ANGEN UPDATE GC911 Conference - October 20141 John Ellison, Contractor – Alabama 9-1-1 Board.

Slides:



Advertisements
Similar presentations
Chapter 3: Planning a Network Upgrade
Advertisements

The current System Landline caller The emergency call process starts with a caller dialing (highly simplified) © 2011 Colorado Resource.
ISO 9001:2000 Certified Your partner in critical communication SolaCom Public Safety Solutions December, 2007.
Preparing for the Future.  Emergency calls today are primarily voice.  People expect to reach PSAP when dials 911.  People have multiple ways and devices.
Confidential and proprietary material for authorized Verizon Wireless personnel only. Use, disclosure or distribution of this material is not permitted.
Brian Rosen Chair, Long Term Definition WG.  i1 = document older strategies for VoIP into  i2 = standard way to support VoIP on current E9-1-1.
Ami Layman Assistant Director of Administration Getting Started & Funding Fundamentals.
Confidential1 1 Introduction to inetwork and the ANGEN NG9-1-1 dashboard Training Module 1 Gulf Coast NENA October 15, 16.
ANGEN UPDATE ANGEN Gulf Coast Conference1.
ANGEN Update 2013 Gulf Coast Conference John R. Ellison - ANGEN Consultant Alabama Board.
Alabama Next Generation Emergency Network
Module CSY3021 Network Planning and Programming RD-CSY /09 1.
NENA’s 11 th Annual Technical Development Conference A proposal to support E911 calls on Voice over IP Networks Martin Dawson – Nortel Networks.
North American Emergency Services Brian Rosen Emergicom.
Interim Text to Information & Training for TelecommunicatorsInformation & Training for Telecommunicators Version 2 August 26, 2013.
Virtual Data Systems, Inc. Value Proposition of IP Telephony Voice over IP Technologies.
APTA, Kevin Hassett, September 24, APTA Passenger Information Systems.
Improving Customer Satisfaction Through Advances in Remote Management Technology Greg Michel Product Manager Quintum Technologies Inc.
VOIP ENGR 475 – Telecommunications Harding University November 16, 2006 Jonathan White.
Jason Horning, ENP NDACo 6/3/2015 Next Generation Update.
The Hardware Behind the Internet A virtual tour. Pictorial View of the Internet Backbone The “Internet Backbone” refers to the principal data routes between.
ANGEN Alabama Next Generation Emergency Network Roger D. Wilson Chairman, Wireless Board Alabama Next Generation Emergency Network.
VoIP – Case Studies Duncan MacAuslan Task Coordinator - VoIP ITP Training September 2006.
Networking Components Christopher Biles LTEC Assignment 3.
Alabama Next Generation Emergency Network 2012 Alabama Gulf Coast Conference John Ellison, Contractor, CAT - AUM.
PART 2: Product Line. Tenor Switches & Gateways Tenor AX Series Solution For Medium to Large Enterprises  Available in 8, 16, 24 and 48 port Available.
Don McDaniel, DIS Network Services Division Administrator Next Generation State Network.
California SMS Text-to SMS Text-to Pilots Pilots in four locations in California Began testing in November 2013 All pilots tested by end.
MAEDS 45 th Annual Conference October , 2009.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Network Networking for Home and Small Businesses.
1 Prepared by: Les Cottrell SLAC, for SLAC Network & Telecommunications groups Presented to Kimberley Clarke March 8 th 2011 SLAC’s Networks.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
GIS and Indiana’s Next Generation 911 WTH Technology, Inc.
Standards Committee Rules/Standards July Committee Members  Rodney CatesCarteret CountyJim SoukupCity of Durham  Perry DavisCleveland CountyChristy.
State Of California E911 Next Generation Update 2009 Andy Nielsen State of California E9-1-1 Office
Alabama Next Generation Emergency Network AAND Meeting – December 10, 2009 John Ellison, Executive Director, Shelby County
Internet Telephony (VoIP) Henning Schulzrinne Dept. of Computer Science Columbia University Fall 2003.
 Working Group 2: Optimal Approach to NG9-1-1 Architecture Implementation by PSAPs Status Report September 29, 2015.
Draft-rosen-ecrit-emergency- framework-00 Brian Rosen NeuStar CPa
NUOL Internet Application Services Final Presentation 24 th of May, 2004.
LAN Switching and Wireless – Chapter 1 Vilina Hutter, Instructor
Professional Project Management Service “Bringing It All Together”  The Project Manager is responsible for the overall planning and installation of Qwest.
WebEx Cloud Connected Audio Enterprise
New River Valley Emergency Communications Regional Authority
Alabama Next Generation Emergency Network Alabama Chapter of NENA – April 22, 2010.
Running more bandwidth for less dollars State of Arkansas Network Upgrades.
William Anderson, Interim Branch Manager California Emergency Communications Branch September 5, Next Generation (NG9-1-1) In California.
Introduce the project Africa IXP (Team 4). Introduce team members.
JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Help Desk Working at a Small-to-Medium Business or ISP – Chapter 2.
1 E-911 Services Board Meeting General Business Meeting May 10,
ND 911 Association Preparing for NG /24/2010.
1 Session Controllers Micaela Giuhat AVP Product Management Netrake
SIP & How It Relates To YOUR Business. Jeff S. Olson Director of Marco Carrier Services David Bailey-Aldrich Technology.
Princeton Plasma Physics Site Report ESnet Site Coordinator's Meeting, July 2013.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
Indoor and outdoor location and tracking for. SafetyNet Locator provides an opportunity for dealers to add value to existing systems or up-sell an opportunity.
October 4-7, 2004 Los Angeles, CA E9-1-1 In a VoIP World Timothy Lorello SVP, Chief Marketing Officer TeleCommunication Systems (TCS) (410)
Component 8/Unit 1bHealth IT Workforce Curriculum Version 1.0 Fall Installation and Maintenance of Health IT Systems Unit 1b Elements of a Typical.
Elko County E9-1-1 Project Visual Presentation - Final February 1, 2016 Elko Central Dispatch Administrative Authority Project Mission: To provide the.
Internet Telephony (VoIP)
How GIS will support Ng911 in Indiana
Preparing for the Future
Text-to-911 in ND Joint 911 Assoc. / APCO Meeting March 1, 2016
Chapter 1: WAN Concepts Connecting Networks
Your Business Opportunity
Thoughts on VoIP and Emergency Calling
NG911 GIS User Group 2018 Q3 Meeting August 27, 2018 Dial In:
ENGR 475 – Telecommunications
Planning a Network Upgrade
Presentation transcript:

