Steve Williams, P.E. | Brian Olsen, P.E.

Slides:



Advertisements
Similar presentations
Facilities Management and Design Chapter 4 Safety and Security systems.
Advertisements

Determining the Occupant Load
Fire-Resistive Construction (2nd part)
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
NFPA 96 and Building Code Requirements for Commercial Kitchen Hood Systems Presentation for the Sevier County Fire Code and Building Code Officials Presented.
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Basic Fire and Smoke Training Basic Fire and Smoke Actuators & Dampers.
FCIA CODE EFFORTS FCIA Spring Conference 2003 By William E. Koffel, P.E. Koffel Associates, Inc.
Basic Fire & Life Safety for Radiation Safety Professionals Robert Emery, DrPH, CHP, CIH, CSP, RBP, CHMM, CPP, ARM Vice President for Safety, Health, Environment,
Presented April 16, 2009 at the ACG Annual Meeting in Chicago, IL. GAYLON RICHARDSON Engineered Air Balance Co., Inc. Houston, Texas 5/7/20151.
Four Learning Objectives Understand Smoke Control Theory Understand Design Methods Know Your Role in Commissioning Tests Be Familiar with Hardware, Test.
N.F.P.A. 13R Justin Bohlmann FIR-204.
Elevators & Fire Alarm Systems: Understanding Interface Requirements Presented by: Antonio Torres- North Central Regional Sales Manager.
Emergency Lighting Code Review Presented by Iota Engineering LLC.
2007-CBC - UL Damper Requirements
State of Kuwait 3rd Intl Fire & Safety Conference & Expo 4-6 March 2014 Building Performance for Emergency Response Incident Examination and Tactical Response.
Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by.
Enclosure Fire Dynamics
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FIRE DESIGN OF BUILDINGS VULNERABLE GROUPS. COMPONENTS OF FIRE building materials unattended stoves Loose electrical connections overloaded electrical.
WELCOME DBI & SFFD Meet the Pros October 11, 2007.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
Unit 8: Portable Fire Extinguishers & Smoke Control Management Systems
Smoke Control Systems Introduction and Commissioning
Business Owners and Managers and the Fire Code
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
NFPA 31 Standard for the installation of Oil- Burning Equipment
© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
Improving smoke control and protecting lives Air Sealing Industrial, Commercial, Institutional and Multi-Family Buildings to Improve Smoke Control.
Code Analysis. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical.
Fire Safety By Alicia Civile and Alexandra Fernandez.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
MINNESOTA CHAPTER AUTOMATIC FIRE ALARM ASSOCIATION Requirements of the 2003 Minnesota State Fire Code relating to Group R Occupancies September 14, 2006.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Case Study Example using SFPE Guidelines for Substantiating a Fire Model for a Given Application Stephen M. Hill, P.E. Craig E. Hofmeister, P.E., LEED.
Area of Refuge It’s the Law!
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Southeast Financial Center
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
Work Area Method Level 3 Alterations – Chapter 9 prescribes requirements. 50% of Building Area Rule.
INTRODUCTION TO CONSTRUCTION TYPES Code Consultant:Steven R. Winkel, FAIA, PE The Preview Group, Inc. Contractor: Scott Smith.
Sprinkler Loads on Trusses Educational Presentation.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
3M B&CSD - Fire Protection Space for 3M Montage © 3M All Rights Reserved. 3M Fire Barrier Duct Wrap 615 For Ventilation Ducts.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
 The airborne solid and liquid particulates and gases evolved when a material undergoes pyrolysis or combustion. – NFPA 92A  Follows Path of Least Residence.
Southeast Financial Center
DoD Fuels Laboratory Standards UFC
Hazardous materials: What to look for
Maria’s Restaurant Chapter 3 Section 13
Proposed Changes to the 2009 International Building & Fire Codes
Fire Alarm Systems for Emergency Operations of Elevators
Wilson Hall Fire Protection Features
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Building and Fire Codes
Design of Evacuation System for High-Rise Building Danqing Yu
Presented by: Tim Knisely
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Presentation transcript:

Steve Williams, P.E. | Brian Olsen, P.E. An Overview of Building Fire and Smoke Control Systems Design and Commissioning presented to Arkansas ASHRAE – ASHRAE Chapter 62 by Steve Williams, P.E. | Brian Olsen, P.E.

