SAFER Seismic EArly Warning For EuRope Seismic Early Warning

Slides:



Advertisements
Similar presentations
ENSEMBLES-Hamburg Meeting, Martin Beniston, University of Fribourg, Switzerland ENSEMBLES RT8 Dissemination, education and training Martin Beniston.
Advertisements

14-1 Chapter 14 Risk and Managerial (Real) Options in Capital Budgeting © Pearson Education Limited 2004 Fundamentals of Financial Management, 12/e Created.
Review of Science and Technical Progress from Tsunami Risk Perspective Preparatory Workshop on Science and Technology for the Global Platform for Disaster.
A. M. Kaynia F. Nadim Earthquake-induced landslides Workshop UN-ISDR Pavia, 5-6 April 2011.
SAFER WP6: Dissemination of Results and End-Users Interface Lead Partner NOA, Athens Contributing partners: GFZ, AMRA, Cedim AG and all partners.
Rapid magnitude determination for Vrancea early warning system and the April 25, 2009 Ms= 5.3 event (A. Marmureanu, C. Ionescu, Gh. Marmureanu)
D. Di Giacomo, S. Parolai, H. Grosser, P. Bormann, R. Wang, and J. Zschau Rapid determination of the energy magnitude Me SAFER Final Meeting Potsdam, 3.
SAFER Project final meeting, Potsdam, 3-5 June, 2009 Nicholas Voulgaris Contribution of the Seismological Laboratory National & Kapodistrian University.
INGV ShakeMaps for the lAquila earthquake Alberto Michelini, Licia Faenza & Valentino Lauciani INGV, Centro Nazionale Terremoti.
Fast determination of earthquake source parameters from strong motion records: Mw, focal mechanism, slip distribution B. Delouis, J. Charlety, and M. Vallée.
SAFER Project - FINAL MEETING Elin Skurtveit & Amir M. Kaynia - NGI
Earthquake engineering and real-time early warning: the AMRA perspective. Iunio Iervolino* and Gaetano Manfredi *Assistant Professor of Structural Engineering.
International Flood Network - IFNet - Akira Sasaki Deputy Director General Water in Rivers / IFNet Secretariat.
1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
The CENALT. Key dates of the French tsunami warning centre project November 2005 : first international meeting on tsunami alert systems in the Mediterranean.
Metropolitan Transportation Authority July 2008 Financial Plan MTA 2009 Preliminary Budget July Financial Plan 2009 – 2012 DJC.
European Investment Bank
The Intelligent Energy – Europe Programme at a glance
1 Bishkek November 17, Goulsara Pulatova RegionalCoordinator UNISDR Secretariat Office in Central Asia 2nd Regional Consultative.
GEO South – Eastern Europe and Eastern Mediterranean Symposium on Earth Observation Services for Monitoring the Environment and Protecting the General.
1 SoCo project Sustainable Agriculture and Soil Conservation.
WMO’s Activities in Disaster Risk Reduction
Dmitry A. Storchak & Domenico Di Giacomo Prof. Ambraseys contribution to the ISC Event Bibliography March 19, 2014Ambraseys.
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013
2nd year SAFER Project meeting. Armada Hotel, Istanbul, Turkey June, Information-dependent lead time maps for earthquake early warning in the.
Real-Time Estimation of Earthquake Location and Magnitude for Seismic Early Warning in Campania Region, southern Italy A. Zollo and RISSC-Lab Research.
1 Water Research Institute - National Research Council (IRSA-CNR) 2 Ev-K2-CNR Committee The Proposed CEOP-HE Implementation Strategy Gianni Tartari 1,2,*
The JRC Tsunami Model A. Annunziato Joint Research Centre of the European Commission Institute for the Protection and Security of the Citizen Support.
2 nd WORKSHOP OF THE NATO SfP PROJECT “Improvements in the Harmonized Seismic Hazard Maps for the Western Balkan Countries” April 25-26, 2013 Belgrade,
QUIZ 10/28 1.What does the Richter scale measure? 2.What does the Modified Mercalli Scale measure? 3.What scale is used to describe the amount of damage.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
SAFER Seismic EArly Warning For EuRope Introduction to the 1st year`s meeting and project management (WP1) progress report Athens, 27 June Jochen Zschau,
1 McGill University Department of Civil Engineering and Applied Mechanics Montreal, Quebec, Canada.
SEISMIC HAZARD Presentation is based on: Allen, R., Earthquake hazard mitigation: New direction and opportunities, in "Treatise on Geophysics”, Bilham,
