Essentials for Enhancing Coal Production K.B. Trehan – Director, Mining & Metals, IISD / INR.

Slides:



Advertisements
Similar presentations
1 Why the World Bank Successful Privatisations are Useful for the Audit of Privatisation? The World Bank rich experience worldwide through providing technical.
Advertisements

NSC RECOMMENDATION ON CONTRACT MINING AND ITS IMPLEMENTATION BY S C JHAGRAWAT Manager (MINES) GMDC Rajpardi.
New ways of thinking about management and organization are a key for Croatian participation in the European Union and in an integrated European Power.
A framework for organising and financing infrastructure provision Jan-Eric Nilsson, VTI.
How to commence the IT Modernization Process?
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Course: e-Governance Project Lifecycle Day 1
The global body for professional accountants Welcome.
Business Critical Rules March 2015
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
MBA (Trimester) Term V Module Title : Project Finance and Management
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Zero Defect – Zero Effect (ZED)
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
“Lessons Learnt” workshop on 18 th June, Sofia Project Implementation Support Service Agreement (PISSA) TA BG BSF S6 - Capacity building István.
Scaling Up Energy Efficiency in India
Euseden INTERNAL AUDIT & ASSURANCE SERVICES.
Strengthening Public Finance Management Through Computerization of Procurement Management System High Level Forum on Procurement Reforms in Africa Tunisia.
KRW 116 trillion invested in 2008 (14% of GDP), 1.82 million jobs created (8% of total employment) Overseas construction has been the key source of.
Guiding principles for the Federal acquisition system
Small enterprise as a seedbed of entrepreneurship
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Small Farm Profitability: Is Wind Energy the Answer? 1
Less is More: SEE Action and the Power of Efficiency Hon. Phyllis Reha Commissioner, Minnesota PUC Co-Chair, SEE Action Customer Information and Behavior.
Dr. Osama Al-Habahbah Automation Chapter 1 Introduction.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
OCCUPATIONAL SAFETY AND HEALTH IN GHANA Ghana has a mixed economy dominated by agriculture, commerce, service and industry.
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
Year 12 Business Studies Operations REVIEW.
Assessment of World Bank and IFC Policies on Transparency for Extractive Industries George Holliday Europe and Central Asia Program Bank Information Center.
Turning the change of Globalisation into an Opportunity Understand reality then make reality better.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Republic of India is a Neighbour of China Most Populous Countries. It is No.2. China is No. 1. It has unique history of Political stability and a Socialistic.
RPG Vision Going for Growth
Batyr Ballyev, Head, Environment Protection Department, the Ministry of Nature Protection of Turkmenistan Climate Change-Related Priorities & Needs.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
DIVISION OF REVENUE BILL VOTE 16: HIGHER EDUCATION AND TRAINING Presentation to Standing Committee on Appropriations 26 February 2010.
REFORMS IN THE ROAD SECTOR IN KENYA Restructuring of Road Sub-Sector: Responding to Future Challenges Eng. Joseph N Nkadayo, MBS Director General, Kenya.
CANTO 24th Annual Seminar Enhancing competitiveness in the Caribbean through the harmonization of ICT policies, legislation and regulation Bahamas, July.
Identification of national S&T priority areas with respect to the promotion of innovation and economic growth: the case of Russia Alexander Sokolov State.
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
TM/WS 9-12 February GROUP 3: Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru,
1 Structural Reform: An Important Aspect of Regional Economic Integration Kyung-Tae Lee.
African Regional Director
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Contractor Alternate Design Serving the Public’s Best Interest.
Other Performance Measurement Systems Benchmarking.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
Utilization of knowledge for economic growth in the Czech Republic Karel Klusacek Technology Centre AS CR Knowledge Economy Forum V.
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
The National Skills Academy for Rail (NSAR) Neil Robertson - CEO.
© 2010 South-Western, Cengage Learning, Inc. All rights reserved.
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
Exploring Supplier Development
CHAPTER 5 TECHNICAL ANALYSIS.
The University of Jordan Mechatronics Engineering Department
Development Consultancy Services for Technology and Sustainable Livelihoods Offices in Bangladesh / Kenya / Nepal / Peru / Sri Lanka / Sudan / UK / Zimbabwe.
AGM
INTRODUCTION TO ISO 9001:2015 FOR IMPLEMENTATION Varinder Kumar CISA, ISO27001 LA, ISO 9001 LA, ITIL, CEH, MEPGP IT, Certificate course in PII & Privacy.
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Equipment Monitoring Market
Across the entire value chain
Engineering Economic Decisions
He World Bank was created at the 1944 Bretton Woods Conference along with the International Monetary Fund (IMF). The president of the World Bank is, traditionally,
progress of the water reform in bulgaria
SOUTH AFRICAN INSURANCE ASSOCIATION
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Essentials for Enhancing Coal Production K.B. Trehan – Director, Mining & Metals, IISD / INR

