LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER.

Slides:



Advertisements
Similar presentations
eQuest Quick Energy Simulation Tool
Advertisements

Technical Committees – the Brains of ASHRAE Section 1.0 — Fundamentals and General.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Make the most of your energy Head Office – Case Study.
Technology in Architecture Lecture 10 Mechanical Systems Lecture 10 Mechanical Systems.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Presented by Mohammad A. Al-Muaigel /10/2004 National Energy.
The Three Tiered Philosophy
Design, Analysis & Cost Development of a 220 Ton Geothermal HVAC System Albert A. Koenig, Ph.D. ARB/Geowell Systems
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Sustainable Hotel Design Group 5 Presentation 4 Demand/Supply Matching.
Chapter 5: Designing for Heating and Cooling 5.1 Organizing the problem a) Fenestration How much is optimum for the building? What should the form of the.
Passive Heating and Cooling
CEC Title Ron France – Leviton Introducing the Leviton T24 Design Guide.
Geothermal Heat Pump Case Study I Chiloquin Community Center: 16 vertical boreholes + water-water heat pump providing radiant floor heating and cooling.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
Sustainable IT at Stanford S T A N F O R D U N I V E R S I T Y S U S T A I N A B L E I T Page 1 Energy Efficiency Rebates & Sustainable IT Sustainable.
By: Team Supreme Megan, George, Cory and Corey.  Budget of $160,000  Enough room for family of four  No TVs  Net Zero Energy  Aesthetically Pleasing.
WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto.
Building your Energy Efficient New Home. Learning Objectives: The features of an energy efficient house How energy efficient homes are rated on the EnerGuide.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
Project 3 DS 413: Design Studio 413 May 9, 2010.
Greening Affordable Housing on a Budget or Where There's a Will, There's a Way.
ENERGY CONSERVATION BUILDING CODE – 2006 PRESENTATION BY VP GUPTA PRINCIPAL CHIEF ENGINEER (ELECTRICAL), BSNL CHENNAI.
Scott Cooper | May 20, 2014 Built Smart and New Construction.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Passive House Seminar for Professionals from the Building Sector
The Terry Thomas Sustainable and Ecological Architecure By: William Wenik.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Project 5 DS 413: Design Studio May 9, A: 1A: Site is near a residential area. 1B: 1B: Existing trees were considered when planning heating,
Name of Building(s) or Project Speaker(s) Organization(s)
Project Managers Guide to Energy and Water Efficiency Measures in University Buildings Energy Consortium Conference 8 th December 2006 MATTHEW EDIS Building.
INTD 51 the functions of illumination lighting can be a tremendous force in architectural, interior, and landscape design.
Lighting systems HVAC systems Lighting Equipment HVAC Equipment Miscellaneous loads Envelope Energy Conservation Measures (ECMs)
Phoenix Convention Center Phoenix, Arizona Integrative Design: Deep Energy Approach Track 6: Integrated Energy Session 5: Integration of the Energy Industry.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Predesign Conceptual Design Design Development Detailed Design & Documentation Construction Operations and Maintenance.
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Arc -552 | Thesis | Master in Architecture | 2015
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Low Energy Building Design Crit 2 – Group G Mandy Wardrop | Nichola Murray | Christopher Weir | Callum Maloney | Jonathan Donnard | Martin Choné.
A New Language Shining the Light on Passive Solar Features and Retrofit Possibilities.
NEC Historical Lighting Allowance  1959 Lighting allowance for Offices W / ft 2  1984 Lighting allowance for Offices reduced to 3.5 W / ft 2 
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 7: Lighting and daylighting.
ASSIGNMENT. Luanda, Angola Latitude: 8° 50' 18 S Longitude: 13° 14' 4 E.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 10: Modeling for ventilation and other energy-consuming equipment.
Year Production
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Introduction to Energy Management. Lesson 4 Determining the Loads on the HVAC System.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT PROJECT 10/DS 413/MAY 9, 2012.
The importance of process in high performance building design.
Edexcel BTEC Level 2 Diploma in Construction Influencing Factors Unit 3 Sustainability in the Construction Industry.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
Building Environmental Systems
SUBHRANGSU DEY AND PRIYANKA SHARMA
CERN Data Centre ‘Building 513 on the Meyrin Site’
Section 1.0 — Fundamentals and General
INTD409 Interior Environmental Technology Fall 2014/15
INTD409 Interior Environmental Technology Spring2016/17
Concept of Energy Efficiency
Introduction.
Technology in Architecture
Exploring Energy Management
Technical infrastructure Provisions
Presentation transcript:

LIBRARY INFRASTRUCTURE – A NEW PARADIGM

BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER PROPERTY COUNTER JOURNAL SECTION JOURNAL SECTION LENDING BOOKS AREA LENDING BOOKS AREA REFERENCE SECTION REFERENCE SECTION BOOK BANK BOOK BANK READING ROOM READING ROOM OFFICES SPACES FOR OFFICES SPACES FOR LIBRARIAN, DEPUTY LIBRARIAN LIBRARIAN, DEPUTY LIBRARIAN ACQUISITION AND TECHNICAL SECTION ACQUISITION AND TECHNICAL SECTION DOCUMENTATION CENTER DOCUMENTATION CENTER COMPUTER CENTER COMPUTER CENTER PARKING FOR 50 CARS AND 50 TWO WHEELERS PARKING FOR 50 CARS AND 50 TWO WHEELERS PROJECT: LIBRARY AND COMPUTER CENTRE LOCATION: Deen bandhu Chottu Ram University of Science and Technology, Murthal, Sonepat PLOT AREA: SQ.MT. Total Built up Area : 12,177 SQ.MT. PROJECT COST : Rs Crore

SITE PLAN GRASS PAVERS TO REDUCE HEAT ISLAND EFFECT TREES TO CREATE BUFFER FROM WEST SUN TREES TO CREATE BUFFER FROM WEST SUN TREES TO PROVIDE SHADE AND REDUCE HEAT ISLAND EFFECT EXISTING TREES CONSERVED EXISTING TREES CONSERVED EXISTING TREES CONSERVED CONVENTION CENTER LIBRARY / COMPUTER CENTER

EFFECTIVE DEPTH OF BUILDING FLOORS FOR OPTIMUM DAY LIGHT AND VIEWS N NATURALLY LIT FLOOR AREA : 80% EFFECTIVE DEPTH OF OPTIMUM DAY LIGHT AND VIEWS EFFECTIVE DEPTH OF OPTIMUM DAY LIGHT AND VIEWS GROUND FLOOR PLANFIRST FLOOR PLAN THIRD FLOOR PLAN SECOND FLOOR PLAN N N N NATURALLY LIT FLOOR AREA : 85% NATURALLY LIT FLOOR AREA : 80% NATURALLY LIT FLOOR AREA : 85%

High Efficiency Pumps High Efficiency AHUs, FCUs Heat Exchanger High Efficiency Chillers Reduced HVAC requirements Water Recycling & Conservation Reduced Lighting requirements Building Envelope design Sensors, Controls Daylighting High Performance Glazing Insulation Passive Systems High Efficiency Lamps, Ballasts, Luminaires Earth Air Tunnel Occupancy Load, Equipment Schedule Whole building energy optimization Reduced Energy requirements

EARTH AIR TUNNEL Earth air tunnel is a tunnel for the passage of calculated amount of air for the purpose of heating, ventilation and air conditioning of a space using natural heat of the earth four meter below earth surface. WHAT IS EARTH AIR TUNNEL :

FRONT VIEW

ATRIUM