XB YETS-2014-2015 PS-TT2 Indico 355427 EDMS 1448498.

Slides:



Advertisements
Similar presentations
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Advertisements

IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
NA YETS: schedule week by week S. Evrard.
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Update on the PSB Cooling and Ventilation Systems
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review
Framework Schedule from EYETS 2016 to LS2
SPS LS1 Planning meeting (N019) 04/09/13
YETS & LS2 Works EN-El on LHC / Power distribution
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
Injector De-cabling Project
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
AD consolidation activities in LS2
LIU–PLI report LIU PSB meeting.
SHORT LHC-TS Coordination meeting #1
EYETS16-17 ACTIVITIES EN-EL-CF
Status of the BI Work Package in the LIU-PSB frame
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
EN-HE SPS works during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
CV maintenance works during YETS
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
WPs concerned by L4 connection:
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Short LHC-TS week 38 Confirmed by LMC on 16th August
EN-CV interventions during EYETS for PS and PSB
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
LHCb & EYETS
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
Experimental Areas – LS2 planning
East Hall under construction
Linac4 Connection Broken Line 07/08/19
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

XB YETS PS-TT2 Indico EDMS

PS & TT2 Conditions During YETS Thursday, 4 December 2014 S. Mataguez EN/MEF/OSS Coordination Meeting for the PS tunnel and TT2 – EDMS Beam stop 06:00 Switch off all equipment in a controlled manner All equipment switched off, but not “consigné” PS & TT2 remain in restricted access Christmas break: Access point in «Closed» mode 19/12/ :00 to 05/01/2015 8:00 32nd meeting of the Facilities Operations Meeting - YETS organisation (R. Steerenberg)

CCC staffing during YETS Thursday, 4 December 2014 S. Mataguez EN/MEF/OSS Coordination Meeting for the PS tunnel and TT2 – EDMS nd meeting of the Facilities Operations Meeting - YETS organisation (R. Steerenberg)

CV activities for XMAS Thursday, 4 December 2014 S. Mataguez EN/MEF/OSS Coordination Meeting for the PS tunnel and TT2 – EDMS CircuitsStopRestart PS PS – Central building Anneau 17/12/201406/01/2015 PS – Main magnet17/12/201413/01/2015 POPS17/12/201413/01/2015 PS – Chilled waterRunning (for the linac 2) Emptying the primary circuits and cleaning of the cooling towers Repairs / Bugs fixing Necessary maintenance (filters, belt, greasing, …) Works will be performed during the closure but not in the machines (no access needed) 35 th meeting of the Facilities Operations Meeting - CV activities for XMAS (S. Deleval)

IMPACT Activity Thursday, 4 December 2014 S. Mataguez EN/MEF/OSS Coordination Meeting for the PS tunnel and TT2 – EDMS ActivityTitleSystemResponsible Longitudinal Damper Cavity A - AccelerationMATTHIAS HAASE Inspection ligne de transfere L2 => Booster A - AccelerationCHRISTIAN MASTROSTEFANO YETS PS 10MHz cavity A - AccelerationVALENTIN DANIEL DESQUIENS Cavity 89 : reparation tuner & Cavity A - AccelerationVALENTIN DANIEL DESQUIENS Camera replacement PE.BTV16 B - Beam InstrumentationSTEPHANE BURGER Replacement of the camera of F61.BTV01 B - Beam InstrumentationSTEPHANE BURGER Replacement of the camera of FT16BTV.388 and FTA.BTV9003 B - Beam InstrumentationSTEPHANE BURGER TT2 BPM maintenance B - Beam InstrumentationJEROEN BELLEMAN PS BPM maintenance B - Beam InstrumentationJEROEN BELLEMAN Maintenance DCCT (PS-TR34) B - Beam InstrumentationPATRICK ODIER Mesures transformateurs PS B - Beam InstrumentationFRANCO LENARDON Inspection of SEMgrids TT2 B - Beam InstrumentationMICHEL DURAFFOURG Inspection of SEMgrids ITH Line B - Beam InstrumentationMICHEL DURAFFOURG PS FWS FWS54, FWS65 exchange B - Beam InstrumentationWILLIAM ANDREAZZA 15XXXXX Drain blockage between East and PS ring??? C - Civil EngineeringRICHARD MORTON Câblage BPM ligne BTP YETS-PS E - ElectricityGEORGI MINCHEV GEORGIEV Test PR.DHZOC18 power circuit E - ElectricitySIMON MATAGUEZ Cablage RF 25KV (entre Bat 355 et Bat 151) E - ElectricityPATRICK LELONG Cablage FGC-ETHER (Bat 355 R-005/R-021) E - ElectricityPATRICK LELONG Cablage RF entre Bat 353 et Bat 151 E - ElectricityPATRICK LELONG Câblage PS-ECLOUD (SD98) E - ElectricityPATRICK LELONG Test cable abimé sur porte YEPZ01.SWY=151 E - ElectricityPATRICK LELONG demontage vanne TA reseau EG sur station 4 F - FluidsHASSANE SABRI PSR - Mesures Piliers vers MU's G - Survey and GeodesyTOBIAS DOBERS Scan machine PS (suite et fin!) G - Survey and GeodesyTOBIAS DOBERS Inspection LBS.BVT10 Handling OperationsRICHARD SCRIVENS Blindage chicane bat.151/350 ECR??? Handling Operations DOMINIQUE BODART / SYLVAIN FUMEY Inspection de sécurité levage Hoisting EquipmentLAURENT COLLY Inspection and maintenance crane PS Hoisting EquipmentGILLES ROCHE ActivityTitleSystemResponsible Visite pour mise a jour layout L - Layouts and assembliesJEAN-MICHEL LACROIX Visite pour mise a jour layout L - Layouts and assembliesJEAN-MICHEL LACROIX Verification septa SEH23/31 M - Magnetic ElementsANTOINE PROST Inspection visuelle Septa M - Magnetic ElementsTHIERRY MASSON Inspection of the magnets in LTB, LBE, LBS, BI and BTP M - Magnetic ElementsANTONY NEWBOROUGH PS&TT2 Evacuation plan to check P - Personnel safetySIMON MATAGUEZ 35XXXXX 3 days of testing with the POPS R - Power converterFULVIO BOATINI Inspection de sécurité générale S - General SafetyTHIBAUT GILLES Inspection de sécurité générale S - General SafetyTHIBAUT GILLES Inspection and maintenance SFDIN détection incendie TT2 S - General SafetyDENIS RAFFOURT Inspection and maintenance SESEV Evacuation TT2 S - General SafetyDENIS RAFFOURT Inspection and maintenance SESEV Evacuation PS Ring S - General SafetyDENIS RAFFOURT Inspection and maintenance SFDIN détection incendie PS S - General SafetyDENIS RAFFOURT RP Survey & RP follow-up YETS S - General SafetyGERALD DUMONT Inspection and maintenance PS Beam Stopper + SLITS T - Targets and DumpsJEROME LENDARO Inspection and maintenance - PS Internal Dump T - Targets and DumpsJEROME LENDARO Inspection and maintenance - PS Beam Stopper T - Targets and DumpsJEROME LENDARO Inspection and maintenance PS RADMONs + Radfets + Batmons T - Targets and DumpsJEROME LENDARO Inspection and maintenance ventilation extraction POPS U - VentilationHASSANE SABRI Inspection and maintenance ventilation +reseau EG+EC U - VentilationHASSANE SABRI Inspection and maintenance ventilation LOCAL RF ET VIDE U - VentilationHASSANE SABRI Inspection Visuelle VRJA + jauge penning V - VacuumFRANCOIS PAUL BELLORINI Intervention BE-OP (CPS) Y - Access systemFABRICE CHAPUIS Inspection and maintenance Access & Safety System Y - Access systemDIDIER CHAPUIS 53XXXXX Maintenance Lift AS-35 TT2 B H-15H 18/12/14 Y - Access systemNICOLAS PEREZ 54XXXXX Maintenance Lift AS-104 B H-15H 13/01/15 Y - Access systemNICOLAS PEREZ 55xxxx Maintenance Green Spaces Service Mathieu Emmanuel Fontaine Condition: Vacuum interventions during XB for FWS54, FWS65, and C80-89 in SS89. In order to ensure a good vacuum for the ion run, interventions are requested to take place in week 51 preferably as early as possible