Agenda 1.Expand the reserve and resource base 2.Focus on enhancing productivity 3.Speed up clearances 4.Equipment approvals 5.Essentials for high capacity mining 6.International best practices in contract management 7.Avoid regulatory overkill 8.Summary 2

1. Expand the reserve and resource base ▪India is amongst the lowest spenders on mineral exploration in the major economies of the world. ▪The total exploration (regional, promotional and detailed) drilling per annum in coal and lignite is around 2.5 lakh meters per annum with a spend of about Rs. 250 Cr. as against US$ 600 million in Australia ▪The total quantum of drilling is to be increased to 20 lakh meters per annum with an outlay of around Rs.1500 Cr. - To be outsourced in a big way and relevant approvals to be expedited. 3

2. Focus on enhancing productivity ▪Indian Coal mines have a long way to go in terms of productivity. ▪The largest underground coal mine produces around 1MTPA whereas in USA, Russia, China, Australia and South Africa, it is 10 MTPA. Lack of investment in technology is the principal reason. Type of MineCIL OMS (Metric Tons) USA (Metric Tons) Opencast Underground Overall ActivityIndiaUS, Australia, South Africa, Poland Shaft sinking: 400 mts36 months12 to 18 months Incline Drivage: 1000 mts 18 to 24 months 12 to 15 months Roadway Development 3 to 8 mts per day 3 mts per operating hour Contd. 4

2. Focus on enhancing productivity ▪OC is a success story in India. Thanks to the vision of the mining industry leadership –  Some of the Outsourced Opencast OBR contractors have Australian level of equipment availability, utilization and productivity.  In UG Mines, Joy and Bucyrus operated CMs have set some productivity records. ▪To replicate these success stories… Contd. 5

2. Focus on enhancing productivity ▪Invest in “TECHNOLOGY, PEOPLE & SYSTEMS” – Three pillars of productivity. ▪Invest in “Training” – Shortage of skilled manpower or political difficulty of hiring right manpower. ▪Investing in high cost of equipment is worth only if they are going to be productive. ▪Training people in advanced equipment and methods of working is a must. ▪Focus on “Mining as a System” instead of each piece to be understood at all levels. ▪Coal companies should look at “lifecycle cost of equipment and cost per ton” instead of the cost of initial acquisition. ▪Provide “funding for equipment” (like some CIL collieries), as banks do not have expertise in lending to underground equipment. 6

3. Speed up clearances ▪The present clearances: mine lease, mine plan, environmental approval, forest clearance take between 5 to 8 years; target it to reduce it to 2 years. ▪EMP should take a maximum of 210 days but it takes 540 to 720 days. ▪FC to be targeted in 150 days instead of 3 to 5 years. ▪Banks have instructions not to lend to projects without completing land acquisition, R&R (100%), forest clearance and environmental clearance - So?? Contd. 7

3. Speed up clearances The way forward ▪Can we look at legally binding time limits? ▪Put up for bidding only those projects with complete clearances:  Land is acquired fully, R&R is completed, EC and FC are in place;  The bids will then be reasonable or else speculator bidders would win and projects will not take off. Technical opinion5 months Opinion on forest land5 months Revenue opinion5 months Recommendation by State4 months Approval by the Ministry3 months 8

4. Streamline approvals by DGMS ▪DGMS and Coal Mining Companies in India are credited with good safety record and they are to be complimented. ▪Concept and Awareness of “Zero Dangerous Occurrence“ to be introduced and reviewed for complete safety. ▪The procedures are based on Coal Mines Regulations of 1957 and Indian Electricity Rules of ▪There is a shortage of testing laboratories in India. For roof supports, there are no labs, leading to testing outside India thus, resulting in delays. Contd. 9