ANGEN UPDATE GC911 Conference - October John Ellison, Contractor – Alabama Board

2 ECDs and PSAPs ECDs and PSAPs – 88 ECDs, 21 City & 67 County – 117 PSAPs – 3 2 ECDs have not joined ANGEN Alabama 9-1-1Board Alabama 9-1-1Board AUM Center for Advanced Technologies AUM Center for Advanced Technologies – Project Oversight and Reporting – Coordination with PSAPs and other Partners – Testing and Training Coordination ANGEN PARTNERS GC911 Conference - October 2014

3 Alabama Supercomputer Authority Alabama Supercomputer Authority (ASA) – Backbone network between ACCRFs – End point connections to PSAPs – 24x7x365 Network Monitoring and Trouble Desk Bandwidth Bandwidth – Core Call Routing Functions – Dashboard - Admin Interface PSAP / ECD Info Call Stats ANGEN PARTNERS GC911 Conference - October 2014

4 Wireless Carriers Wireless Carriers – Re-route calls to ANGEN – Assist with testing – Trouble resolution and ESRK management Selective Router Operators Selective Router Operators – AT&T – 5 – CenturyLink – 2 – Accept consolidated traffic from ANGEN – Send to PSAP on existing trunks ANGEN PARTNERS GC911 Conference - October 2014

ASA ASA ALABAMA SUPERCOMPUTER AUTHORITY 5GC911 Conference - October 2014

6

7 AT&T or Other Ethernet Service Provider Bandwidth ACCRF 10M 1G Trunk To PSAP LAN PSAP ANGEN Connection To PSAP 2M VPN ASA IP Network (AREN) GC911 Conference - October 2014

8 Primary Ethernet Service Provider Bandwidth ACCRF To LAN Port Secondary Ethernet Provider 1G Trunk 10M PSAP ANGEN Redundant Connection To PSAP AREN 4G LTE GC911 Conference - October 2014

9 Cisco 2901 Router Cisco ASA 5505 Firewall 1U ASA Managed and Ethernet Service Provider On-Site Equipment Typical Metro E Network Interface Device (NID) (AT&T Shown) Canoga Perkins U GC911 Conference - October 2014

10 2M ANGEN VPN Up To 8M Other IP Services (Video, IP Radio, CAD, etc.) AT&T or Other Ethernet Service Provider 10M Transport ANGEN 10M Transport Can Accommodate Additional Services GC911 Conference - October 2014

