Worldwide Applied Systems Group 1 Comprehensive Comfort Solutions Trane’s Global ESCO Strategy Don Anderson Global Process Owner.

Slides:



Advertisements
Similar presentations
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Advertisements

Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Future Plans. Overview Biomass Update Climate Commitment Update ECM ESPC Dashboard Deferred Maintenance Supply Side Conservation.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
Jan Buijk Biogas Fuelled Cogeneration Systems.
Content of the Presentation
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
RETScreen® Energy Efficiency Projects
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
ENERGY SOURCES. ALTERNATIVE ENERGY SOURCES Geothermal Energy comfort… savings... environment.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Performance Contracting The Honeywell One Source Solution.
Renewable Technologies Available in Ireland Paul Kane.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
“Specializing in Operational Excellence” Outsourcing Is it right for you? Texas Technology Showcase Houston, Texas March 18, 2003 Integrated Process Solutions.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Total Energy Usage As A Measure of Building Performance 30% Building Energy Savings Through an Energy Lifecycle Approach to Building Construction, Retro-fitting,
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
CONFIDENTIAL AND PROPRIETARY Invenergy’s Views on Cogeneration Opportunities Presented to: April 30, 2015.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
1 Best Practices for Program Implementation: Lessons from the Geothermal Heat Pump Experience Harvesting Clean Energy Conference.
1 Tri-Gem Energy Group, Ltd. Beyond Traditional Approaches Energy Solutions Providing Innovative Solutions for all your energy needs.
Beyond Mandates, Does Green Pave the Way? Marlene Santos Vice President, Customer Service Florida Power & Light Company October 17, 2009.
Name of Building(s) or Project Speaker(s) Organization(s)
TEFMA Workshop - The University of Waikato Energy Performance Partnerships.
International Newspaper Group 2008 Gannett’s Green Campaign.
Marriott Corporate Headquarters
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Acquiring for your technology doesn’t need to be challenging…
RBC Supply Chain Solutions. Who we are ? RBC Sourcing provides e-procurement solutions through a unique blend of proven on-demand technologies, affordable.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
Leadership, the key to unlocking global markets A practical experience within SUEZ “Bringing you the essentials of life” Jean-Claude STEFFENS Sr VP Environment.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Energy Efficiency... Process vs. Program Tom Henry – Armstrong International, Inc. Henry Molise – Pfizer (retired)
A collection of short stories Energy Savings Performance Contracting.
E NERGY P ERFORMANCE C ONTRACTING : Financing Energy Performance Improvement Projects Patricia Gómez PE, CEM, LEED AP Office of Sustainability Miami-Dade.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
BB&T Capital Markets 10 th Annual Commercial & Industrial Investor Conference March 23, 2016.
Sustainability Summit – April 12, 2016 Beau Engman 825 North Jefferson, Suite 300 Milwaukee, WI 53202
Energy Conservation Building Upgrades Alma School District.
MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance.
Energy Partners Presentation to Pharmaceutical Industry Association June 13, 2008.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Stifel Nicolaus 2017 Industrials Conference June 15, 2017.
Long-Term Planning Presented by: APP Site Visit Don Untch
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
UMCP Learning Objectives
“Driving Down Construction and Operational Costs: How a GPO Does It”

Enron Energy Services Energy Management Outsourcing Overview
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
ADTRAN: The Network Access Company
HVAC consulting companies can improve your Building Essentials with HVAC Design & Build Solutions.
Presentation transcript:

Worldwide Applied Systems Group 1 Comprehensive Comfort Solutions Trane’s Global ESCO Strategy Don Anderson Global Process Owner

Worldwide Applied Systems Group 2 The Trane Company An American Standard Company World’s Largest Manufacturer Of Commercial Air Conditioning Products, Systems and HVAC Services Reputation for Quality and Industry Leadership Single-Source for Design, Service, Equipment, Installation, Financing, Operations and Maintenance of HVAC Comfort Solutions

Worldwide Applied Systems Group 3 Our Vision... The Premier “Comfort Systems and Solutions Provider” For the World.

Worldwide Applied Systems Group 4 Middle East/Africa/India (MAIR) Asia/Pacific (APZ) Latin America (LAR) Europe (EUR) USA/Canada (WASG / UPG) 210 Customer Solutions Centers 2000 Selling Associates 3800 Service Technicians

Worldwide Applied Systems Group 5 Market Changes The world is changing so fast that there are days when the person who says it can’t be done is interrupted by the person who is doing it.” - Anonymous

Worldwide Applied Systems Group 6 What is a Comprehensive Solution? Prime contract directly with owner to provide:  Broad Range of Facility Solutions  Often Focused on Energy Conservation  Typically Sold as a Financial Solution Many different types of contracts possible:  Turnkey/Design Build/GMP  Guaranteed Projects  Central Plant Agreements