From 15/ to 17/ Thursday, 4 December 2014 S. Mataguez EN/MEF/OSS Coordination Meeting for the PS tunnel and TT2 – EDMS  2 days of testing with the POPS But with 2 breaks: o EN/EL Test safety system(Diesels). General power cut. 16/12/2014 Approx time 6.00 à 6.10 (10 mn) o RP Survey 16/12/2014 from to (3 hours) – 32 hours after Beam Stop  Restricted access to PS & TT2 allowed from 17/ to 16/ BE/CO Controls Maintenance 05/01-07/01 Close PS & TT2 Ions to PS Test safety system (Diesels).

Draft planning for discussion Thursday, 4 December 2014 S. Mataguez EN/MEF/OSS Coordination Meeting for the PS tunnel and TT2 – EDMS DECEMBERJANUARY Week 51Week 2Week 3Week Beam off 06h00 POPS tests PS – Central building rING Cooling stations maintenance POPS Main magnet PS RP patrol (32h after beam stop) from to (3 hours) Test safety system (Diesels). (10 ' cut) PS FWS FWS54, FWS65 exchange Cavity 89 : reparation tuner & Cavity PS & TT2 Access closed Inspection and maintenance crane PS (payload needed) Cabling campaign Access maintenance and inspections (Access points not available) Ventilation maintenance and inspections detection incendie et evacuation Blindage chicane bat.151/350 ECR??? Maintenance Lift AS-35 TT2 B H-15H 18/12/14 Drain blockage between East and PS ring??? Bldg. 352 * * ** * Blind access needed ** Sector closed

Cabling campaign Thursday, 4 December 2014 S. Mataguez EN/MEF/OSS Coordination Meeting for the PS tunnel and TT2 – EDMS Câblage BPM ligne BTP YETS-PS E - Electricity GEORGI MINCHEV GEORGIEV Test PR.DHZOC18 power circuitE - ElectricitySIMON MATAGUEZ Cablage RF 25KV (entre Bat 355 et Bat 151)E - ElectricityPATRICK LELONG Cablage FGC-ETHER (Bat 355 R-005/R-021)E - ElectricityPATRICK LELONG Cablage RF entre Bat 353 et Bat 151E - ElectricityPATRICK LELONG Câblage PS-ECLOUD (SD98)E - ElectricityPATRICK LELONG Test cable abimé sur porte YEPZ01.SWY=151E - ElectricityPATRICK LELONG HT test septa SEH23/ /12&16/12 RF Cavities test - 05/01-16/01

Shielding block CHICANE Bldg.151 project Thursday, 4 December 2014 S. Mataguez EN/MEF/OSS Coordination Meeting for the PS tunnel and TT2 – EDMS Courtesy Dominique Bodart, Frederic Delsaux If ok shielding blocks will be removed week 2 (sector closed)