© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.

Similar presentations


Presentation on theme: "© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or."— Presentation transcript:

1 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter 3

2 ITE PC v4.0 Chapter 1 2 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Purpose of a Site Survey  Documents existing network structure –Shows physical layout to determine if new equipment can be installed  Will also help show... –What is already on site –What type of equipment may be needed –Floor plan of structure  Determine obvious issues –Unlabeled cables –Poor physical security –Lack of power –Lack of UPS

3 ITE PC v4.0 Chapter 1 3 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Perform a Customer Site Survey  What does the technician look for... – Number of hosts or users how many will be added over the next 12 months how many network servers and/or printers are needed – Internet Service and Equipment if upgrading speed, may need to upgrade equipment – Existing network devices type of network equipment installed configurations loaded on devices – Security are additional firewalls needed – Applications VoIP or video conferencing – Wireless or Wired amount of square feet between access points

4 ITE PC v4.0 Chapter 1 4 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Determine the Topologies  Physical topology – actual physical layout of devices  Logical topology – documents what paths are taken through the network – includes: IP addresses device names – workstations – routers – servers

5 ITE PC v4.0 Chapter 1 5 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Perform a Customer Site Survey  Documentation on current hosts and devices  Includes: – device name – location – brand and/or model – operating system – IP addressing – connectivity method – security

6 ITE PC v4.0 Chapter 1 6 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Coming up with a Game Plan  A good plan will help identify the following: – Strengths – Weaknesses – Opportunities – Threats  AKA SWOT

7 ITE PC v4.0 Chapter 1 7 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Phases of the Network Upgrade  Requirements Gathering – analyze data from on-site visit to determine network requirements – done by the design team creates Analysis Report  Selection and Design – selection of devices & cabling – weaknesses of design are identified and addressed here – creation of a prototype  Implementation – overlooked tasks are corrected – constant customer communication is CRITICAL  Operation  Review and Evaluation

8 ITE PC v4.0 Chapter 1 8 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Examining the Physical Environment  Examine existing facilities and existing cabling  Find MDF (Main Distribution Facility) – houses network devices – all network cable concentrate here – may also contain POP of ISP  Any IDFs? (Intermediate Distribution Facility) – additional wiring closets – connect to MDF

9 ITE PC v4.0 Chapter 1 9 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Cabling Considerations  Check cable types needed – STP – UTP – Coaxial – Fiber  Check cable specifications – Straight Through – Crossover – Rollover – Serial  TIA/EIA 568A/568B standard

10 ITE PC v4.0 Chapter 1 10 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Check Out the Cabling  Patch Cable – from PC to wall plate  Horizontal cable – from wall plate to IDF  Vertical cable – from IDF to MDF  Backbone cable – handles major traffic  Wiring closet location  Cable management system – protects cables/cable runs  Cable labeling  Electrical

11 ITE PC v4.0 Chapter 1 11 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Purchasing Equipment for the Network  Managed services – equipment obtained from ISP through a lease – all updates, maintenance, etc. of equipment are the responsibility of the ISP  In-house services – all responsibility falls on the customer

12 ITE PC v4.0 Chapter 1 12 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Selection of Network Devices  Selection of LAN devices – hubs could be used with smaller LANs – switches more efficient managed switch – control over individual ports which is better? (one 24 port switch or 2-12 port switches)  Selection of a WAN device (router) – fixed or modular expansion? fixed – specific number/type of ports modular – includes expansion slots – breaks up collision and broadcast domains

13 ITE PC v4.0 Chapter 1 13 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Cisco Devices  Router – 1841 ISR (Integrated Services Router) – used for medium-sized business – different connectivity options  Switch – 2960 switch – used for Fast Ethernet and Gigabit connectivity

14 ITE PC v4.0 Chapter 1 14 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Network Reliability and Availability  Reliability – can be achieved by adding redundancy to the network – use of two routers instead of one  Five-9’s of availability – network operational 99.999% of time  Use of fault tolerance helps to ensure reliability – a network will continue operating properly in the event of a failure – Use of the following devices will help ensure fault tolerance UPS multiple power supplies hot-swappable devices

15 ITE PC v4.0 Chapter 1 15 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public IP Addressing Plan  The following devices will need IP addresses – user PCs – servers – printers, IP phones – router LAN interfaces – router WAN (serial interfaces)

16 ITE PC v4.0 Chapter 1 16 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Summary  A site survey including extensive documentation of both physical and logical network information must be performed before a network upgrade can be planned.  The five phases of a network upgrade include requirements gathering, selection and design, implementation, operation, and review and evaluation.  Structured cabling deals with the placement of cables, location of wiring closets, cable management, and electrical considerations.  Cost and expandability are important considerations when planning equipment upgrades.

17 ITE PC v4.0 Chapter 1 17 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public


Download ppt "© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or."

Similar presentations


Ads by Google