Ofcom Consumer Switching

Slides:



Advertisements
Similar presentations
AmeriCorps is introducing a new online payment system for the processing of AmeriCorps forms
Advertisements

11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
Ofcom Consumer Switching
Ofcom Consumer Switching
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
11 Ofcom Consumer Switching What does it mean for us all? Bev Bytheway-Jackson Product manager
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
These measures are applicable to the 20C Broadband Network. The information contained in this briefing is confidential as per your terms and conditions.
Roadmaps Andy Wright Natalie Walker Simon Brisbourne.
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
GEORGIA ELECTRONIC CONVICTION PROCESSING SYSTEM 1 Georgia Electronic Conviction Processing System (GECPS)
ECHECK REQUEST APPROVER GUIDE Updated 08/10/2013https://enet.miami.edu.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Lead Management Tool Partner User Guide March 15, 2013
Welcome Audio – toggle on the check mark next to your name [1] if you can hear the audio. Microphone or Chat – introduce yourself to the group via microphone.
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
BT Wholesale Ethernet Roadmap Release Update 9 th November 2012.
WBC Quality of Service (QoS) Options 23 rd October 2008 Andy Maddocks Dave Brennan Paul Fishburn Paul Burke.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Childcare And Family Information Service Anne Lalley Choice Adviser.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
WHEN TITLE IS NOT A QUESTION N O ‘WE CAN’ Deal Registration Entry and Submission August 2010.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Briefing to the Portfolio Committee on Police 21 August
1G and 10G MSIL SFOA1 Trial Updates Week Ending: 13 June 2008 Beatrice Osborn Product Development, BT Design.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
SDA Formulas Online Webinar Please use the mute button or press #6 on your phones to mute the teleconference line If you have questions or technical problems.
SDA Formulas Online webinar Tomika Moore Senior Chemist, Nonbeverage Products Laboratory September 13, 2012.
Step 1 Lead Notifications Dear Partner, New leads have been assigned to your organization based on customer preference and are available for you.
Secondary Admissions 2017 Parent information. Key Dates for Parents Registration for Kent Test opens Wednesday 1st June 2016 Registration for Kent Test.
Direct Participation Enrollment Process for 2017 DRAM
eCHECK Request Approver Guide
Register SPID - Retailer
Deposits refund process
Secondary Admissions 2018 Parent information
What’s New in SAMT – November 2016
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Placing an order for Etherway Fibre and Etherflow Connected
Business zone Ethernet – Ordering a Radio Survey
Placing an order for Etherway Copper
Understanding SAMT Administrator Messages
Industry Best Practice Guide: Schedule 2, Part 1 Paragraph 2 Completing RAD 2: Step by Step Guide This document is to be used as a guidance on how to complete.
Tips and Guidelines for Completing your Field Experience
Webinar CMOS General Overview
Writing Settlement Teachers who were required to hand score writing assessments on or about November 2014 without compensation (monetary and/or adequate.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
How to request access to a tool on the Openreach portal
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Release 3 Update 07th March 2018.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Business Zone – User Guide
Business Zone Ethernet – Saving an Order as a Template
Amending an Ethernet order
Annual Quantity (AQ) 45.
How to Cancel a Broadband Order
Secondary Admissions 2018 Parent information
How to raise a fault on Business Zone
Business Zone Ethernet Cease Order Journey – User Guide
Placing an order for E-LAN and Etherflow Dynamic
Getting access to the Ethernet Diagnostics and Fault journeys on Business Zone BT Wholesale Online V3 LEGAL NOTICE: The information contained in this briefing.
Business Zone Ethernet Cancel Order Journey – User Guide
Presentation transcript:

Ofcom Consumer Switching 9 September 2014 Bev Bytheway-Jackson Senior Product Manager Tel: 01244 657938 Email: bev.bythewayjackson@bt.com

