Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.

Similar presentations


Presentation on theme: "Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting."— Presentation transcript:

1 Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting

2 Liberty Elementary: Location and Context

3

4 Responding to the Site: Existing and New Buildings

5 Liberty Elementary School Main Teaching Rooms and Spaces 4 Pre-kindergarten/Kindergarten Classrooms 15 Elementary Classrooms 7 Tutoring Rooms 3 Special Education Resource Rooms Extended Learning Areas Library Reading/Circulation Room Computer Lab Art Room Music Room The Program of Requirements: Cafeteria and Stage Gymnasium

6 South Elevation

7 East Elevation

8 North Elevation

9 West Elevation

10 Liberty Elementary School Main LEED Components Geothermal Heat Pump system for heating and cooling Bioswales for storm water treatment and retention 40% water use reduction; low flow and dual flush toilets Daylighting and views; daylight harvesting Light reflective pavement and roof Commissioning of building envelope and systems Regional and recycled materials Indoor air quality Currently striving for 64-66 points= LEED Gold Building “Green” 38% overall projected energy savings

11 Liberty Elementary: Preparing for the Future Building New It’s about kids & success in education.


Download ppt "Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting."

Similar presentations


Ads by Google