TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.

Slides:



Advertisements
Similar presentations
Summer Internship Program Outline
Advertisements

Title Slide – Technology or Company Name
Roadmap for Sourcing Decision Review Board (DRB)
Chapter 2 Analyzing the Business Case.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Project Proposal Project ? Project Sponsor Project Manager Version
Chapter 3 Project Initiation
Analyzing the Business Case
Chapter 5: Project Scope Management
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
REPORT WRITING AND COST ESTIMATING CE 3372 Lecture 09.
Concept Analysis Document Executive Summary Template, (To view template instructions – Save this template to project files, reopen and then select View,
Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC) [Insert Project Name] Project Baseline Review (PBR) [Insert Date of PBR] 1.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
1 Part 5: Closing Task 1 Kelvin asked you to help him prepare and present the final project presentation. Prepare a short presentation to summarize result.
Initiating and Planning Systems Development projects
S/W Project Management
1 Framework Programme 7 Guide for Applicants
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Training Needs Analysis Report Rapid Analysis and Design (RAD)
IENG 471 Facilities Planning
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 6/25/2015 V2.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Research & Technology Implementation TxDOT RTI OFFICE.
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
NATIONAL INSTITUTES OF HEALTH CHALLENGE GRANT APPLICATIONS Dan Hoyt Survey, Statistics, and Psychometrics(SSP) Core Facility March 11, 2009.
6/3/2016 IENG 471 Facilities Planning 1 IENG 465 – Final Design Project Report & Presentation Requirements.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Design Proposal A document prepared to (a) justify the need for the project, (b) describe the engineering process to be taken, (c) outline the expected.
DESIGN PROPOSAL REPORT. Why write a proposal? Basic means of convincing someone to support a project. Important tool for organizing time and resources.
1 Name of Lead Organization (Name of Lead Principal Investigator) PULSE Proposal Full Template Key Graphic(s) (REPLACE THIS BOX AND INSERT FIGURE(S) AND.
Chapter 3 Strategic Information Systems Planning.
1 NASA WBS TASK #: QUARTERLY TECHNICAL PROGRESS REVIEW TASK # & TITLE:06-0xxxx Assessment of Electronic Widgets - Radiation QUARTER:XQ FY06.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
CE 3372 WATER SYSTEMS DESIGN Lecture 09: Report writing and cost estimating.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
The Project Plan Plan Your Work, then Work Your Plan
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
2/27/2016 IENG 471 Facilities Planning 1 IENG 464 – Conceptual Design Project Report & Presentation Requirements.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
UNCLASSIFIED DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and their contractors. Other requests for this document shall.
A research proposal is a document written for the purpose of obtaining funding for a research project.
Systems Analysis & Design 7 th Edition Chapter 2.
Objective: Develop hybrid biological semiconductors which are EMP resistant and whose electronic properties can be directly manipulated by environmental.
Principal Investigator ESTCP Selection Meeting
Module 8: Effective Innovation Review and Selection Process
Project Management – PTM721S
Systems Analysis and Design in a Changing World, 4th Edition
Principal Investigator ESTCP Selection Meeting
Name of Small Business location
CLINICAL INFORMATION SYSTEM
Project Management Process Groups
Natural Gas Innovation Fund Investment Intake Template Project Title Submitted By *Note: This template is intended as a guide on content; you may.
Employee engagement Delivery guide
Principal Investigator ESTCP Selection Meeting
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
SDTC Application For Funding
Executive Project Kickoff
Principal Investigator ESTCP Selection Meeting
Natural Gas Innovation Fund Investment Intake Template
Radiopharmaceutical Production
(Insert Title of Project Here) Kickoff Meeting
Presentation transcript:

TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE

Project Team ● List the PI and co-performer(s) names and organization(s). ● Do not use this slide if there is only one organization involved in the project. NOTE: This template provides the recommended number of slides for each section of the presentation, which should take no more than 30 minutes. 2

Problem Statement ● Clearly state the energy problem the technology demonstration will address and its relevance and importance to DoD. ● Identify the current approach (if one exists) to this problem and its shortcomings. NOTE: Limit to one slide only. 3

Technical Objectives ● Briefly describe the technical objective(s) of the project. NOTES: 1. Limit to one slide only. 2. This section is meant to orient the ESTCP Technical Committee on the overall objectives of the project. 4

