BIM from Concept to Completion Presented by: Darren R. Hartman, P.E., LEED AP (Vice President) Thornton Tomasetti November 16, 2010.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Principle 2 Promoting the public good. Because the public sector is the mechanism through which governments deliver programs and services for the benefit.
BIM: Beyond Clash Detection BIM: BEYOND CLASH DETECTIO N A Jobsite Level Perspective THE BIG PICTURE DESIGN & DETAILING INSTALLATION PLANNING TRACKING.
REVOLUTIONARY BUILDING SYSTEM TM. TIMECOSTENERGY THE PROBLEM A NEED FOR INNOVATION.
Prince2 – The useful bits…. Objective… Quick intro to Prince2 and how key elements were adopted at Salford Present a simple structured approach to organising.
© 2009 Autodesk Autodesk’s Commitment to BIM-MEP AUS Rob Malkin, Director ANZ Architecture, Engineering and Construction.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
© 2010 Bentley Systems, Incorporated Ron Gant, P.E., Bentley Systems, Inc. Virtual Design & Construction: 3D Information Modeling.
1 STEEL BUILDING EXTERIOR WALL INTERFACE ISSUES Rocky Mountain Steel Construction Association Structural Engineers Association of Colorado Structural Engineers.
Florence Fennel Corporate Resumé We, at Florence are a full service brokerage company, we provide sellers and buyers with innovative and absolute new real.
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
Tesla CADD Inc. An Architectural & Engineering Company.
06/06/07 – 07/11/07 BIM Building Information Modeling.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Structural Engineering Consulting Firm Established 1997 Omaha, NE 22 Employees Including 11 Engineers Licensed in over 30 states.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks The Precast Concrete Industry A proposal for the adoption.
1 The prefabricated metal buildings A strategy for the adoption of advanced Information Technologies.
Construction Project Management: Technology driven answers for schedule and budget savings.
OUR GOAL IS TO BE THE BEST BUILDER IN AMERICA. High Performance Teaming Presenters: Bob Betz Senior Vice President – McCarthy Building Companies, Inc.
Collaboration BIM Curriculum 05. Topics  Internal Collaboration  Office Organization  Teamwork  Hotlinks  Complex Projects.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
1 let us help you create P.O Box No Dubai Media City Dubai United Arab Emirates T web.
An Introduction To Food Service Consulting FCSI & AIA Working Together.
© 2012 Autodesk How to Get the Most from Integrated Project Delivery (IPD) David J. Patera Team Project Manager & VDC Coordinator.
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Intelligent Services and Tools for Concurrent Engineering Proposal number : IST AEC3 Structural Information Model Dr. Thomas Liebich Jeffrey.
© 2006 Bentley Systems, Inc. Bentley Building Solutions multidisciplinary, integrated design and analysis.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
MANAGEMENT | RETAIL | STRATEGY | PERFORMANCE. Insert photo here Cameron + Associates Management Inc. Project Management.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Palomar Medical Center West: Segmented Review Process.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Presented by: Dr. Kerry M. Joels, TMA Systems NFM&T 2012.
BIM & FM in Hong Kong Public Rental Housing Projects.
BIM October-2014Dr. Walid Al-Awad 1 Building Information Modelling.
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
GAME:IT The Engineering Design Cycle. GAME:IT THE DESIGN CYCLE  The basic steps of design are the same if you are building a bridge, house, skyscraper.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
IRC Research and Technology Forum B uilding I nformation M odeling by Bill Wiseman, P.E. Sr. V.P. Hixson Inc. Director of Operations.
Nucor Building Systems BIM WITH TEKLA 3D DIGITAL BUILDING INFORMATION MODELING.
advices for advancing the productivity of the construction industry:
Best practices and obstacles in implementation of BIM into education
Joseph Uno, LEED AP BD+C J. Uno & Associates, Inc.
DESIGN TOOLS UPDATE.
Design – BIM – Build – Operate
7D 6D 5D 4D 3D bIM Dimensions bIM Services ESTIMATING
SC Railing Company Overview
Copyright Scott Bloss, All rights reserved.
Becoming a Successful Construction Manager
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
American Institute of Constructors
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.

Your Facility Your Information
ELECTRICAL ESTIMATING SOLUTIONS, PROVIDING BEST SERVICES IN AUSTRALIA.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
DBIA Manual of Practice
Presentation transcript:

BIM from Concept to Completion Presented by: Darren R. Hartman, P.E., LEED AP (Vice President) Thornton Tomasetti November 16, 2010

Who We Are

Our Mission To collaborate with clients to create the best building solutions for the entire building lifespan. Our Values  Collaboration: Listening is not a spectator sport. We seek out ideas and goals and build upon them.  Creativity: We are driven by original ideas.  Commitment to excellence: Attention to the details, while keeping our eye on the big picture.  Caring: Doing the right thing for our clients, our colleagues and our communities.  Our Vision Always reinvent how buildings are imagined - and built. Our Guiding Principles

Where We Work  12 U.S. Offices, Abu Dhabi, Dubai, London, Moscow, Shanghai, Hong Kong

Our Market Sectors Aviation & Transportation Commercial Cultural & Institutional Education Healthcare Hospitality & Gaming Parking Residential Special Structures Sports & Entertainment Our Practice Areas Building Structure Building Skin Building Performance

The BIM Concept

The Current BIM Concept  Who’s Involved?  Architect  Engineer  Mechanical  What’s Involved?  Clash Detection  3-Dimensional Modeling  Coordination of Mechanical Systems It is a Linear Process

Our BIM Concept BIM is more than just clash checking and 3D modeling. This is a process that’s maintained throughout the entire project. By doing more of the process, we establish expertise for each of the disciplines. We can do the work ourselves or we can coordinate the work more effectively.