4. Streamline approvals by DGMS The way forward ▪Once approved and tested in an internationally recognized laboratory duly following internationally accepted testing processes, no further testing in India may be insisted. ▪Systematic Support Rules, which specify the support pattern in underground mines, need to be revised continuously due to advances in technology, equipment and understanding of the roof strata. ▪In the absence of above changes, the equipment market would be cornered only by a few established players, thus, stifling innovation and customer choice leading to higher prices and slower pace of technology absorption. 10

5. High Capacity Mining – Opencast & Underground ▪Identify high capacity – 20 to 50 MTPA opencast mines:  Deploy high capacity HEMM suiting mine specific conditions;  Maintenance and repair contracts  Outsource development work and other services  Spares from OEM with performance guarantee, strategic warehouse locations – Minimize inventory carrying costs. ▪In Underground Mines - 5 MTPA longwalls and 1 MTPA per CM board and pillar projects have to be identified.  Focus on faster mine development using Roadheaders, Bolter miners and achieve a progress rate of 3 meters per operating hour.  Outsource development work.  Invest in Longwall mines –ploughs for thin seams and top coal caving for thick seams, for improving production, productivity and safety.  Adopt global best practices in mining technology and management. Contd. 11

5. High Capacity Mining – Opencast & Underground ▪Unless a critical market is created, no reputable OEM would invest in India to produce the equipment – all major OEMs have factories in China. ▪In India too, all the Auto majors have manufacturing facilities – simple reason being scale of the market.  Application of Auger / Highwall mining technology  Phase out manual mining  Track daily productivity and costs Contd. 12

5. High Capacity Mining – Opencast & Underground ▪Cost Management  Daily reporting of productivity and costs  Electronic shift planning capability through shift data collection  Provide data validation and upload at the end of each shift  Web portal reporting Contd. 13

5. High Capacity Mining – Opencast & Underground ▪Improving Efficiencies  Plan for the long term  Mine planning  Production scheduling  Safety  Wash Plants yields  Equipment selection  Appropriate infrastructure  PLANNING, PLANNING & MORE PLANNING -- Always consider the WHOLE production chain Contd. 14

5. High Capacity Mining – Opencast & Underground ▪Integrate Systems & Technology  Technology is often ignored, not understood, under utilized, poorly implemented and managed  New technologies MEAN CHANGE & MUST BE MANAGED 15

6. International best practices in Contract Management Issues ▪Risk sharing between the employer and the contractor is not equitable: LA, R&R, EC, FC need to be with the owner. ▪Long term contracts do not have price variation clauses; and in contracts with price variation clause, the formula weightages do not reflect the cost components effectively. ▪In composite EPC and Operations contracts, the liabilities of EPC phase do not end till the operation phase is concluded – No major OEM is willing to accept this. ▪The acceptance criterion for performance tests are not clearly defined. ▪Engineer’s role under the contract is that of a “referee” and not just “owner’s representative” – this aspect is completely ignored. Contd. 16

6. International best practices in Contract Management ▪Prepare model contract documents as done by NHAI. ▪Model documents are prepared by Secretariat for infrastructure in the Planning Commission and approved by the Cabinet Committee on Infrastructure headed by the Prime Minister for Airports, Roads, Highways, Power, Telecom and Railways. ▪The same Secretariat could prepare and approve the model documents for the coal / mineral sector also. 17

7. Avoid regulatory overkill ▪Legislators across the world are competing with each other leading to regulatory overkill  Australia: Resource super profit tax, Strict Carbon Control laws  USA : Closing down of coal based power plants which do not meet the strict carbon emission norms  Indonesia: Royalty based on index price fixed by the Government  India: 26% profit sharing for coal and lignite companies ▪Investors do not worry about regulations but they are looking for fair, consistent and predictable application of regulations. ▪Having an independent regulator who has the authority to regulate coal prices is imperative. 18

8. Transforming the Indian coal sector Summary 1.Expand the resource base by increasing the spend on EXPLORATION. 2.Invest in “PEOPLE, Technology & Systems.” 3.Focus on PRODUCTIVITY enhancement through TECHNOLOGY & TRAINING. 4.Speed up forest and environment CLEARANCES. 5.Streamline equipment approvals by DGMS. 6.Identify high impact OC and UG projects and bring them to production in a well defined TIME frame with TRAINED skilled manpower, tracking operations SHIFTWISE, Cost Management & integration of Systems & Technology. 7.Use international BEST practices in contract management. 8.Avoid regulatory overkill. 9.Lets be “VALUE CONSCIOUS” and not “Cost Conscious.” 19