Presentation is loading. Please wait.

Presentation is loading. Please wait.

YETS 2015-2016 PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? www.cern.ch/pswww.cern.ch/ps Many thanks.

Similar presentations


Presentation on theme: "YETS 2015-2016 PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? www.cern.ch/pswww.cern.ch/ps Many thanks."— Presentation transcript:

1 YETS 2015-2016 PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? www.cern.ch/pswww.cern.ch/ps Many thanks to all those who have contributed

2 Simon Mataguez, 26 November 2015 https://espace.cern.ch/be-dep/BEDepartmentalDocuments/BE/Injector_Schedule_2016.pdf https://espace.cern.ch/be-dep/BEDepartmentalDocuments/BE/Injector_Schedule_2015.pdf Injector Accelerator Schedule https://espace.cern.ch/be-dep/BEDepartmentalDocuments/BE/

3 Simon Mataguez, 26 November 2015 PS&TT2 Year End Technical Stop 2015-2016 http://ps.web.cern.ch/content/pstt2-year-end-technical-stop-2015-2016 Access Constraints

4 Planning YETS 2015-2016 EDMS1510007 https://espace.cern.ch/PSandTT2Schedules/YETS_PSTT2-2015_2016/_layouts/15/start.aspx#/SitePages/YETS_2015-2016_Planning.aspx1510007 https://espace.cern.ch/PSandTT2Schedules/YETS_PSTT2-2015_2016/_layouts/15/start.aspx#/SitePages/YETS_2015-2016_Planning.aspx Simon Mataguez, 26 November 2015

5 YETS 2015-2016 – Diagnostic Period Simon Mataguez, 26 November 2015

6 Simon Mataguez EDMS 1549666

7

8 YETS 2015-2016 – BE-BI Simon Mataguez, 26 November 2015 BPM SS90 are delayed

9 Simon Mataguez, 26 November 2015 YETS 2015-2016 – BE-RF

10 Simon Mataguez, 26 November 2015 YETS 2015-2016 – TE-VSC

11 Simon Mataguez, 26 November 2015 YETS 2015-2016 – TE-VSC

12 YETS 2015-2016 –EN-EL Simon Mataguez, 26 November 2015

13 2. Copper cabling PS 2/8 12/11/2015P. Lelong Campaign PSREX-YEA1 QFN/QDN: -FZ143 -FZ144 -FZ173 -FZ175 APOLO: -FZ167 -FZ170 REMOTE-RESET: -FZ100 -FZ102 -FZ123 OASIS BLM: -FZ138 RENOV DI Z29: -FZ141 INTERL LEIR: -FZ148 MTG: -FZ156 CTRL CONV: -FZ172 Reprise 4 câbles: -FZ161 CABLAGE BE-CO: -FZ939 (Bat 354-353-359- 368-152-365-363)

14 2. Copper cabling PS 4/8 12/11/2015P. Lelong Campaign PSRIN-YEA1 Interl. LEIR: -FZ148 WIC Linac3: -FZ150 BTV Hall Est: -FZ159 Porte Secteur Bat352: -FZ180 Jauges (9/17/18/32): -FZ160 Pickup SS90: -FZ162 GSM: -FZ168 BGI (SS82): -FZ146 Attente infos! Tests câble Finemet: -FZ174 -FZ179 Cavités RF: -FZ147

15 2. Copper cabling PS 5/8 12/11/2015P. Lelong Campaign PSRIN-YEB1 (if possible) This campaign could be started but not surely completed! AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ177001BAT 353 - PSCABLAGE BLM (PS-BLO)BE-BIZAMANTZAS8517555 Câbles BLM: -SD14 à SD18 Câbles BLM: -SD40 à SD49 Câbles BLM: -SD71 à SD83

16 2. Copper cabling PS 6/8 12/11/2015P. Lelong Campaign ADEX-YEA1 (From AD to TT2) AffaireLOCALISATIONTitleGroupUserNb. cablesLength (m) FZ104001BAT 193 – TT2CABLAGE TRANSFO TFA9012BE-BILENARDON2540 Plateforme de racks AD Transfo TFA9012

17 YETS 2015-2016 – EN-HE Simon Mataguez, 26 November 2015

18 PR40 Replacement Remplacement of PR-40 in B.352 Between weeks 1 et 4 (total immobilization of the crane and constraints to access PS by the B.352) Working area

19 PR3 long-travel revamping Long travel mechanism replacement of PR-3 in B.151 Scheduled for weeks 6 & 7 Total unavailability of the crane during the works Possibility of using a Mobile crane inside the building

20 YETS 2015-2016 – EN-CV Simon Mataguez, 26 November 2015

21 YETS 2015-2016 – TE-ABT Simon Mataguez, 26 November 2015 http://elogbook.cern.ch/eLogbook/event_viewer.jsp?eventId=1795272

22 Simon Mataguez 18 November 2015 Access Tunnel 350 U0-223

23 Removal 11/01 – Return 05/02 Simon Mataguez, 26 November 2015 EDMS1145488 : "Integration du point d'acces zone SWITCH YARD YEA01.SWY=151 http://elogbook.cern.ch/eLogbook/event_viewer.jsp?eventId=1801709

24 Simon Mataguez, 26 November 2015 ECR. PS-JS-EC-000 : "Shielding in Access Tunnel SWY-151" ex-door 122 http://elogbook.cern.ch/eLogbook/event_viewer.jsp?eventId=1870943 Removal 12/01 – Return 04/02

25 YETS 2015-2016 – TE-EPC Simon Mataguez, 26 November 2015 YETS 2015-2016 – BE-CO

26 YETS 2015-2016 – TE-MPE,TE-MSC Simon Mataguez, 26 November 2015 YETS 2015-2016 – EN-STI

27 YETS 2015-2016 – GS - General infrastructure services Simon Mataguez, 26 November 2015

28 New Sector PS-Y-EC-0001 – EDMS 1460549 Simon Mataguez, 26 November 2015

29 YETS 2015-2016 – EN-MEF Survey Simon Mataguez, 26 November 2015

30

31 CDS/1776174


Download ppt "YETS 2015-2016 PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? www.cern.ch/pswww.cern.ch/ps Many thanks."

Similar presentations


Ads by Google