UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Debby Valin FDEP - Central District. What is P2 Why do P2 How to P2 Means to P2 Continuing with P2 P2 in Buildings P2 in Offices P2 in Operations and.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
1 LIGHTING. 2 LIGHTING 30% better-than-code is incredibly easy for lighting – the standards are lagging the industry revolution.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
CERT UPDATE TO GUILFORD COUNTY ENERGY AUDITS OF BELLE MEADE BUILDING BB&T BUILDING HIGH POINT COURTHOUSE & DETENTION CENTER HIGH POINT PUBLIC HEALTH BUILDING.
0 Energy & Climate Action Matthew Berbee Energy & LEED Manager John Onderdonk Manager for Sustainability Programs June 11, 2010.
Saving Energy and Reducing Costs in RI Hotels & Restaurants February 24, 2010.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
ENERGY EFFICIENCY FOR END USERS With a Case Study of Energy Progress at Rowan University AJL RESOURCES LLC – CLEAN ENERGY SYMPOSIUM.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES DCEO Energy & Recycling Office DCEO Trade Ally Events | December, 2014.
Franklin County Technical School Performance Contract Project.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES DCEO Energy & Recycling Office DCEO Trade Ally Events | December, 2014.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Toward a Sustainable Campus. Outline A. Global Sustainability Movement in Higher Education B. Resources C. What can be done? D. “Toward a Sustainable.
City of Dallas 2030 District Initiative April 24, 2015.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Performance Contracting The Honeywell One Source Solution.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
2 Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES Kate Tomford | DCEO Energy & Recycling Office DCEO Trade Ally Trade Show |
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
Alamo Colleges Energy Conservation Programs: Continuous Commissioning ® The Achieving the Dream Leader College designation recognizes an institution’s.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Steve Horseman – Grainger Industrial Supply, District Sales Manager for the State of Kansas The Four Corners of Sustainability.
Resource Conservation Program November 2003 Kelley Gonzales Resource Conservation Manager.
Name of Building(s) or Project Speaker(s) Organization(s)
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Marriott Corporate Headquarters
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Demand Side Energy Management & Conservation Lighting Retrofits The University of Texas at Austin.
Using Technology to Manage Energy Bob Schoch-Director of Business Administration Tom Schneider-Supervisor of Operations.
Energy Efficiency Solutions: Reduce Costs, Improve Infrastructure, Meet Environmental Goals Case Study: Towson University.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
Energy Conservation Building Upgrades Alma School District.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
The Energy Efficiency and Solar Nexus:
Robert Greenwald, P.Eng, MBA February 26, 2004
Sean Weber Energy Engineer
Welcome to the Colorado Restaurant Association Pikes Peak Chapter Energy Efficiency in the Restaurant Industry.
LED Savings and Simple Payback at the Music Building
Presentation transcript:

UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager

Outline Background Energy infrastructure tools Utility costs Energy conservation categories – Maintenance & operations – Energy purchasing – Facility renovations – New construction FY13 and beyond

Background Academic/Research Institution – 19,600 Students – ~2,700 Faculty and staff – 57 Buildings – 2.4 Million ft 2 – 230 Acres Infrastructure: District Cooling – Five chillers (8000 ton capacity) – Thermal tank (1.4 million gal.) – System volume (1.6 million gal.)

Infrastructure: Administrative Tools iShop Procurement – Enables procurement of material and labor for energy conservation and efficiency. TMA Work Order System – Cradle to grave tracking of facility assignments – e.g. Energy losses due to overcooling, overheating, & leaks

Infrastructure: Technical Tools Building Automation System – Remote monitoring, controlling, & scheduling of HVAC UTPA-wide. – Saves energy & person-hours, including overtime Utility Metering – To measure and track consumption, cost, etc. – Provided by utility and conducted in-house DO

UTPA Utility Costs ($) FY 2012 Total = $4.94 Million

UTPA Electricity Expenses (%)

Maintenance Practices Preventive Maintenance Filter replacement Coil cleaning Chiller tube brushing Lubrication Repair Water & air leaks Replace 1250 ton chiller#3 (1985) with new 2000 ton Mixing boxes with VAV’s Reuse/ Recycle Metals, lubricants, building materials, cardboard, paper, etc. Water Conservation Process water treatment Minimize scale & corrosion Other Water sprinklers - 75% Infrared imaging

UTPA Lighting Upgrades 19 buildings; 4 phases from Fy’10-13 Retrofits included more energy efficient fluorescent tubes and electronic ballasts Results – Increased illumination – Higher energy efficiency – Utility rebates ($158k) – $500k cost avoidance to date – In FY’13, expect to avoid 2 million kWh ($150k) – 2 to 4 year payback* Energy Efficient Fluorescent Light Fixture

Operating Practices District Cooling Produce chilled water at the proper conditions Deliver it to campus air handlers as necessary to support the university’s mission. Campus HVAC Equipment Set back operating parameters when not required e.g. increase space temperatures, ramp down VFD’s, modulate valves, etc. HVAC Scheduling Utilize BAS to schedule UTPA facilities based on university event scheduling software. Capitalize on unoccupied mode, after-hours, week-ends, and holidays. Other Turn off electrical equip/lighting when not in use. Demand response

Purchasing Practices Utility Contracts – Electricity & natural gas – Seek reliable supply of energy – Competitive procurement Include energy conservation and improved energy efficiency as procurement options – HVAC equipment – Dual technology motion sensors, dimmers, programmable lighting controls – electric and hybrid vehicles OV Energy Efficient Boiler

Facility Renovations FacilityDescription ASFC, HSHW Auditoriums, H&PE1, PHYS, & UCCF Upgraded from constant speed air handlers to higher efficiency ones tied to VFD’s. Replaced constant speed mixing boxes with VAV. Graphics/Visual Arts and CESS Same upgrades as above, including parking lot lighting & irrigation systems for landscaping. Replaced 400 ton chiller with 250 ton frictionless. Parking Lot Lighting Replaced 250 HPS lamps with LED technology

New Construction FacilityDescription Performing Arts Center Replacing 1969 facility with one that utilizes modern-day technology and ADA compliance Academic & Administrative Annex Addition Energy standards (e.g. energy savings light fixtures now incorporated into all lighting projects) Parking Lot Lighting New 334 car parking lot to have 63 LED fixtures

FY13 and Beyond Continuous improvement Continuous commissioning – Why? Building Automation System Console

Continuous Commissioning Continuous Commissioning is an ongoing process to: – Resolve operating problems – Improve comfort – Optimize energy use, and – Identify retrofits Optimizes performance for the way the building is currently being used.

Some items we hope to address Sensor calibration Overrides Malfunctioning valves Optimization of boiler & chiller sequencing Optimization of start/stop Correct damper and valve problems Optimization of cold-deck reset, duct static reset, HW supply temp, terminal box minimum flow Optimization of schedules Optimization of chiller sequencing Optimization of CHW pump control

Questions? Energy Efficient Chiller GO BRONCS! Variable Frequency Drive