PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.

Slides:



Advertisements
Similar presentations
Public Scoping Meeting December 3, 2012
Advertisements

Contractor Management. Struggling with Contractor Management ? ? ? Getting purchasing on board? Specifically stating environmental compliance in contracts?
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Sacramento Local Agency Formation Commission (LAFCo) Draft Environmental Impact Report SMUD Amendment of the Sphere of Influence and SMUD Yolo Annexation.
Welcome to the Public Scoping Meeting for California State University, Fresno (CSUF) Campus Master Plan Environmental Impact Report (EIR) Wednesday, January.
Yuba-Sutter Regional Conservation Plan EIS/EIR SCOPING MEETING January 6, 2015.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Stakeholder Workshop July 27, Present updated information on the Central Groundwater Storage Plan Receive additional stakeholder input Discuss next.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Sacramento Local Agency Formation Commission Peter Brundage, Executive Officer; Donald J. Lockhart, Assistant Executive Officer; Diane Thorpe, Commission.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
David Rizk, DirectorKevin Colin Development Services DepartmentLamphier-Gregory, EIR Consultant South Hayward BART/Mission Blvd Form-Based Code Draft Supplemental.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
WELCOME! Public Scoping Meeting for the Proposed Designation of the “LA-3” Ocean Disposal Site July 21, 2003: Peter & Mary Muth Interpretive Center Newport.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
Skyline Heights City of Corona Scoping Meeting March 4, 2014.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
An Overview of our Community’s Stormwater Management Program
LAFCO’s and CEQA Discussion Problem The City of San Garbanzo prepared an EIR in connection with a regional commercial project “Big Box Mall” to be located.
1 Completing the CEQA Checklist Terry Rivasplata.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
CEQA and the Delta Plan Presentation to Delta Stewardship Council February 24, 2011.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Environmental Impact Report (EIR) Update May 2, 2016.
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Providence Saint John’s Health Center Phase II Project
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Facebook Campus Expansion Project EIR
City of Los Angeles Department of Public Works Bureau of Engineering
Overview What is the CEQA environmental review process?
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
John Tinger U.S. EPA Region IX
Completion Report Summary
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
Brackish Water Desalination Project
Brackish Water Desalination Project Draft EIR
Wildland Fire Policy Revision
Sacramento Local Agency Formation Commission
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007

2 Overview SAM Background Wet Weather Flow Management Project - Overview and Project Details CEQA Process Summary of Analysis Next Steps

3 SAM Background Sewer Authority Mid-Coastside (SAM) Serving a Population of ~25,000 SAM’s Regional System Includes: – 3 Main Pumping Stations – 8-mile Wastewater Conveyance Line along Highway 1 – Wastewater treatment plant (WWTP) in Half Moon Bay – Ocean Outfall

4 SAM Background (Cont’d) 174 Sanitary Sewer Overflows Reported from 2000 to 2004 USEPA Report to SAM; Increase Capacity SAM’s 2006 response to EPA report  Proposed Wet Weather Flow Management Project

5 Project Purpose and Objectives Prevent Untreated Sewage Overflows Contain Infiltration and Inflow during Storm Events Help Maintain Clean Beaches Efficiently Manage Wet Weather Flow through System Conveyance &/or Storage Improvements

6 Proposed Project PROJECT: Wet Weather Flow Management Project LEAD AGENCY: Sewer Authority Mid-Coastside (SAM) LOCATION: Half Moon Bay, California

7 Wet Weather Flow Management Project Components Two Options Being Considered 1. One underground 600,000-gallon tank 2. Approximately 8,850-foot underground pipeline Both options include improvements at the existing Portola Pump Station in El Granada

Project Area

Storage Tank Site at Portola Pump Station

10 Coronado and Highway 1, Facing South Facing South on Highway 1 Junction Box 2

11 Prepare an Environmental Impact Report (EIR) CEQA - California Environmental Quality Act Disclose Environmental Impacts Reduce/Minimize Environmental Impacts Disclose Agency Decision Making Foster Inter-Agency Coordination Include Public Participation

12 Notice of Preparation August 15 – October 19, 2007 Comments Draft EIR May 2008 Final EIR Comments Board Certification CEQA Process

13 Topics To Be Addressed in the EIR Hydrology/Water Quality Geology/Soils Biological Resources Cultural Resources Land Use/Recreation Agricultural Resources Establish Measures to Mitigate Impacts Air Quality Noise Traffic Hazardous Materials Visual Resources Public Services/Utilities

14 Potential Project Impacts Construction-Related: – Noise, Dust, Traffic, Erosion – Best Management Practices (BMPs) will be Implemented to Minimize Impacts Operation and Maintenance: – Minimal Number of Staff – Limited Impact to Traffic and Public Services

15 Other Topics Required by CEQA Cumulative Analysis Growth-Inducing Effects Alternatives – No Project – Alternatives to the Project

16 CEQA – Next Steps NOP Review Period – In progress – Submit written comments to John F. Foley III at SAM by October 19, 2007 Preparation of the Draft EIR Publish Draft EIR: May 2008 Incorporate Public and Agency comments Prepare Final EIR EIR Certification Project Approval

17 Public Comments or Questions John F. Foley III, Manager Sewer Authority Mid-Coastside 1000 N. Cabrillo Highway Half Moon Bay, CA