Introduction - General Over 35 years of design experience Support staff of 350 Local Office Wide variety of project types #1 Retail firm in U.S. (based on number of projects and square footage Retail Construction Magazine-2006) Specialty division of Henderson Engineers, Inc. Staff of 30 fire protection professionals Nationwide exposure Significant fire alarm, suppression and code consulting experience HEI - Lowell HEI – Kansas City

Introduction – Presentation Overview Overview of Smoke Control Engineered Smoke Control Systems Stairwell Pressurization Atrium Smoke Evacuation Lobbies Malls Health Care Anesthetizing Locations

Introduction – What is Smoke Control Passive vs. Active Passive ‘Smoke Resistant Construction’ Smoke Barriers – 20 minute rated openings Active Pressurization Systems High-rise of old Healthcare Atrium Smoke Exhaust Exhaust Makeup Air Stair Towers

Introduction – Why Smoke Control Inhalation injury from smoke and the noxious products of combustion in fires may account for as many as 75% of fire-related deaths in the U.S. Key concept - minimize vertical smoke migration. Passive smoke control is known for poor maintenance. Unsealed penetrations, terminations, etc. Basic concept of Smoke Control is to allow occupants to reach a protected means of egress Fire Department Operations Tool (arguable purpose but fire departments will use it this way – fire fighters control panel) Architectural Design Flexibility Atlanta Marriot 47 Story Fire Example

Introduction – Smoke Development

Part 1 Codes – Applicable Codes/Guidelines 2003 International Building Code (IBC), Section 909 NFPA 101 – Life Safety Code NFPA 92A – Recommended Practice for Smoke Control Systems NFPA 92B – Guide for Smoke Management in Malls, Atria, and Large Areas ASHRAE 1999 HVAC Applications, Chapter 51 ASHRAE Principals of Smoke Management Handbook Authority Having Jurisdiction (AHJ) Building Inspector Fire Marshall-State and Local

Part 1 Codes – Where Required Atriums (IBC 404.4) Enclosed Malls meeting Atrium definition (IBC 402.9) High-rise Windowless Buildings – Prisons (IBC 408.8) Smoke Protected Seating (IBC 1024.6.2.1) Healthcare Stair Towers (IBC 1019.1.8) 75 ft above fire department access

Part 1 Codes – Where Required Atriums (2003 IBC 404.1.1/404.4) “Atrium. An opening connecting two or more stories other than enclosed stairways… [ lists all shaft scenarios]…, which is closed at the top and not defined as mall…” “404.4 Smoke Control. A smoke control system shall be installed in accordance with section 909.” Stair Towers (2003 IBC 1019.1.8) “1019.1.8 Smokeproof enclosures. … each of the exits of a building that serves stories where the floor surface is located more than 75-feet above the lowest level of fire department access or 30-feet below the level of exit discharge … shall be a smoke proof enclosure or pressurized stairway.”

Part 1 Codes – Smoke Control Methods IBC 909 does not specify a specific type of smoke control system. Options include: Pressurization .05-inches water gauge across smoke barriers Airflow Air Curtain Exhaust Atriums

Part 1 Codes – Exhaust Method Prescriptive Design 5 MW Steady State Heat Release 20 Minute Duration Performance Design Rational Analysis – 2006 IBC Times 1.5 X Egress Time Fire based on fuel load 1 MW at 7 Minutes 4.6 MW 260 Seconds

Part 1 Codes – Exhaust Method Prescriptive Design 5 MW Steady State Heat Release (IBC 909.9) Rather large for some scenarios 20 Minute Duration (IBC 909.4.6) 20 minute smoke barrier opening protection Tenability (IBC 909.8.1) 10-feet smoke interface 2003 IBC 6-feet smoke interface 2006 IBC Exhaust Capacity Axisymmetric Plume (IBC 909.8.2) Balcony Spill Plume (IBC 909.8.3) In calculations air density must be adjusted for elevation and smoke temperature. See ASHRAE Principals of Smoke Management Handbook

