October 30, 2014 Presented by: Penfield Building Committee - James Bradley, Chair Robert Bellitto, Vice Chair, Andrew Graceffa, Secretary Ian Bass, Jane.

Slides:



Advertisements
Similar presentations
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Advertisements

MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
Comparative Analysis Two Potential Sites for a New High School.
CONSTRUCTION DEFECT RECOVERY FROM SURETY: THE SINKING BUILDING TALE PRESENTATION AT DES CLIENT WORKSHOP OCTOBER 8, 2014 BOB BOURG, DES CLAIMS AND DISPUTES.
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Click to continue…. Railroad Track wetland Image Date: December 2003.
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003 URS Corporation January 22, 2003.
AFFILIATED ENGINEERS, INC. THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Presented to Houston Area Association of Hospital Engineering July.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Chapter 6 Standards for Floodplain Development and Building Protection.
Flood Avoidance and Mitigation
Commercial Foundations
Larrison Pavilion Deming Park Terre Haute, Indiana.
Design Overview for: Wright’s Mill Pool Amenity Center Madison, MS Problem: This +/- 220 home community was built in the mid-1990’s. The developer built.
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Local Adaptation Efforts Along the Massachusetts Coast Julia Knisel Coastal Shoreline & Floodplain Manager.
FEMA’s Mitigation Assessment Team Program – Where Have We Been and Where Have We Still To Go? 2010 ASFPM National Conference John Ingargiola – FEMA Eric.
TOWN OF WALPOLE FACILITIES PLAN UPDATE SPRING ANNUAL TOWN MEETING MAY 7, 2014.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Taylor Pavilion Design Review Pavilion Design Review Committee 2015 June 3, 2015 Belmar Mayor & Council form an advisory committee to review the.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Tracking No Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
Affordable housing project
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Foundation Loads Dead Load Live Load Wind Load
Framed Structures Luisana Hernández.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
Planning Commission Second Unit Study Session. Tonight’s Conversation Project Background (10 minutes) Community Process (10 minutes) Council Direction—Ord.
South Greenville Recreation Center and Park Master Plan.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
BOMES THEATER INFORMATIONAL MEETING Department of Planning & Development City of Providence October 24, 2013.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Government Center Study Update City of Creve Coeur December 8, 2014.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
MENTAL HEALTH CLINIC Siting Process and Analysis.
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
NAU International pavilion expansion
Construction 101 Start to Finish
Elaborating The Committee Charter:
4th Annual Construction Law Summit
Moraga community Foundation
Penfield Pavilion Status Report
Welcome.
Building Construction I Sofia Sebastian 1
How & When to Get Permits for Work in Your Home
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Recent Bond Accomplishments
Presentation transcript:

October 30, 2014 Presented by: Penfield Building Committee - James Bradley, Chair Robert Bellitto, Vice Chair, Andrew Graceffa, Secretary Ian Bass, Jane Nelson, Ken Jones, Ellery Plotkin, Richard Speciale Kevin Chamberlain, DeStefano & Chamberlain Penfield Pavilion Status Report

Committee Charge Pavilion History Research & Due Diligence, Considerations Background Repair Options – Design Comparison – Recommended Design Detail Bulkhead Improvements 2 Presentation Agenda

Formed by Board of Selectmen in December 2013 Committee Charge – “...review and recommend options and manage the repair.. “ – “…be guided by the engineering analysis, coastal engineer’s report, geo-technical report, FEMA standards and guidelines, flood mitigation plan, technical reports, comments for the public…” – “…retain appropriate design professionals (architect, structural engineer, coastal engineer and geotechnical engineer…” – “…retain a construction manager/owner’s representative to facilitate and accomplish ….” 3 Penfield Building Committee

Pavilion History Original Penfield Pavilion was purchased in 1982 New Pavilion was built in phases on the same footprint of the old Pavilion – Phase I – East Wing (Lockers) Approved 12/2006 RTM vote: 36 in favor, 5 opposed, 3 abstentions Built 2007/2008 – Phase II – West Wing (Rental Hall/Kitchen/Restrooms, First Aid and Lifeguard Facility, etc) Approved 9/2010 RTM vote: 31 in favor, 9 opposed, 1 abstention Built 2010/2011 4

Tropical Storm Irene High winds/astronomical high tides; Storm surge but low wave energy

6 Impact to the Pavilion Erosion of sands underneath the building Several footings undermined Front entrance porch settled Tropical Storm Irene

Irene Restoration 7 Restoration of the Pavilion Included: Underpinning performed Protective bulkhead designed and constructed Building structure repaired and reopened Certain recommended modifications not completed

Tropical Storm Sandy Category 2 Hurricane downgraded to a post- tropical cyclone. High winds and storm surge.