Disclaimer The information contained in this presentation slide-pack is confidential information for discussion purposes only and should not be disclosed without British Telecommunications plc. (BT's) permission. Please treat it accordingly and do not forward, republish or permit unauthorised access. Please note that BT has taken reasonable care to check that the information contained in this presentation slide-pack is accurate at the time of issue, however, it is subject to change. In relation to any products/services referred to in this document which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available. References to any such service and time scales contained within this presentation are indicative and estimates for information purposes only and these and other information do not constitute any contractual or other obligation. . © British Telecommunications plc., 2013 British Telecommunications plc. Registered office: 81 Newgate Street London EC1A 7AJ Registered in England no: 1800000

RID Reminder As part of the work that we are doing in relation to Ofcom Consumer Switching we have to introduce mandatory RIDs for BT Wholesale Broadband products.   The products impacted are IPstream, Wholesale Broadband Connect (WBC) and WBMC over IPstream Connect and WBC. The RID is a three-character alphabetic code which is used to identify the 'Gaining CP' (the new party which has entered into a contractual agreement with the end user for provision of services). If you have retailers, you will need a separate RID for each retailer. We are introducing RID and postcode as an optional field in Release AP (14 September) and will be making them mandatory in Release AQ (16 November). If you send us a RID following Release AP, we will validate against it. From 17 November your orders will be rejected if they do not contain a valid RID.

How to request a RID To apply for a RID please;   How to request a RID To apply for a RID please; Email Ofcom via numbering.applications@ofcom.org.uk requesting a S18 RID Application Form. The subject title of the email should be RID REQUEST Complete the form and return it to the same email address. Your request will be processed manually and it could take up to three weeks for the code to be returned. The deadline for applying to Ofcom for a RID, in order to meet with the BT Wholesale mandatory change in Release AQ, is 22 October 2014

Strategic Notice of Transfer KCI’s We are introducing strategic Notice of Transfer KCI’s in Release AP on 14 September. Today you have to download the notifications via BBCR reports (Lost Migration, Migration Summary or Order Delta reports), the strategic KCI1,2 & 3 will be delivered to you in real time KCI1 to tell you an order has been placed KCI2 to give you the date that the cease/migration will take place Trigger for CP to send out NoT letter to End User KC13 to confirm completion of the order Trigger to stop End User billing These new KCIs will be deployed switched off in Release AP due to issues found late in testing. We will notify you of the switch on date as soon as we have it.

CP Action required for Strategic KCI’s We are introducing a new ‘NoT contact’ role in eCo Plus and you will need to select your preference for how you receive KCIs after 14 September. You can do this yourself via the CP Administrator function on eCo Plus via a drop down menu. If you choose email you will need to provide a ‘Primary Contact’ by populating the email address to which BTW should send the cease notifications. We recommend that this is a generic email address rather than a personal one. We have a regulatory obligation to ensure that we are sending you NoT notifications so as a back-up we will also need an email address for a ‘Secondary Contact’ should the ‘Primary Contact’ point fail for some reason. Please email the ‘Secondary Contact’ email address to Bev Bytheway-Jackson bev.bythewayjackson@bt.com asap.

Contact Administration – eCoPlus Find Contact by role

Contact Administration – eCoPlus Find Contact by role

Contact Administration – eCoPlus Contact Role Administration

Contact Administration – eCoPlus Contact Role Administration

Contact Administration – eCoPlus Contact Role Administration

Contact Administration – eCoPlus Contact Role Administration

Release AQ Changes to Cancel Other codes We've identified an issue in testing relating to the new Cancel Other codes In briefing BB1551-14 issued on 15 August 2014, we informed you about the new Cancel Other codes, due to be implemented as part of Release AQ. We're sorry to tell you that due to an issue found in testing, we have had to make changes to the text format of the Cancel Other messages. The Release AQ XML documentation 'Wholesale B2B L2C T2R Rel AQ 12-08-2014' will be updated accordingly. Existing Cancel Other reason in BTW New  Cancel Other reason in BTW Cancel Other-Failure To cancel CancelOther Fail To Cancel Cancel Other-Purchased a Different Product/Service CancelOther Different Product Cancel Other-Deliberate Attempt to Mislead CancelOther Attempt Mislead Cancel Other-Customer Has Never Been Contacted CancelOther No Contact Cancel Other-No Authorisation Given To Transfer CancelOther No Authorisation Cancel Other-Current CP Inflight Order CancelOther Current CP Order