Part I Codes – Exhaust Method Air Movement Stratification Stack Effect Plugholling Makeup Air Natural or Mechanical 85% total exhaust is rule of thumb 200 fpm maximum velocity towards fire Distortion of smoke plume Introduce Below Smoke Layer

Part 1 Codes – Equipment Criteria UL Listings Fans Smoke Dampers Fire Alarm Control Panel BAS Fire Fighters Smoke Control Panel Fire Command Center? Equipment Temperature Ratings IBC 909.10.1 Initiation as required by Rational Analysis Sprinklers Manual Pull Stations Properly Zoned Sprinkler Waterflow Detection

Part 2 Design – Smoke Control Design Team Specialty Engineered System Multidiscipline Effort Architect MEF Authority Having Jurisdiction (AHJ)

Part 2 Design – Architectural Component Smoke Control Objective Aesthetics Automatic Door Hardware Owner/Team Communication Alternatives

Part 2 Design – Mechanical Engineering Component Makeup Air Configuration Exhaust Air Configuration

Part 2 Design – Mechanical Engineering Component Fan Specification (IBC 909.10.5) 1.5 X Belts Required for Design Duty Minimum 2 Belts Fan Temperature Ratings Duct Specifications (IBC 909.10.2) Withstand fire pressures and temperatures Field Tested to 1.5 X maximum design pressure Smoke Damper Approach Omit where air path is instrumental to system operation Fire Damper Approach Higher Temperature Heat Links BAS Positive Indication of Fan Status

Part 2 Design – Electrical Engineering Component Primary Power Secondary Power Dedicated Fire Resistant ATS/Secondary Power Room 60 Second Transfer Time (IBC 909.11) 15 minute duration UPS for volatile memory BAS (IBC 909.11.1).

Part 2 Design – Fire Protection Engineering Component Design Approach/Rational Analysis Design Fire Stack Effect/Hot Air Stratification Temperature/Wind Effect HVAC System Considerations Plugholling Duration of Operation (Egress Calculations)

Part 2 Design – Fire Protection Engineering Component Automatic Sprinkler System Zone Coordination Fire Alarm and Detection System Firefighters Smoke Control Panel Special Inspections

Part 2 Design – Authority Having Jurisdiction Component Interpretations Design Approval Acceptance Criteria

Part 3 Commissioning – General Why Commission Prove System Functionality Develop Benchmark for Future Testing Commissioning Concerns Outside Normal Services Educate Architects/Contractors/Owners Early Commissioning Team Owner Engineers AHJ Air Balance and Test Group

Part 3 Commissioning – Preparation Construction Completion/Partial Occupancy Inspection Component Level Testing Functionality Test Pre-test Test System as a Whole Final Acceptance Test Presence of AHJ Smoke Test if Required Early AHJ coordination can avoids this

Part 3 Commissioning – Smoke Testing Subjective - Smoke testing is extremely subjective although it will be required in many jurisdictions. NFPA 92A discusses smoke testing in detail. NFPA 92A (2002) Section A.5.3.3.6. speaks to the limited value of smoke testing. Hot/Cold Smoke Testing Limitations

Part 3 Commissioning – Smoke Testing (con’t) Smoke Bombs Superior Smoke Smoke Volume Discharge Time Smoke Generators Theatrical Units

Part 3 Commissioning – Air Balance Test Reports Air Balance Contractor Clear Scope Exhaust Fans Makeup Air Fans Makeup Air Inlets Capability to Adjust Equipment

Part 3 Commissioning – Initiation Fire Alarm Smoke Detection Manual Alarms Waterflow

Part 3 Commissioning – Initiation (con’t.) Fire Fighters Smoke Control Panel Status Indication Control

Part 3 Commissioning – Secondary Power Fans Controls Reboot

Questions? Thank you.