Tropical Storm Sandy Damage 9 Impact to the Pavilion Existing spread footings performed poorly Loss of beach Sand behind bulkhead liquefied Sands surrounding and under footings eroded/scoured Existing bulkhead opening provided a convenient channel for sand transport and funneled flood waters – increasing velocity

Tropical Storm Sandy Damage 10 Impact to the Pavilion Foundation settlement Structural damage Damaged building systems and finishes Building deemed unsafe by Town Building officials

2014 Site Protection Committee approved additional protection and make-safe safety measures: – Additional security fencing – Inspection of gas and electrical systems – Installed alarm/security system – Temporary Removal of Gathering Hall Glass In storage for reuse – Permanent closure of openings in bulkhead 11

Original Penfield Phase I and Phase II construction documents Investigative engineering reports (Irene and Sandy) – JM Albaine Engineering – Roberge Associates Coastal Engineers – Heller and Johnsen Geotechnical Engineers Storm damage insurance claim, repair, scope and cost estimates – Wakelee Associates – Romano Construction – Saugatuck Construction Group Engineer, Architect and Construction Manager interviews – Competitive interview and selection April/May 2013 – DeStefano & Chamberlain and Shawmut Design & Construction selected Public input 12 PBC – Research and Due Diligence

Presentations before the Committee: – JM Albaine Engineering (including results of 8/2013 Public Forum) – Roberge Associates Coastal Engineers – Heller and Johnsen Geotechnical Engineers – Fairfield DPW and Engineering Departments – Building Department – Conservation Department – Parks and Recreation Director – Town Plan and Zoning (including FEMA/Flood Zone requirements) – Town Risk Manager (insurance settlement) – Flood and Erosion Control Board – Report regarding additional soil borings 13 PBC – Research and Due Diligence

14 Extent of foundation damageBeach accretion and loss Cause of damage/Contributing factorsExisting timber bulkhead location/performance Feasibility of RepairsFacility /site impact on neighborhood flooding Existing site soil conditionsConstructability and project safety Footing depthsBuilding height and mass – impact on neighborhood Alternate foundation designs and soil bearing quality/capacity Project Cost Coastal Storm Impacts – past and futureCost recovery funding resources Coastal Storm protectionInsurance Claims FEMA Flood Zone RequirementsSchedule PBC – Factors Considered

Repair Options PBC reviewed 11 repair options to varying degrees 8 options were reviewed during the 8/14 Committee meeting 3 options were added after the 8/14 meeting (two in response to public comment) 4 repair options given final consideration Repair & Protect (Option 1) Complete Demolition & Site Reconstruction (Option 8) Demolition & Construct Smaller Facility (Option 9) Modify & Raise Building (Option 7) 15

Background Pavilion Appraised Value: $5,400,000 (insurance settlement criteria) Current FEMA requirements must be followed if the value of the repair is greater then 50% of the estimated value of the building. – Pavilion actual construction cost would need to be no greater than $2,650,000 Coastal and Structural Engineering Recommendation: the building should be re-supported on a new flood-resistant pile foundation system 16

17 Background (cont’d)

Site FEMA Flood Zone changed from an A zone (moderate wave action) to a V zone (high velocity wave action) – Original construction was FEMA AE Zone – A zone: Base Flood Elevation (BFE) of 11.0’ finish floor – V zone: Base Flood Elevation (BFE) of 13.0’ (Note: measured to lowest horizontal structural element) 18 Background (cont’d)