Technology/Methodology Description ● Describe the technology or methodology in sufficient detail to provide an accurate and factual understanding of its theory, functionality, and operation. ● As appropriate, provide an overall schematic or flow diagram. ● Discuss how the technology or methodology is innovative. NOTE: Limit to two to three slides. 5

Technology/Methodology Maturity ● Provide evidence that the technology or methodology is mature enough for demonstration.  Provide a brief description of any previous related demonstrations.  Discuss any additional development, design work required prior to demonstration. NOTE: Limit to two slides. 6

Technical Approach ● Provide an overview of how the project will address the technical objectives. ● Describe the proposed demonstration site(s). Highlight desired site characteristics for an optimal demonstration. ● Provide the performance objectives. ● Provide a broad overview of the test design. Discuss the scope of the proposed demonstration and relate the planned data collection to the performance objectives. ● Describe the planned data analyses the project team will use to assess the performance objectives. NOTE: This section should consist of several slides and should be the focus of the presentation. 7

Technical Risks ● Identify potential issues of concern and technical risks in taking the technology or methodology from its current phase of development to the proposed scale of the demonstration. ● Identify any assumptions that have been made that, if not realized, could impact the successful implementation of the project. ● Discuss planned risk management. ● If the demonstration is not at full scale, discuss any scale-up issues that may remain at the conclusion of a successful demonstration. NOTE: Limit to one slide only. 8

Related Efforts ● Provide information on any relationship to other similar projects. ● Identify funding sources for the related efforts. NOTE: Limit to one slide only. 9

Expected DoD Benefit ● Describe the expected benefit in terms of energy security, energy savings, and/or reduced cost. ● Provide realistic projections of the number of DoD sites or facilities where the technology or methodology can be deployed. ● Discuss how the information obtained from the demonstration will enable adoption of the technology or methodology throughout DoD. ● Discuss the life cycle cost and advantages over current approaches. ● Discuss the projected economic benefit of the project in terms of simple payback and savings-to-investment ratio. NOTE: Limit to one to two slides. 10

Schedule of Milestones Tasks Q1Q2Q3Q4Q5Q6Q7Q8Q9Q10Q11Q12 1. Title 2. Title 3. Title 4. Title 5. Reporting DP FR C&P DP – Demonstration Plan FR – Final Report C&P – Cost & Performance Report Provide a project schedule with expected milestones and deliverables for the duration of the project in the form of a Gantt chart (example below). Include required ESTCP deliverables outlined in the full proposal instructions. * Identify any decisions points. * 11

Schedule of Milestones (continued) ● Highlight any emissions, environmental, operational or other permits required and briefly address the permitting process. ● Highlight any electrical or other interconnection agreements required and briefly address the process to develop and gain approval of the agreement(s). NOTE: Limit to previous slide plus one additional slide. 12

Technology Transition ● Describe the method by which the technology or methodology will be transitioned to end user(s) or commercialized. ● Describe any proposed guidance documents that will assist in future implementation (i.e., guidance, design, and/or protocol documents). ● Explicitly identify potential first DoD users and follow-on implementation. ● Identify any DoD or service programs that are responsible for technology or methodology implementation or relevant requirements or regulations that will affect transition. ● Address any potential constraints imposed by the use of proprietary systems. NOTE: Limit to one to two slides. 13

Cost Estimate ● Provide a table that summarizes how you expect to execute ESTCP funds by performer by project year, rounded to the nearest dollar (in accordance with the cost spreadsheets templates). Performer Year 1 ($K)Year 2 ($K)Year 3 ($K) Performer Performer 2100 Performer 350 Total Grand Total700 14

Project Leveraged Funding ● Provide a table that delineates all leveraged funding for the project for each fiscal year. This should include direct funding support and in-kind support. If a performer is providing support (for example, XYZ Co. is receiving ESTCP funds but also providing in-kind support), then that should be indicated. PerformerYear 1 ($K)Year 2 ($K)Year 3 ($K) Funding Source 1*2550 Funding Source 2*7565 Performer 3**30 Total Grand Total420 * Direct Funding Support ** In-Kind Support 15

Backup Slides

ESTCP Review Comments ● Provide a summary of the ESTCP review comments and responses here. ● Include any other support material here. 17