Rampion Offshore Wind Farm Onshore Construction Elements.

Slides:



Advertisements
Similar presentations
Electrical Infrastructure Design Considerations David Flood Head of Electrical Systems, Forewind Stakeholder Workshops, April 2010.
Advertisements

A Path breaking Technology for Network Maintenance and Optimization
Econnect Ltd Independent specialists in the grid integration of renewable energy...
NER300 Offshore Wind Project Nordsee One (formerly Innogy Nordsee 1)
DOE Workshop Business Opportunities Available in Energy Sector 31August 2012 Act. Change. Power.
Managing Director, HVPD Ltd
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
Quantifying risk through a rigorous analytical approach to the real world challenge of offshore wind construction – downtime, constraints and sequencing.
SLIM® and Bio-SLIM® The “Life starts at 36”-project:
Some electrical connection design issues for offshore wind farms Paul Gardner, Helen Snodin, & Nigel Scott Garrad Hassan and Partners
Scroby Sands Offshore Wind Farm Update 18 April 2002 Anne-marie Coyle.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
UK’s First Commercial Scale Offshore Wind Farm 26th March 2003 NWP Offshore Ltd.
Challenges Presented by Brownfield Sites to Major Projects Berlin, Germany Annraoi Caffrey, ESBI Project Manager & Finbarr Quigley, ESBI Senior.
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Walney Extension offshore wind farm Meeting with the Planning Inspectorate Bristol 1 st March 2013.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Rampion 150kV Onshore Cable Connection Suppliers’ Day 11 th February 2015.
Rampion Meet the Buyer EventFebruary 2015 Rampion Project Update 1 Chris Tomlinson, Rampion Development Manager.
C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
Claire Gibson, Wave Hub General Manager 19 February 2013
Fair Head Tidal & West Islay Tidal An overview of the consenting process Fourth Annual HMRC Forum 24 th April 2013 Clodagh McGrath: Environmental Manager.
1 “Summary results of the comparative survey on the transposition of Directive 2009/81” Col. Paolo LIZZA IT MoD SGD-DNA Rome, 12 july 2011”
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Upgrade 138kV Underground Circuit From Polk to Garrott Substations ERCOT RPG Meeting January 13,
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.
Stephen Kerr Beatrice Offshore Windfarm. STW Offshore Wind Supply Chain 2 nd February 2010 Inverness.
Lessons Learnt from European Offshore Wind: 1999 to 2011 – a broad brush perspective Sebastian Chivers, Senior Vice President June 22, 2011 – Virginia.
GREENWAYS Connecting Communities November Greenways Plan 350 km planned Over 80 km built Construction of 4-5 km / year.
SUPPLY CHAIN EVENT GLENOUTHER RENEWABLE ENERGY PARK FENWICK HOTEL, 10 TH SEPT 2015.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
Dan Finch Moray Offshore Renewables Ltd. DELIVERING ROUND 3 Inverness 2nd February 2010 MORAY FIRTH OFFSHORE RENEWABLES Ltd.
Weddell Power Station unit three
FUTURE FOR OFFSHORE WIND ENERGY IN SPAIN Wind Energy Department
NAVITUS BAY UPDATE Sean Matthews Project Engineer 20 March 2013.
Main risks for Divers Noise Environmental Pollution Marine Craft Collision Diver Entanglement Dropped Objects.
Restricted © Siemens AG 2014 All rights reserved.siemens.com/answers Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference.
Rampion Meet the Buyer EventApril 2015 Rampion Project Update 1 Chris Tomlinson, Rampion Development Manager.
Rampion Wind Farm Supply Chain Project MEET THE BUYER EVENT 11 FEB 2015.
E-ON RAMPION OFFSHORE WIND FARM
EC&O – BUSINESS Business Benefit Due to OMNI. OMNI – Complete EC&O Solution What is EC&O stands for… Real Estate Developer Developer plus contractor Core.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
SME opportunities in the drive towards 2030 targets
Planning and Realisation of Wind Farms
YEL WIND POWER PROJECT. YEL WIND POWER PROJECT.
Wind Power development in Russia: Barriers and Constraints
POWERSYSTEMS 1977: Powersystems UK started up to provide services that only the local electricity board could provide at the time. We became the first.
Cathie Associates Offshore geoscience and geotechnical engineering consultancy An Introduction.
Renewables: Moy Wind Farm
Contract Award Procedures
Icebreaker Wind Supply Chain Open House
Rampion Offshore Wind Farm Meet the Buyer Onshore Substation
Innovation and Offshore Renewables
Pacific Power Seismic Preparedness Update
Clocaenog Forest Wind Farm Business Breakfast
The ISLES Project Bob Hanna
Grid integration and stability of 600MW windfarm at Kriegers Flak
Completing a Manure Management Plan Workshop
BRIEFING ON THE INTERCONNECTION LINES OF THE
Funder Preferred Risk Allocation
Blauwwind overview April 18th 2019 Sil Draaisma – Construction Manager
Grid Connection of the Anholt offshore Windfarm
Presentation transcript:

Rampion Offshore Wind Farm Onshore Construction Elements

1.Onshore construction elements 2.Onshore cable route 3.Indicative Cross Section 4.Summary Onshore Works 5.Constructing Approach and Programme 6.Lead Contracts 2

Onshore Construction Elements  Installation of connection assets at existing National Grid 400kV substation at Bolney  New build substation adjacent to existing substation  400kV underground cable connection between substations 3  27km underground cable route from connection point to landfall  Major HDDs along cable route sections

Onshore Cable Route  27km fully undergrounded route from landfall to substation  Two150kV circuits  Four major HDD crossings  Route crosses areas of challenging topography  Specialised installation methodologies for various sections 4

Onshore Cable Route Built up coastline restricts landfall options – Brooklands Pleasure Park 30m working corridor, 15m cable easement width Major exercise selecting and negotiating the route Sections routed through the South Downs National Park Railway / River Adur / A27 Geotechnical surveys completed in 2013 Contaminated land surveys at landfall location ongoing 5

Indicative cross section of the onshore cable route working width – two circuits 6

Summary of Onshore works  Significant cabling and substation works required to facilitate wind farm connection  2 year construction programme – will lead offshore construction  Ancillary and support opportunities in addition to main civil and electrical construction aspects  Experience on other projects suggest local sub-suppliers familiar with the area key enabler to successful execution 7

Contracting approach and programme E.ON preference for ‘hands on’ construction project management approach Multicontract rather than turnkey/EPC 14 lead contracts with E.ON Lead contractors subcontract tier of supply chain Update Prepared and issued tender documents for all our 14 lead contracts, except O&M base construction Currently in the tender process and still in negotiations Expect to award first contracts in early 2015 to enable first elements of onshore construction to commence as early as May

Lead contracts 9 PackageComment 1- WTG WTG supply installation and commissioning 2- MPI vessel Vessel charter for foundation/WTG installation 3- Foundation design Design of WTG foundations 4- Foundations Supply of WTG foundations 5- Vessel No. 2 Vessel charter for foundation/WTG installation 6- Array cable supply Inter-turbine cable supply 7- Array install Inter-turbine cable installation 8- Offshore substation platform Design and supply of offshore substation foundation and topside. 9- Export cable supply Offshore export cable supply 10- Export cable install Offshore export cable installation 11- Onshore cable EPC Onshore export cable supply and installation from landfall to onshore substation 12- Onshore HDDs Horizontal direction drills at traversing landfall and major obstacles along the onshore cable route. 13- Electrical substations Onshore substation and electrical equipment installed on the offshore substation 14- Grid unlicensed works Connection works within existing Bolney 400kV substation