19 Background (cont’d)

Building is repaired in place Repair structural and non-structural damage per insurance settlement scope Underpin only footings which were undermined and failed Place a layer (blanket) of surge stone underneath the West Wing Construct low bulkhead across north (parking lot) side of building Schematic Cost estimate: $3,222, Repair & Protect – Scope (Option 1)

Pros: – Low cost (if FEMA threshold not exceeded) – No impact to Town programming (use of facilities) – Operating income not impacted Cons: – Shallow, spread footings remain – Repaired building not FEMA compliant Risk of reoccurrence of the damage from Sandy. – Final cost could exceed the FEMA threshold – High cost risk for scope of work – Engineer team, DeStefano & Chamberlain, Inc. does not recommend foundation repair or reconstruction that does not involve pile (deep) foundations and elevated building Committee’s Conclusion: Not Recommended 21 Repair & Protect – Pro/Con

Demolish the pavilion, all footings, foundation and bulkhead Remove all site utilities Create a new, continuous reinforced berm connecting Durrell Pavilion to Rickards Beach Note: ADA and vehicular access to be maintained Conceptual Cost estimate: $808, Complete Demolition & Site Reconstruction – Scope (Option 8)

Pros: – Lowest cost option – Site protection (beach erosion) – Added flood mitigation Cons: – Existing Town Asset (Pavilion) demolished – Loss of Town programming space – Creates safety and convenience issues: distance to first aid station, bathrooms and life guard station Committee’s Conclusion: Not Recommended 23 Complete Demolition & Site Reconstruction – Pro/Con

Demolish current building (both wings) and foundations Bulkhead to remain Design and build a new smaller pavilion – 6000 sq. feet total: 2500 sq. feet pavilion, 2500 sq. feet open and covered deck plus 1000 sq ft ramps Timber pile supported foundation at FEMA V Zone elevations. Create a continuous flood mitigation berm connecting Durrell Pavilion to Rickards Beach Facility will have basic beach public services – Changing Rooms, Restrooms, Shower, Day Lockers, Life Guard/First Aid Station, Concession (kitchen). Conceptual Cost estimate: $2,860, Demolition & Construct Smaller Facility Scope (Option 9)

Pros: – A low cost option – Facility built to FEMA standards – Stays within current footprint – Low risk regarding future flood damage Cons: – Existing Town asset (pavilion) not utilized – Current Town programming is restricted with loss of revenue – Additional schedule impacts Design new pavilion Town and Administrative approval Committee’s Conclusion: Not Recommended 25 Demolition & Construct Smaller Facility – Pro/Con

Demolish the East Wing Demolish Exterior decks – Not financially practical to move – tear off and reconstruct Lift/move the West Wing building into the parking lot – Repair structural and non-structural damage Build new concrete and timber pile foundation New steel elements supporting floor structure Create a new, continuous berm connecting Durrell Pavilion to Rickards Beach 26 Modify & Raise Building – Scope (Option 7) Committee Recommended Repair

Move West Wing back in place, 3.5’ higher in elevation Repair any remaining damage Construct smaller East Wing with Rest rooms, Changing Area, Day Lockers and exterior decking Fill beneath and around the building Construct on grade decking New stairs and ramps Design and Development Cost estimate: $4,558, Modify & Raise Building – Scope cont’d

Pro’s: – Minimal risk – Existing Town Asset (Pavilion) is reused – Original amenities are in place – FEMA standards are met – Increased parking – Engineer’s opinion: It is the recommended solution. The design will reduce the risk for future storm damage Con’s: – Higher cost – Slight reduction in programming due to removal of 200 lockers Committee’s Conclusion: Recommended 28 Modify & Raise Building – Pro/Con

Modify & Raise Building (Option 7) Committee Recommended Design Design Detail 29

Step 1 – Partial Demolition 30 Existing Locker Wing, decks and stairs to be Demolished Remove Existing Elevated Decks, Ramps and Stairs. Roofs To Remain

31 Temporary building location Step 2 – Move Building

32 Cut back existing floor joists Remove existing dropped wood beams Install galvanized steel beams with wood blocking Install galvanized steel stub column down to concrete pier Pier Grade beam Timber pile Step 3 – Install Foundations

Infill ALL openings in accordance with original design Riprap stone revetment on Long Island side of bulkhead 33 Bulkhead Improvements