PROGRAMME VI. MATERIAL-TECHNICAL EQUIPPING AND INSTITUTIONAL DEVELOPMENT OF STATE SERVICES PRESENTED BY THE INSTITUTE SEISMOLOGY OF ACADEMY SCIENCES OF.
WHAT COULD BE THE NEXT EARTHQUAKE DISASTER FOR JAPAN  A difficult question, but ---  It is the one that was being asked long before the March 11, 2011.
Faults in Focus: Earthquake Science Accomplishments Thomas H. Jordan Director, Southern California Earthquake Cente r 28 February 2014.
Earthquake Early Warning Research and Development in California, USA Hauksson E., Boese M., Heaton T., Seismological Laboratory, California Institute of.
WORKPACKAGE-2 “REAL-TIME ESTIMATION OF EARTHQUAKE SOURCE PARAMETERS” SAFER PROJECT Coordinator: Aldo Zollo, Università di Napoli Federico II - AMRA scarl.
NORSAR Kjeller, Norway Type of organisation: Research Institute Specialising in: Real-time transmission and automatic processing of seismic data from a.
U.S. Department of the Interior U.S. Geological Survey Earthquake Sources Based on a lecture by James Mori of the Earthquake Hazards Division, Disaster.
2009 AGU Fall Meeting S33D. Research and Development in Nuclear Explosion Monitoring II Implementation of tsunami early warning using earthquake rupture.
RAPID SOURCE PARAMETER DETERMINATION AND EARTHQUAKE SOURCE PROCESS IN INDONESIA REGION Iman Suardi Seismology Course Indonesia Final Presentation of Master.
Seismic Hazard Assessment for the Kingdom of Saudi Arabia
Iranian National Broadband Seismic Network (BIN)
Real World Applications of USGS EQ Science: Stacy Bartoletti Degenkolb Engineers Structural Engineers Association of Washington Cascadia Region Earthquake.
Tsunami-prone Areas Japan, 2011 Sumatra, 2004 Mentawai, 2010
SUSTAINABLE DEVELOPMENT, GLOBAL CHANGE AND ECOSYSTEMS FP6 Research on NATURAL DISASTERS in the context of Global ChangeObjective: Promote European research.
Leveraging research and future funding opportunities Hajo Eicken Geophysical Institute & International Arctic Research Center University of Alaska Fairbanks.
U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior U.S. Geological Survey Natural Hazards Science – Reducing the World’s.
Disaster Mitigation and Management Organization
SEISMIC HAZARD. Seismic risk versus seismic hazard Seismic Hazard is the probability of occurrence of a specified level of ground shaking in a specified.
OPENQUAKE Mission and Vision It is GEM’s mission to engage a global community in the design, development and deployment of state-of-the-art models and.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
Large Earthquake Rapid Finite Rupture Model Products Thorne Lay (UCSC) USGS/IRIS/NSF International Workshop on the Utilization of Seismographic Networks.
Summary of seismology component of the course Sources Waves Location Magnitude/Intensity Focal mechanisms Other topics.
GEOFON and its Role in Global Seismic Monitoring and Tsunami Warning Winfried Hanka, GeoForschungsZentrum (GFZ), Potsdam, Germany,
ECHO, European Commission, Brussels 20 Jan 2016 KnowRISK project Kick off meeting for the selected projects under the 2015 Call for proposals for prevention.
Mountain Risks: A Marie Curie Research & Training Network J. Corominas and the ‘Mountain-Risks’ research team Department of Geotechnical Engineering.
Understanding Earth Sixth Edition Chapter 13: EARTHQUAKES © 2011 by W. H. Freeman and Company Grotzinger Jordan.
IShake System: Earthquake Detection with Smartphones Presenter: Jize Zhang Da Huo Original Paper:Reilly, Jack, et al. "Mobile phones as seismologic sensors:
Gaetano Festa, Aldo Zollo, Simona Colombelli, Matteo Picozzi, Alessandro Caruso Dipartimento di Fisica; Università di Napoli Federico II.
A brief introduction to NERA – NA3 work package ‘Networking accelerometric networks and strong- motion data users’ Sinan Akkar On behalf of entire NERA-NA3.
Responsibilities of researchers Asking ourselves what responsibilities do we have towards the scientific community and society? Research is regulated by.
VII. Earthquake Mitigation
Engineering Geology and Seismology
Earthquake and Tsunami Program Governor’s Office of Emergency Services
AMRA’s contribution to WP4
Presentation transcript:

