Digitarium Mobile Planetarium Assembly and Disassembly Procedures Grunts Bob Law and Ken Mitchell Photos Barbara Mallon Assembled by Ken Mitchell Livermore.

Slides:



Advertisements
Similar presentations
Filter Changing Procedures For TEOM Series 1400ab and Model 8500 FDMS (B & C Types)
Advertisements

How to hook up a Projector to a Laptop
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Tripping over the USB cable and catching your lap-top just in time. You step over cables or need to hold the harness wires up high to pass under it.
Equipment for Assembly Fluke Multimeter 115 True RMS Glue Ring Jig Flathead screwdriver 60 Watt desk lamp HIOS Cl 4000 Electric screw driver Anti-static.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
This presentation is intended to assist you in troubleshooting basic problems that can occur with hardware and software. NOTE: This presentation contains.
Presenting A Power Point Program. Computer Checklist Computer Checklist Power Cord Mouse Computer.
So you want to do a presentation in the Council Chamber?? No problem, here’s how… Note: If you are using the laptop to conduct your presentation, either.
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
CricketSat Receiver Assembly Instructions This is the instruction slides for the assembly of a receiver board. It would be a good idea to review soldering.
CricketSat Assembly.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
1 Check all equipment is included before returning. If you have an accident or the equipment is damaged or you need support please contact Blaize
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Setting up and using an LED projector with computer & video input device MEDT 7477 Submitted by: Team 6 Has Slone.
 Power Cable-plug in when ready to project.  Audio/Video Cable- attach per directions on the next slide.  Mark your spot-you may wish to use tape on.
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
CricketSat LP (Transmitter) Assembly Instructions This is the instruction slides for the assembly of a transmitter board. This is the board that will fly.
Mark Butler Environmental Education Resource Teacher Curriculum & Instruction District School Board of Pasco County.
Portable/Desktop Projectors Small and light, ideal projectors for transports.
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
2008 Cadillac CTS With Original Antenna
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Building a Computer Kate Chapin Capstone Project.
CricketSat Receiver Assembly Manual Mike Fortney 06/26/2006.
Electrical Power Systems
Installation. Indoor Unit Installation Typical Installation.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Using your LCD Projector. Getting Started The cables and projector will come all together on a presentation cart Move the cart to a space where you can.
How to Change Windshield Wipers. Why is it that we never seem to remember to change our windshield wipers? You know you need 'em, you know they're cheap,
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Lesson 3 How to Construct Your Own Personal Computer.
Installation. Indoor Unit Installation Typical Installation.
PC Assemble & Disassemble Trey, Josh, Jin-young. Step1. Checking PC Before performing disassemble, make sure the PC is working properly.
Setting up the Ricoh C305 Press F5 to start the Presentation
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
Set Up for Live Streaming Video This presentation will walk you through the set up and delivery for streaming video of a live event over the internet.
Using the Projector and Interactive Whiteboard to Enhance Instruction Get Going with iProject Interactive - Out of the Box iProject Interactive Session.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Computer Disassembly and Reassembly Presentation by: James Hinton, Derrick Sartain, and Steve Evans.
Note to teacher: Use these slides along with the student handouts and guided notes on parts of a microscope, care & handling and how to use a microscope.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
Chapter 27 Restraint System Repairs. Objectives Explain the difference between an active and a passive restraint system Learn how to service seat belts.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Computer Bunker Training Most classrooms contain a bunker equipped with a computer with an integrated DVD player and an ELMO for your use.
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
Deconstructing a Hubsan and Rebuilding
Bilge Pump Service Project Model Service Kit
Computer Bunker Training
Focusing Questions How can we set up the projectors and interactive whiteboards in our classrooms? What are the different parts of the projector and.
Yeti 400 Reprogram SOP 5/1/2017, Yeti firmware rev. 2.0.
Step 1: Load paper Before you replace the ink cartridges and begin the alignment process, load paper in the printer. 1) Raise the input tray. 2) Remove.
2.2 Gallon TourTank Installation
The Microscope Parts of, Use, and Care.
Meeting In A Box Set Up Guide
Lab Cleanup Practices Following Experiments
HYBRID COOKTOP.
1/17/2019.
How to Perform Preventive Maintenance of the Personal Computer
Teacher training resource: Robotic Assembly
Fin & Countertop Sample Kit Instructions
Beginner Stander Presentation
Presentation transcript:

Digitarium Mobile Planetarium Assembly and Disassembly Procedures Grunts Bob Law and Ken Mitchell Photos Barbara Mallon Assembled by Ken Mitchell Livermore TOPScience Nov 1, 2008 With Control Box Version 3

Transport container with the C/P installed Two Controllers Parts Box Notebook goes here Projector Remote

System Components using the Control Box Dome Package Transport Container C/P Unit Auxiliary Lamp Fan Box & Fan Control Box Main Power Input Cable

Removing the C/P from the transport container White box contains speakers, pointers, and spare batteries

Two people should carry the C/P

Pick a good spot to set up the dome IMPORTANT Ensure that the floor is clean and that there is plenty of room on the floor and overhead

Remove the dome from the storage bag Remove the Dome from the large blue bag Be sure to replace the straps in the bag and zip it closed.