Worldwide Applied Systems Group 7 COMMERCIALINSTITUTIONALINDUSTRIAL FACILITIES/BUILDINGS CENTRAL UTILITIES Offices, Corporate Headquarters, Manufacturing, Distribution Centers/Warehouses, Data Centers Steam, Hot Water, Chilled Water, Thermal Energy Storage, Compressed Air, Co-generation Combustion Inlet Cooling Universities/Colleges Healthcare Facilities Public and Private Hospitality/Recreational Manufacturing Distribution Design-Build- Own-Operate Design-Build-Finance Bringing Solutions to the Buildings Marketplace

Worldwide Applied Systems Group 8 Controls and Equipment Supplier Contract Operations and Technical Services Turn Key Projects PACT SM Projects Outsourcing Design & Manufacture Custom Equipment Trane Solutions

Worldwide Applied Systems Group 9  Equipment/system upgrades  Financial options  Regulation adherence  Single source responsibility  Outsource project management Controls and Equipment Supplier Contract Operations and Technical Services Turn Key Projects PACT SM Projects Outsourcing Design & Manufacture Custom Equipment Customer Benefits Turnkey

Worldwide Applied Systems Group 10 Trane Comprehensive Comfort Solution Trane Comprehensive Comfort Solution Trane Solutions Process Time and Cost Savings Traditional Design-Bid-Build Traditional Design-Bid-Build Pre-Construction Services Initial Design Basic Design Initial Design Detail Design Bid Construction Time & Dollars Saved GMP Established Final Cost Determined If project over budget-- Redesign and Re-bid Construction Detail Design

Worldwide Applied Systems Group 11 Some of the potential sub projects: Chiller Plant Optimization HVAC Energy Efficient Design Exhaust Fans and Pumping Systems Hot Water Heat Reclaim Systems Electrical Power Improvements Energy Efficient Lighting Building Automation and Controls. Gas Fired Boilers Building Envelope Service and Maintenance Optimization Code and Regulation Compliance (Energy Conservation Measures) Your Solution! Total System View of your Building

Worldwide Applied Systems Group 12 Turnkey benefits plus:  Financial options  Energy and operational savings  Defined cash flow  Flexibility  Guaranteed results Controls and Equipment Supplier Contract Operations and Technical Services Turn Key Projects PACT SM Projects Outsourcing Design & Manufacture Custom Equipment Customer Benefits: PACT SM Projects

Worldwide Applied Systems Group 13 Typical Scope of CCS Projects Mechanical Systems Retrofit/Optimization Electrical Systems Retrofit/Optimization Lighting Systems Retrofit/Optimization Building Envelope Improvements Energy Management Systems Operating Cost Optimization Code and Regulation Compliance Energy Purchase Options Trane Leverages Strategic Partnerships in “Non-Core” Competencies

Worldwide Applied Systems Group 14  Eliminates capital outlays  Reduce/eliminate operating costs; no operators required, no maintenance expense, no repair expense  Maintain regulatory compliance  Can include operation and maintenance of entire HVAC system Controls and Equipment Supplier Contract Operations and Technical Services Turn Key Projects PACT SM Projects Outsourcing Design & Manufacture Custom Equipment Customer Benefits: Outsourcing

Worldwide Applied Systems Group 15 Central Plant Solutions Central Plant Design Central Plant Construction Equipment Installation Ownership Of Central Plant Equipment Central Plant Operations, Maintenance & Repair

Worldwide Applied Systems Group 16 Fulfillment Alternatives Contract For Purchase Of Central Plant Services Trane Can Assume: –Utility Negotiations –Design/Build Project Delivery System –Off Balance Sheet Financing –Operations, Maintenance and Repairs –Integrated Approach

Worldwide Applied Systems Group 17 Turbine Inlet Cooling By The Trane Company Superior Performance Through Innovative Solutions

Worldwide Applied Systems Group 18 Turbine Inlet Cooling By The The Trane Company Installation Of A Turbine Inlet Air Pre-cooling System Increases System Performance 15 to 25% …by delivering consistent Inlet Air temperatures and by optimizing generator performance Turbine Inlet Cooling Can Contribute to Your Success By:  Reducing Operating Costs Per kWh  Increasing Generator Capacity  Improving System Competitiveness  Lowering System Emissions Per kWh  Delivering Consistent Service And Support

Worldwide Applied Systems Group 19 The Challenge: Increasing Generator Performance Aging Generating Equipment Deteriorating System Performance Squeezed Margins Rising Costs ä Labor Costs ä Escalating Fuel Rates Tightening Codes, Standards and Regulations

Worldwide Applied Systems Group 20 Critical Factors For Success Optimize Generator Performance Reduced Setup Times Effective Management Of Internal Resources Reliability-Centered Maintenance Programs Outsourcing Of Non Value-Added Activities Performance Based Financing Guaranteed Results

Worldwide Applied Systems Group 21 Letter Of Commitment Preliminary Study Introduction to CCS (PACT, Turnkey, Outsourcing) Detailed Study Final Proposal and Authorization Project Fulfillment CCS Project Acquisition Process SM

CCS Project Fulfillment Process

Worldwide Applied Systems Group 23 Our Commitment Act like a partner, not a vendor A partner that solves your problems rather than pushes our products A way to simplify managing your infrastructure Help reduce your time to market Someone who will not disappear once they install Solutions that will not become obsolete when your company grows A company that will grow with you in the global marketplace