11 Conduit or other access into building – May already have this 2U Rackspace for ASA Firewall & Router 1U Rackspace for Ethernet carrier Uninterruptible Power Supply (UPS) – Very low power draw but UPS is essential – Can purchase one for less than $500 IP CONSIDERATIONS FOR PSAPS GC911 Conference - October 2014

12 ASA contacts PSAP for location specifics Order placed with Ethernet provider “Due Date” established by provider Provider installs circuit ASA tests and configures CPE Vendor makes connection to ANGEN Later session for more detail about Phase II IP WORK FLOW GC911 Conference - October 2014

BANDWIDTH 13GC911 Conference - October 2014

CURRENT STATUS – ACCRFS GC911 Conference - October

ANGEN CALL DELIVERY – PHASE I ACCRF x 2 (Bandwidth) ACCRF x 2 (Bandwidth) PSAPs TANDEMs Wireless MSC LECs VoIP / CLEC Alabama Core Call Routing Facility GC911 Conference - October

GC911 Conference - October IP CALL DELIVERY – ANGEN PII ACCRF x 2 (Bandwidth) ACCRF x 2 (Bandwidth) PSAPs TANDEMs Wireless MSC LECs VoIP / CLEC Alabama Core Call Routing Facility

PSAPs receiving live calls – SouthernLINC, Sprint, T-Mobile, Verizon – DONE – AT&T – Testing Finished – Mid November done – C Spire – 570,299 calls through September 145,969 of those in September – Without AT&T WHERE ARE WE NOW? 17GC911 Conference - October 2014

ANGEN Phase I – Route Calls from ANGEN to Selective Routers No changes for Call Takers ANGEN Phase II – Begin routing calls via IP to PSAPs Testing – live calls in late October / Early November Get additional data – confidence & accuracy – ~52 PSAPs are IP capable – more upgrading Hosted solution for Dothan area CenturyLink PSAPs NEXT STEPS 18GC911 Conference - October 2014

19 ANGEN to Tandems for 2 years or more – No rush to convert a PSAP IF – PSAP is getting new equipment – Wait rather than spend $ to do it again IF – PSAP is Moving IF – Whatever affects a PSAP Legacy PSAP Gateway (LPG) – Can be installed if needed for legacy CPE TIMING CONSIDERATIONS GC911 Conference - October 2014

20 Why would they to move to ANGEN? – Probably using SIP in their networks – Relatively inexpensive for them to move – Potential for nice cost savings 2 connections to ANGEN versus 7 tandems – Easier to maintain – Higher reliability and redundancy – Improved customer service – Hope they advertise “Improved service.” Market forces could encourage other TSPs VOIP CARRIERS GC911 Conference - October 2014

21 Universities, JC’s & K-12 – Already connected to ANGEN (AREN) – Many using VoIP phone systems – Could connect directly to ANGEN for – Add each extension to ALI / LIS BIG improvement in call handling Good place for a Back-Up PSAP… – Already on the ASA network SCHOOLS GC911 Conference - October 2014

22 Wired Carriers – LEC and CLEC Convert – Selective Routers no longer needed – EXCEPT – if there are ECDs not using ANGEN Many PSAPs will want a 2 nd Connection – Still much less than existing costs – Redundancy & diversity to the extent possible – May use 4G/LTE wireless – very affordable – How many PSAPs have 2 connections now? ANGEN PHASE III GC911 Conference - October 2014

Clean up your data – MSAGs GIS – PSAP boundary files – Streets – Address Points – Responder boundaries (ESN) Purchase IP Capable CPE – Would be hard not to buy IP capable now WHAT CAN YOU DO? GC911 Conference - October

24 Start with County and City Boundaries – Blend of Virtual Alabama and data – ALL ESRKs dropped in middle of PSAP Boundary Update GIS – Roads & PSAP Boundaries – Address Points if available Wireless Phase II calls route by Lat-Lon – When Lat-Lon is available - otherwise ESRK – Do not delay routing waiting on Phase II MSAG AND MAP DATA GC911 Conference - October 2014

Phase I & II – Network Install and Monthly = $0 (ZERO) Excess wireless cost recovery funds – PSAPs may need work by your vendor Cost will vary “IP Ready” versus “IP Capable” (with upgrades) Phase III = Some Costs to ECDs ?? – % of wired traffic?? – Not in stone – Board Issue ANGEN COSTS 25GC911 Conference - October 2014

26 More Details & Announcements John Ellison QUESTIONS / DISCUSSION GC911 Conference - October 2014