Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
Advertisements

Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Delmar Boulevard bridge replacement over Interstate 170.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Newmarket Viaduct Replacement STAGED VIADUCT CONSTRUCTION / DECONSTRUCTION PROCESS PROJECT DELIVERY BY NGA NEWMARKET.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
Capital Improvement Projects 2014 A Snapshot of Current Construction Activity in the City of Irvine.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
I-65 Added Travel Lanes Project in Tippecanoe County
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Current Construction Projects Major Projects Pinellas County.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Community Outreach Meeting September 10, 2015 Welcome to Santa Clara County I-680 Corridor Study 1.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Metro Highway Program Presentation to CMAA Abdollah Ansari
Delmar Boulevard bridge replacement over Interstate 170.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Orange County Transportation Authority
Four Winds Condominium Association August 2, 2017
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Molly Kline, Project Manager
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
The Oakton Condominium Association September 12, 2017
US26: Cornelius Pass Rd -185th Ave
Malibu Canyon Pole Replacement Project Information
Highway 169 Bridge Replacement & Pavement Resurfacing
Issaquah-Fall City Road
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
PROJ. 566(17) LOR PID MAJOR WIDENING
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Contract 60X10 Informational Meeting Weber I-55
West Hills Road Projects Update
Harbour Island Force Main Replacement
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Metropolitan District | mndot.gov
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr. Blvd. / Charter Way and Hammer Lane I-5 North Stockton Project

Presentation Items  Overview  Project Purpose  Project Components  Construction Sequencing  Anticipated Construction Impacts  Temporary Closures and Detours  Landscaping  Timeline  Public Communications  Questions and Answers I-5 North Stockton Project

Project Purpose  Reduce congestion  Improve mobility  Decrease commute times  Encourage High Occupancy Vehicle (HOV) use  Reduce sound impacts from existing freeway  Reduce maintenance cost and improve the Interstate’s operations I-5 North Stockton Project

Project Components  Widen Freeway to 8 through lanes, from Country Club Blvd to Hammer Lane  Replace all existing freeway pavement with concrete  Add auxiliary lanes  Add soundwalls  Introduce the first HOV lane project in San Joaquin County I-5 North Stockton Project

Representative Existing Condition  Currently three through lanes in each direction  Soundwalls exist south of March Lane  The median is open over local streets and landscaped with shrubs Stage Construction I-5 North Stockton Project

Stage Construction Stage 1  Shift traffic to outside freeway with barriers  Widen the median of the freeway and bridges  Construct retaining walls along the northbound shoulder between March Lane and Hammer Lane  1.5 to 2 year construction period  Stage 1 construction begins in August 2011, complete Spring 2013 I-5 North Stockton Project

Stage 2  Shift northbound traffic to median. Three travel lanes will remain open in each direction  Replace northbound freeway pavement  Construct outside auxiliary lanes and soundwalls  One year period – Complete by Spring 2014 Stage Construction I-5 North Stockton Project

Stage 3  Shift southbound traffic to median. Three travel lanes will remain open in each direction  Replace southbound freeway pavement  Construct outside auxiliary lanes and soundwalls  One year period – complete by Spring 2015 Stage Construction I-5 North Stockton Project

Stage 4  Shift southbound traffic back to southbound lanes  Remove temporary barriers, construct permanent median barrier  Final signing and striping  Six month period – complete in fall 2015 Stage Construction I-5 North Stockton Project

Construction Impacts  Local Roads –Lane restrictions –Temporary closures  Noise –7am to 7pm –Periodic late night work –Increased traffic on detour routes  Delay –Narrower shoulders and lanes –Reduced number of lanes for night work I-5 North Stockton Project

Temporary Road Closures and Lane Restrictions I-5 North Stockton Project

Temporary Detours I-5 North Stockton Project Brookside Road –Closed for up to 6 months –Detour to March Lane via Feather River Drive and McGaw Street River Drive –Closed for up to 6 months –Restripe Plymouth Road to two-way between River Drive and Telegraph Avenue Temporary Closure

Temporary Detours I-5 North Stockton Project Swain Road –Closed for up to 6 months –Detour to Benjamin Holt Drive via Plymouth Road and Grigsby Place Temporary Closure

 Construction Impacts ―Existing trees, shrubs removed ―Needed for retaining walls and stormwater basins ―Temporary erosion control provided during construction  Corridor Planting Proposal ―To follow after freeway construction in 2016 ―Caltrans seeking State Transportation Improvement Program Transportation Enhancement funds for landscaping ―Will coordinate with City and County Landscaping Opportunity I-5 North Stockton Project

Timeline  August 2011 Begin Construction  Fall 2011 – Fall 2012Detours for Bridge Widening Widen Median and Bridges (not all at same time)  2013I-5 Traffic Shift to Northbound  2014I-5 Traffic Shift to Southbound  Fall 2015Construction Complete I-5 North Stockton Project

Public Communications  Electronic newsletters  Project web pages  Hotline Number (209)  Media outreach / traffic reports  Seven-day advanced warning signage of detours and closures  Caltrans is seeking a FHWA “Highway for Life” grant for advanced communications strategies. I-5 North Stockton Project