SAFER Seismic EArly Warning For EuRope Seismic Early Warning Naples Bucharest Athens Istanbul Cairo Iceland Switzerland Greece The starting point The SAFER plan Achievements Future tasks What next? The agenda

Seconds before the earthquake hits! Early Warning Aussprache: shear shear = thank you Seconds before the earthquake hits!

The Disaster Reduction Chain Early warning is an important component! Process Understanding Scientists Hazard Assessment Scientists Risk Assessment Scientists, Engineers Safe Building Engineers Early Warning Decision Makers, Local Author. Various Groups Knowledge Transfer Rapid Earthquake Information Scientists, Engineers Rapid Impact Assessment Scientists, Engineers

SAFER Where did we start? Seismic Early Warning In seismic early warning Europe was far behind the US, Japan, Taiwan and Mexico! Bucharest Istanbul Only Istanbul and Bucharest had started to develop EW-capabilities for their cities! In particular, the shake map technology had not been implemented in Europe!

What Did We Have in Mind? Develop seismic early warning methods and capabilities for Europe Implement and test new methods in European test areas and -cities Naples Bucharest Athens Istanbul Cairo Iceland Switzerland Greece

Regional Early Warning Seismic EW - Probabilistic and Evolutionary Approach to Real-Time Distance, Magnitude and PGA (AMRA/SAFER) a. d. b. However: The problem of large magnitudes (from the first seconds)! Achievements: A New Concept for Regional Early Warning c. e. a., b., c.: Real-Time distributions of source-to-site distance, magnitude, and PGA (at site); d. Lead-time map (when 4 stations have triggered) and real-time risk reduction actions; e. Decisional rule based on PGA- and false alarm probabilities.

CNRS/SAFER- Achievements: Rapid Source Parameters Within Minutes Earthquake origin time Earthquake detection and localisation "Early P-wave magnitude" A few seconds Early warning Earthquake detection and localisation „Early P-wave magnitude“ Moment magnitude Mw 2 minutes Rapid source parameters Step 1 Focal mechanism 15 minutes Step 2 40 minutes Slip distribution Step 3 Global CMT solutions: > 1 hour TIME

More details can be found in Di Giacomo et al. (GRL 2008). Achievements (GFZ): Rapid determination of the energy magnitude Me The case of the great Sumatra earthquake The red star represent the 26 December, 2004 Sumatra earthquake location, the black triangles the broadband stations used to compute Me(GFZ), and the blue circles represent the S-wave arrival times. On the right the number of stations NS used to compute Me(GFZ) at different times after OT is also shown. Me determination using (S-P) time windows for the 26 December, 2004 Sumatra earthquake. Already about 15 min after OT our procedure could have provided a stable Me determination. More details can be found in Di Giacomo et al. (GRL 2008). D. Di Giacomo, H. Grosser, S. Parolai, P. Bormann, and R. Wang

