Introduction Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Objectives of the Workshop.
Advertisements

Regions for Economic Change: Networking for Results LMP Workshop 3C: When exchanging is good for innovation: Experiences from the Lisbon Monitoring Platform.
Expert Groups in Episode 3 Episode 3 - CAATS II Final Dissemination Event Raquel Garcia Isdefe Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
The Performance Framework Episode 3 - CAATS II Final Dissemination Event Laurent Tabernier EUROCONTROL Project Episode 3 Brussels, 13 & 14 Oct 2009.
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 1 Episode 3 EXCOM # 5 15th December 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
Sociedade Portuguesa de Inovação ChinaFrontier: China’s Realities from a Frontier Research Perspective Overall Objectives of the Project and a Summary.
Safety case development in ATM R&D Safety feedback for decision-makers and concept developers Episode 3 - CAATS II Final Dissemination Event Jelmer J.
BFSE - A Better Future for the Social Economy Lepsza przyszłość ekonomii społecznej Warsaw, 16 March 2011 Consolidation, mainstreaming & evaluation Toby.
Episode 3 Prototyping Sessions En-route and TMA Episode 3 - CAATS II Final Dissemination Event Bill Booth EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Gaming and Modelling Pablo Sánchez-Escalonilla AENA Episode 3 Brussels,
Case interrelations Relationships and integration Episode 3 - CAATS II Final Dissemination Event John Harrison Hu-Tech CAATS II Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Fast-Time Simulation and Prototyping Episode 3 - CAATS II Final Dissemination.
Aims Develop a methodology to study the impacts of low consequences/high probability events Apply this methodology to the implications of a 5-6 metre.
The URBACT II Programme General Presentation Vilnius, 20 January 2011.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
BUSINESS CASE Episode 3 - CAATS II Final Dissemination Event Ignacio Zozaya Boeing Research & Technology Europe CAATS II Brussels, 13 & 14 Oct 2009.
Introduction to NCEA Level 1, 2 and 3 Date: Friday 13th March Presenter:Lesley Pearce.
Charo Camacho International Project Manager. Events to be organized in Seville. (30th/09/13 & 1-2/10/13) Conference Knowledge fair CREAMED: Knowledge.
WELCOME BACK!! WEDNESDAY. Response to Feedback Awesome!!! Hmmm… Increased collaboration Michael’s presentation Logic model work Coordinators who understand.
Episode 3 / CAATS II joint dissemination event Michael Standar Chief, Operational Concept and Validation.
Transregional Workshop – Sofia, October 30, 2008 R4R Tools and Methodologies.
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3.
Scene setting for CAATS II Episode 3 - CAATS II Final Dissemination Event Carlos Regidor Isdefe CAATS II Brussels, 13 & 14 Oct 2009.
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme Regions of Knowledge Objectives and Activities.
Overview Day 1 Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Workshop on EU fusion roadmap for FP8, Garching, April C. Cesarsky CCE-FU 1 Preparing the European fusion roadmap for FP8 and beyond.
1 CHORUS + Coordinated approacH to the EurOpean effoRt on aUdio-visual Search engines ” Grant Agreement No CHORUS + 01/01/2010 – 31/12/ Jean-Charles.
INFFER (Investment Framework For Environmental Resources)
Mid term review : unsatisfactory project direct recommendations i – ix revision of deliverables period 1 & 2,within 3 months reduce scope: (a) users, (b)
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
Episode 3 E3-WP0-MWPM PPT-V th ExCom Slides 1 Episode 3 - Ex-Com Final Report Tools & Validation Dr. Ralph Leemüller R&D Division - DFS.
Fitness Check of environmental monitoring and reporting - consultation and evidence gathering Stakeholder Workshop 19/20 Nov 2015 Steve White Joachim D'Eugenio.
Evaluation of NRNs Andreas Resch, Evaluation Advisor.
Joint wrap-up of event Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Episode 3 1 Final Report Performance Aspects Ex-Com #6 - Brussels, December 15th 2009
UK Interest & Input to the Factories of the Future Horizon 2020 Roadmap. © ActionPlant 2011.
+ Today’s Agenda Co-Teaching Institute. + End of Day Product #1 Classroom design plan (Poster Paper) Design your room (or suggestions for your room if.
Introducing STYLE BRUSSELS, 20 TH APRIL, 2016 AMY PEACE, BRITEST, STYLE PROJECT COORDINATOR STYLE INTRODUCTION, 20TH APRIL - BRUSSELS.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
Work Package 2 Targeting innovation chain processes to tackle Societal Challenges Task 2.2 Involvement of society in societal challenges.
ICT WP ICT Alberto Rabbachin Media and Content Convergence Alberto Rabbachin Unit G.1 –Converging Media & Content
Activity Report and Future Planning. European thematic work 2006 Main priorities: 1.Gather and analyze "good practice" and general information on operations.
Introduction to The BECOTEPS project Workshop on the opportunities for new business concepts with the combined non-food biomass chains 7 th October 2009.
FINAL EVENT Dublin, 01 June 2016 Welcome Françoise de Viron President of eucen.
NERIS European Platform on Emergency and Recovery Preparedness and Response Abu Dhabi, 20 October,
Trilateral Research EUROPEAN COMMISSION
DO NOT PRINT IN WORKBOOK
Civil Protection Financial Instrument – Prevention Projects
Lesson 6 Wrap-Up.
Lesson 6 Wrap-Up.
Introduction to the ESPON TIA Quick Check
DO NOT PRINT IN WORKBOOK
RECARE set-up Rudi Hessel on behalf of coordination team
AMICI WP1 – Management, coordination and dissemination
Welcome and Logistics European Commission CEOS 2018 Chair team
Marine Strategy Framework Directive (MSFD)
DG Troika – 26 October – Portugal
Anti-Money Laundering and Counter Financing of Terrorism
Introduction and Objectives Addis Ababa, Ethiopia, December 2012
TECHNOLOGY ASSESSMENT
Workshop on Health Statistics Context, Objectives & Organisation
Economic Development Forum, Florence March
Presentation transcript:

