authority for the AOC Permanent authority for maintenance and care of the U.S. Capitol given to the AOC by Congress on August 15, 1876 Procurement authority is generally found in Titles 2 and 41 of the United States Code

11 Competition Requirements Competition required for all procurements > $5,000 General exceptions –Only one source available –Emergencies 11

12 Advertising Requirements Requirements > $100,000 are advertised and posted on FedBizOpps (FBO) Search under “Agencies” for “Architect of the Capitol”

13 AOC and the Federal Acquisition Regulation (FAR) The FAR was developed for use by the Executive Branch AOC is not subject to the FAR, but generally aligns with the FAR 13

14 Upcoming Major Projects Dome Rehabilitation Phase II: Complete restoration of the exterior and interior of the cast iron shell Replacement of essential systems Restoration of the inner dome rotunda area Solicitation anticipated in summer 2012

15 Upcoming Major Projects Refrigeration Plant Revitalization, Phases I and II: Relocation of existing chillers Installation of new chillers and cooling towers Modification of chilled water and condenser water piping Installation of associated pumps, controls and electrical components Solicitation anticipated in spring 2012

16 Upcoming Major Projects Cannon Renewal –Replace infrastructure –Compliance with building codes and standards –Enhance effectiveness –Preserve historic character –Improve security –Meet sustainability goals CMa and CMc solicitations underway

17 Cannon Building – Physical Features Completed in ,791 gross square feet (excluding garage) 490,300 occupiable square feet (excluding garage) 6 levels (including basement) 142 Member suites 4 Committee Hearing Rooms 316 underground parking spaces Monumental Rotunda has historically served as the main building entry and defining feature of the interior

18 Cannon Potential Areas for Improvement Replace Outdated Systems Provide energy efficient and code compliant building systems Improve size and accessibility of utility rooms

19 Improve Energy Efficiency Upgrade exterior building envelope Replace building systems Cannon Potential Areas for Improvement

20 Address Life Safety Modernize systems Fire alarm Emergency communications Sprinklers Improve Rotunda code compliance Address hazardous materials Cannon Potential Areas for Improvement

21 Improve Accessibility Address building access Upgrade toilet rooms Expand elevator platforms Provide hearing room access Cannon Potential Areas for Improvement

22 Enhance Member Suites Upgrade Multi-function center bay Provide more efficient staff areas Cannon Potential Areas for Improvement

23 Improve Elevator Service Car capacities/ configurations Fifth Floor service Single dedicated freight car Cannon Potential Areas for Improvement

24 Cannon Potential Building System Upgrades Upgrade Mechanical Systems Upgrade utility rooms Utilize center court distribution tunnel

25 Cannon Potential Building System Upgrades Reuse Existing Shafts

26 Upgrade Electrical Systems Establish dedicated closets on each wing and on each floor Upgrade switchgear, network transformers and network protectors Add emergency generators Provide central lighting controls Cannon Potential Building System Upgrades

27 Cannon Proposed Structural Systems Modifications Address Structural Elements Add new elevator hoistways Provide new vertical shafts for utility distribution Raise fifth floor wall and roof structure Create basement utility rooms through removal of bearing walls Meet seismic requirements

28 Cannon Exterior Preservation Renew Exterior Envelope Reconstruct Independence Avenue terrace wall Repair stone modillions Repair center courtyard façades

29 Cannon Exterior Preservation Renew Exterior Envelope Clean, repair and stabilize stone Provide bird deterrence

30 Cannon Exterior Preservation Renew Exterior Envelope Restore original windows and one original door Replace remainder of exterior doors Preserve Historic Landscape Retain specimen trees and planting around site

31 Thank You! Michelle Kayon