Presentation is loading. Please wait.

Presentation is loading. Please wait.

RECARE set-up Rudi Hessel on behalf of coordination team

Similar presentations


Presentation on theme: "RECARE set-up Rudi Hessel on behalf of coordination team"— Presentation transcript:

1 RECARE set-up Rudi Hessel on behalf of coordination team
Jan 12th, 2014

2 RECARE set-up RECARE framework Links between WPs Flow of information
Introduction to planning

3 RECARE project objectives
Identify and fill knowledge gaps in our understanding of the complex functioning of soil systems under the influence of climate and human activities Develop a harmonized methodology to assess state of degradation and conservation for different soil threats Develop a universally applicable methodology to assess the impacts of soil degradation and measures on soil functions and ecosystem services, including costs and benefits Design, select, and implement in close collaboration with stakeholders, innovative measures, and evaluate the efficacy of these regarding soil functions and ecosystem services as well as costs and benefits

4 RECARE project objectives
Upscale results from the study site to the European scale using innovative simulation approaches to evaluate the applicability and effectiveness of measures across Europe Evaluate constraints for, and ways to, facilitate adoption of these measures by stakeholders Carry out an integrated assessment of existing soil related EU and national policies and strategies to identify their impacts, synergies and potential inconsistencies, and to derive recommendations for improvement based on RECARE results Disseminate project results to all relevant stakeholders, from land users to high level policy makers

5 RECARE conceptual framework
= drivers/pressures; S = state; I = impact; R = response; = RECARE main aims)

6 Flow of information 3 main sources of information Internal work WP
WP depending on other WPs WP depending on Case Studies Of course, all 3 sources make use of previous work

7

8 RECARE methodological framework

9 Information DOW on links between WPs
PERT chart (but at task level  too complex for practical use) Gant chart for timetable Methodological framework for case studies RECARE conceptual framework with aims (but do not relate 1:1 to WPs) General WP descriptions Contains for each WP information on links with other WPs Task descriptions regularly give details on such links

10 Flow of information –example DOW
‘WP4 assists other WPs, especially WPs 3, 5-7 in stakeholder involvement. It with WP7 on the assessment of ecosystem services. It feeds into Task 8.5 and Tasks 9.2 – 9.5 and provides stakeholder and institutional analysis and insights into stakeholders’ preferred format, type and content of information to help shape the dissemination and communication strategy in WP11. It also links with WP5 in completing and adapting the WOCAT questionnaires.’ Too many links for a single chart, but charts per WP possible (example next slide)

11 WP3 Data providers Collaboration Data users WP2 WP10 WP2 WP4 WP7
Information on data requirements and methods to be used Collaboration might be required due to time constrains WP10 WP2 WP3 Collaboration Spatial database Stakeholder collaboration and data WP4 State of degradation and conservation Data needs to assess ecosystem services Spatial data to select sites, data needs to assess soil threats WP7 WP5,6,7 Model input Data users WP6 WP7,8

12 WP4 Data providers Collaboration and assistance Data users
WP4 links WPs Data providers WP2 Information soil functions and ecosystem services (WP2.3) Collaboration and assistance WP3 Stakeholder collaboration and data (WOCAT mapping) Demonstrating impact of measures to stakeholders WP6 Training on stakeholder workshops for identification and selection of measures WP5 WP4 Valuation of ecosystem services by stakeholders, exploring the adoption of measures WP7 Dissemination and communication WP11 Policy stakeholder workshop WP9 Input to integrated impact assessment WP9 WP11 Understand stakeholder requirements for the development of dissemination and communication strategy Model input Data users WP 8

13 Policy recommendations
WP 11 – WP Links Data providers All WPs All WPs All WPs Information on planned outputs and target audiences Information for dissemination products Information for hub Collaboration WP6, 7, 8 WP4 WP7, 8 WP9 Technical & Practical guidance WP1 WP9 Stakeholder requirements Adoption barriers Policy knowledge gaps Policy recommendations WP11 WP11 WP11 Dissemination and Communication Hub Dissemination and Communication Strategy Dissemination products Data output

14 WP leader Case Studies WP4 internal work, links case studies
Y1 Y2 2 4 6 8 10 12 14 16 18 WP leader Stakeholder and institutional analysis Guidelines for stakeholder platforms Stakeholder involvement and learning Guidelines for stakeholder & institutional analysis Stakeholder / institutions info Training on stakeholder platforms Regular reporting about stakeholder involvement and learning Case Studies

15 WP leader Case Studies Draft dissemination strategy for discussion
Y2 2 4 6 8 10 12 14 16 18 WP leader Details of WP dissemination outputs for draft strategy Stakeholder discussions Final strategy On-going refinement Review of knowledge gaps Branding strategy Development of hub framework On-going hub development Links between stakeholder platforms and hub Draft dissemination strategy for discussion Stakeholder’s preferred format, type and content Case Studies

16 Set-up of RECARE: WPs work across all Case Studies
Case Studies work across all WPs (esp 3-7)

17 Overall planning

18 Important to move from flow-chart to planning:
Links to other WPs Internal tasks WP leader & links with Case Studies List of steps that are necessary to achieve WP aims and deliverables, with deadlines for these steps Specify what information is needed for these steps, and when Specify who should provide this information: WP leader, other WPs or case studies Specify the workload (esp for Case Studies) associated with each request

19 Important to move from flow-chart to planning:
Specify which knowledge and/or tools the data providers need to provide the data Specify how data-providers will obtain this knowledge and/or tools (training, video instruction, distance learning, manual etc). Are the necessary tools ready, or do the need to be developed/adapted first? How much time is needed for that? Does WP leader need any assistance? Pitfalls that are relevant for WPs

20 RECARE planning Should have a detailed planning for first months on Friday Planning should be realistic, and should avoid overloading of Case Studies

21 To achieve this: WP sessions this afternoon, to explain WP work, identify bottlenecks etc Soil threat sessions & Case study posters tomorrow, to be informed about different threats and to get overview of which data (including research results) are available WP workshops & training on Thursday and Friday

22 Thank You!


Download ppt "RECARE set-up Rudi Hessel on behalf of coordination team"

Similar presentations


Ads by Google