Spreading dome Spread the dome evenly on the floor

Ensure the inner liner is straight

Attach the center clip (with the yellow tie) to the top of the fan Finding the hook with the yellow tag

Hook with yellow attaches to top of the fan’s screen.

Ensure the inlet tube is completely over the fan’s screen and attach the other two clips Fan Switch

Plug the white surge suppressor into a wall plug Control Box and Cables Surge Protector plugs into wall outlet Black cables power the C/P unit Input Power Cable

Be sure the ‘KILL’ switch is in the Normal position. The pilot light should be on. Turn ‘Fan Speed’ full CW.

Plug the color coded fan and lamp cords into the back of the control box.

It should now look like this Speaker Power Converter plugs in here Plug the Fan and Auxiliary Lamp into the Control Box. Turn the Fan Switch on to Maximum to start Inflating the Dome.

This is the circuit diagram for inflating the dome Diagram of initial setup

The dome should start to inflate but be prepared to untangle the inlet tube if necessary

Inspect the dome to ensure even inflation Inspect the Dome to insure the inner and outer shells are snapped together.

Important Check that the fan doesn’t contact the dome and interfere with air flow

When the Dome is fully inflated, slide the control box and lamp under the side of the dome Be sure to turn the lamp on to full brightness before sliding it inside

Three Ways: Carry the C/P into the dome, Slide it under the Dome, or Put it under material before inflating

Preparing the C/P Unit This is normally done inside the Dome but is shown outside for clarity

Remove the two locking pins by pressing on the release buttons on the top of the “Tee” pin

Pull up the top handle to raise the C/P. Reinsert the two pins, using a light to help find the holes. This is easier if done with two people.

Orient the C/P so the arrow points toward the dome inlet tube. The expanded metal (air inlet) of the projector should face the air inlet to the Dome. The arrow helps you see to orient the unit properly in the Dome.

Attach the lamp to the frame by sliding it into its mating bracket. The lamp is controlled by the dimmer on the Control Box.

Connect the color coded power cords from the control box to the computer and projector. Cables from the Control Box plug into the C/P receptacles. The power switch for each is located next to the receptacle. Audio plug-in USB Ports Power input from Control Box Power Switch

Slide the Control Box under the upper components to give easy access to the controls. This shows the C/P extended and the Control Box located under the projector.

Carefully remove the foam collar and lens cap Remove and replace the lens protector straight up or down without twisting. Ready for the show!

Completed wiring looks like this System Assembled for Operation

Repackaging for Movement Refer to the User’s Guide for the proper shut down procedure for the C/P Unit to prevent damage to the projector bulb. After the C/P Unit is off and pinned in its lowered position, slide it out under the side of the Dome and stow it in the Transport Box. Be sure to put the weights away before beginning to deflate the Dome.

Alternative Take-Down Procedure from Inside To simplify preparing the Dome for folding after it’s down, work from the inside. This is also helpful if you have to package the Dome by yourself. Start with removal of the C/P unit by sliding it out under the side of the Dome to get it out of the way. Put the C/P unit in its transport box. Be sure the weights are put away. Start deflating the Dome from the inside by pulling one side inward about halfway across the base. Then quickly lift the opposite side up and over to complete the procedure. This will collapse the Dome into sort of a large “taco” shape, which is easier to straighten out for folding. This procedure also works best when space is limited as when working on a MPR stage or in a classroom.

Collapsing the dome Be sure to grasp the gray inner shell to overturn the Dome Just grabbing the outer shell will not collapse the dome properly Two Person Method of Take-Down

When both have hold of the inner liner, lift and walk briskly across the center to deflate the dome Be sure to avoid stepping on the Control Box or Lamp

Move Quickly While Gathering Material

Turn off the fan. Disconnect all cables. Put the fan in it’s storage box. Put the Control Box, flashlight, weights, and lamp in the red bag.

Folding The hardest part—getting the dome ready for storage in the bag Organizing the Dome for folding. Ideally, you want it to be in a form approaching that of a very large taco.

Working for a triangular shape for folding

Fan tube Zipper door Zipper Door Fan Inlet Tube

One person should hold the apex while another folds the sides. If working alone, use the weights to hold the apex in place.

Folds are about the length of the storage bag

Keep the inlet tube from twisting as you are folding the Dome – See the next slide

Prepare the Inlet Tube

Laying the fan inlet tube on the fold

Folding from the other side

Getting the air out of the material Just like rolling up a sleeping bag or tent

Almost done

Attach Straps

Will it fit?

Stuff

Ahhh, it fits and the zipper closes. DONE!