Introduction Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009

Episode 3 - CAATS II Final Dissemination Event 2 ATM Concept Validation Concept Validation is about  identifying, collecting and structuring…  the necessary evidence to support…  stakeholders in their investment decisions. The European Operational Concept Validation Methodology is a framework for R&D to establish a common approach to all projects contributing to the validation of operational concepts. Currently Version 2.

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 3 CAATS II Coordination action focussed on the management, consolidation and dissemination of the knowledge gained in European ATM-projects. The main objectives are:  Development (and introduction in the E-OCVM) of the case based approach for: - Safety - Human Factors - Environment - Business  Interaction with and support to projects;  Collaboration and cooperation with SJU.

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 4 Episode 3 A 6 th FP project of 21 partners, mostly SESAR partners, to start SESAR validation. Developing methods for gathering results and knowledge gained during validation in the following areas:  Performance  Concept detailing  Safety Applying innovative validation techniques:  Gaming  Prototyping sessions  Expert groups  Macro-modelling, Process-modelling

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 5 Why am I here? MethodologyApplication

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 6 Agenda – Day 1, morning 09:00-09:30Registration 09:30-o9:35 Introduction Welcome5 minM. Koolloos 09:35-09:50Keynote Speech European Commission15 minL. Tytgat 09:50-10:05Keynote Speech SJU15 minM. Standar 10:05-10:15 Workshop Agenda / Intro Episode3 and CAATS II 10 minM. Koolloos 10:15-10:30E-OCVM (V2) explained15 minA. Jackson 10:30-11:00COFFEE 11:00-11:15 CAATS II Scene setting for CAATS II15 minC. Regidor 11:15-12:00Safety Case45 minJ. Scholte 12:00-12:45Human Factors Case45 minA. Pasquini 12:45-14:00LUNCH

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 7 Agenda – Day 1, Afternoon 12:45-14:00LUNCH 14:00-14:45 CAATS II Environment Case45 minH. Foster 14:45-15:30Business Case45 minI. Zozaya 15:30-15:50Interrelation between cases20 minJ. Harrison 15:50-16:00Conclusions10 minC. Regidor 16:00-16:30COFFEE 16:30-16:50 Episode 3 Scene setting for Episode 320 minP. Leplae 16:50-17:25 Episode 3 Validation Strategy / Industrial view 35 min A. Jackson / P. Lelièvre 17:25-17:30Wrap-upOverview of day, what next5 minM. Koolloos

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 8 Agenda – Day 2, Morning 08:30-09:00 Demonstration of Episode 3 tools 09:00-09:15Introduction Recap Validation Strategy / What to expect today 15 min M. Koolloos / A. Jackson 09:15-09:35 Episode 3 Expert Groups20 minR. Garcia 09:35-09:55Gaming Exercises20 minP. Lopez 09:55-10:15Prototyping Sessions20 minB. Booth 10:15-10:30Questions & Answers15 min M. Koolloos / A. Jackson 10:30- 11:00COFFEE 11:00- 11:20 Episode 3 Combining techniques: Modelling & Gaming 20 minP. Sanchez 11:20-11:40 Combining techniques: Expert Groups & FTS & Prototyping 20 minH. de Jonge 11:40-11:55Questions & Answers15 min M. Koolloos / A. Jackson 11:55-12:15Industrial assessment: methods and results20 minP. Lelièvre 12:15-13:30LUNCH & Demonstration of Episode 3 tools between 13:15 and 13:30

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 9 Agenda – Day 2, Afternoon 12:15-13:30LUNCH & Demonstration of Episode 3 tools between 13:15 and 13:30 13:30-13:50 Episode 3 Performance Framework20 minL. Tabernier 13:50-14:20 Operational Concept Detailing / Example of OPS scenario 30 min R. Eveleigh / E. Haugg 14:20-14:40Overall Lessons Learnt from the project20 minP. Leplae 14:40-14:50Wrap-upSummary of the Event10 minM. Koolloos 14:50-15:10COFFEE 15:10-15:25 Conclusions & Discussion E-OCVM V3: What’s new?15 minM. Poppe 15:25-15:35SJU (impact of results)10 minB. Graham 15:35-15:55Panel discussion20 min P. Leplae / C. Regidor 15:55-16:00Farewell5 minM. Koolloos 16:00-16:30END OF EVENT & Demonstration of Episode 3 tools

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 10 Furthermore… Demos and Posters in room “Courtesy”. Today and tomorrow; Help us to help you better by completing the questionnaire; Input for panel discussion. Give us your interesting, provoking, challenging, to-date unanswered questions; Cocktail today at 18:00!