Achievements (GFZ/HU): People Centered Early Warning System Self Organizing Mesh Networks for Early Warning and Rapid Response “Decentralized” versus “centralized” systems “People centered“ versus „one voice“ A new technology for seismic early warning! Basic Features self-organizing! decentralized! low-cost! dense! Client station

Achievements (WAPMERR/NORSAR): More rapid and more precise Actual (Magnitude 6.3) after D. Wald, USGS 6/4/09 7/4/09 8/4/09 9/4/09 10/4/09 11/4/09 BBC dpa 300 250 200 150 100 50 Rapid Damage and Loss Assessment Time-Line of Information Availability on Death Toll Due to the L`Aquila M=6.2 event on April 6th 2009 More rapid and more precise impact assessment is needed! First 12 hours: Death Toll < 50!

Achievements (test sites): Ground Shaking Intensity Rapid Impact Assessment Achievements (test sites): Ground Shaking Intensity Can be Overlayed on Infrastructure! The shake-map-technology has now been implemented through SAFER in many places in Europe! and real-time damage assessment is feasible, but needs more testing (GEM?) Ground Shaking Intensity Shake-Maps within a few minutes! (The Northridge Scenario)

Near Real-Time Aftershock Forecasting Combining Non-Stationary Statistics with Physics of Earthquakes Achievements (GFZ/ETH): New Application of Time-Dependent Hazard Assessment: Near Real-Time Aftershock Forecasting 12

Achievements (NGI): Early Warning for Earthquake Induced Landslides 13

Major Contributions to International Meetings Achievements: Visibility Dissemination Public Relation Major Contributions to International Meetings American Geophysical Union (AGU), Dec 2007 European Geosciences Union (EGU), April 2008 European Seismological Comm. (ESC), Sept 2008 European Geosciences Union (EGU), April 2009 2nd International Workshop on Earthquake Early Warning, Kyoto, Japan, April 2009

Achievements: Publications International Journals: More than 30 Presentations: More than 100 Book on Early Warning (Springer) Second Book (Springer) in Preparation Special Volume in Geophys. Research Letters Special Issue of Soil Dynamics and Earthquake Engineering (SDEE, in Preparation))

Further Achievements Contracting many young scientists Forming a European Science Community in the field of Seismic Early Warning Contributing to the networking between large European projects like NERIES, TRANSFER,…..

SAFER Final Deadlines and Proposed Schedule FINAL DEADLINES SAFER FINAL MEETING JUNE 3th-5th END OF THE PROJECT JUNE 14th DEADLINE FOR SUBMITING THE FINAL ACTIVITY REPORT AND FINANCIAL REPORT (INCLUDING AUDIT CERTIFICATES) JULY 30th PROPOSED SCHEDULE REPORTS FROM WP LEADERS AND TEST SITE LEADERS JUNE 15th FINANCIAL REPORTS AND AUDIT CERTIFICATES JULY 15th SUBMISSION OF THE FINAL REPORT

SAFER Deliverables Report Agenda Vision Partner D Total Delivered Missing Percentage GFZ 18 10 8 55,56% AMRA 13 3 76,92% UNIKARL* 7 100,00% KOERI 4 1 25,00% UBER 6 50,00% INGV 5 83,33% NOA 57,14% NKUA 9 44,44% CNRS** 0,00% EMSC 2 ETHZ NIEP NORSAR 85,71% NGI IMOR 40,00% WAPMER SELEX 66,67% NRIAG KNMI   CEDIM Berkeley TOTAL 116 75 41 64,66% SAFER Deliverables Report Agenda Vision * del 2.17 and del.4.18 are identical ** CNRS has delivered its contribution to del.2,5 but the deliverable has not been completed yet