Share and Deliver MEP Contractor BIM Architect Engineer Subcontractors Fabricators Time to embrace model sharing and designer/contractor collaboration Owner

Construction Support Services Integrated Modeling Services

Detailing During Design Using Tekla  Phase I (Mill Order Model)  Phase II (Connected Model)  Phase III (Drawing Extraction)  Precast and Cast-in-Place Construction Support Services Integrated Modeling Services

Steel Detailing During Design Using Tekla Structures Integrated Modeling Services

 Main framing members in Tekla  Digital model used directly by contractors –Advanced Bill of Materials (ABM) –More accurate material take off for bid –Reduce overall schedule Phase I – “Mill Order Model”

Integrated Modeling Services Phase I – Design Drawings

Integrated Modeling Services  Selected connections completely detailed in Tekla  Lateral system major details  Long-span major details  Others are project-specific  Connection designs in 3D model  Fabrication starts sooner  Design intent clear  Project complexity clear  Owner gets digital 3D model file  Ready for steel fabricator detailers to create shop drawings Phase II – “Connected Model”

Integrated Modeling Services Phase II – Design Drawings

Integrated Modeling Services  Drawing Extraction  Often delegated to fabricator  Then out-sourced -- Low cost labor  Thornton Tomasetti can/should self-perform on select projects Phase III – “Drawing Extraction”  Performing here can speed schedule on some projects  Shop drawings complete at Award  CNC Downloads readily available  Speeds Shop Drawing Review

Phase III – Drawing Extraction Integrated Modeling Services

As Part of Design Projects (Add service or basic fee)  Partial reinforcement detail of congested areas  Deliver detailed reinforcing details as design deliverables  Required on several current international projects Stand Alone Service to Contractors  Design and detail precast Precast and Concrete Modeling

Integrated Modeling Services Precast and Concrete Modeling  Model different structural elements  Enhances clash detection  Better trade coordination  Full profile element models  See clearances and connections  Single model: Steel, concrete, wood  Coordinating for much more intuitive design  Becomes basis for RFID control

 The use of Tekla-driven Building Information Modeling (BIM) allows for enhanced design and visualization of complex structural conditions  Model (or components of) can be delivered to reinforcement subs that embrace technology Integrated Modeling Services Precast and Concrete Modeling

Integrated Modeling Services Precast and Concrete Modeling

The Production Model The BIM Model

The Production Model  One model design process  One model to carry through the detailing  One location for all of the information  One model to maintain and coordinate

One Model Design Process  One model is used to house the geometry as a master model  Pieces of this model are used for analysis  Analysis results are incorporated into the master model  Trades are coordinated with exports of the master model

One Location for the Information  All of the history and the data about a member is in the model  Size, location, end loads, camber, RFI and anything about a specific member is located in the model  The data is maintained and expanded throughout the process

One Model to Maintain and Coordinate  No more making sure the models match  This reduces hours of review and copy check time  Exports from one model to other trades ensures that all trades get up to date information

Case Study: Washington Nationals Park  Design/Build (IPD Approach)  Change in Ownership  3 Months – Start to Mill Order  Architect Early Sign-off  26 Months – Concept to Handover  Result: Team Wins!  Nationals still lose…

Case Study: Washington Nationals Park

Case Study: Yankee Stadium  Design-Bid-Build, Design- Assist  Structure is Iconic  Navisworks – Works!  Client – New “Standard”  Result: Team Wins!  27 th World Series Winners

Case Study: Yankee Stadium  Yankee Stadium – Iconic Frieze

Case Study: Yankee Stadium  Yankee Stadium – BIM Coordination Courtesy : Turner

Case Study: New Meadowlands Stadium  Design/Build, Design-Assist  27,000 Tons of Steel  27 Months – Schematic to Topping Out  Months Ahead of Schedule  Result: Team Wins!

Case Study: New Meadowlands Stadium

Case Study: Kauffman Stadium Scoreboard  Design-Bid-Build  3 Month Schedule Bust  Delivery – Shop Drawings  Result: Team Wins!

Case Study: Kauffman Stadium Scoreboard

 Design-Bid-Build  Only 60 Tons of Steel  Complex Geometry  Result: Team Wins! Case Study: Cathedral of Hope

 Design-Bid-Build  Concrete Detailing  Building Façade Modeling  Result: Team Wins! Case Study: Morgan State University

 Design/Build Case Study: Quantico Aircraft Hangar

Case Study: Quantico Aircraft Hangar

Thank you! Darren R. Hartman, P.E., LEED AP Thornton Tomasetti, Inc. 912 Broadway Blvd., Suite 100 Kansas City, MO T F