Presentation is loading. Please wait.

Presentation is loading. Please wait.

Main risks for Divers Noise Environmental Pollution Marine Craft Collision Diver Entanglement Dropped Objects.

Similar presentations


Presentation on theme: "Main risks for Divers Noise Environmental Pollution Marine Craft Collision Diver Entanglement Dropped Objects."— Presentation transcript:

1

2

3

4

5

6 Main risks for Divers Noise Environmental Pollution Marine Craft Collision Diver Entanglement Dropped Objects

7 Diver safety Measures 500m Exclusion zones Around each vessel Guard boats monitoring Soft Start Piling 10% power start Max power over 30 mins Weekly Operations Notices courtney@brownmay.com Diving Media Notifications Local & national diver press Ports & marinas

8 Weekly Notice of Operations (WNoO) Rampion Offshore Wind Farm Limited Pre Construction Operations Issue Date: 17th February 2016 Weekly Notice of Operations

9 1) Notice to Mariners (NtM) (Active) All vessel masters to maintain a 500m safety zone around each vessel and keep a sharp lookout (Radar/AIS and visual) for non-project vessels entering these zones.

10 2) Project vessel details

11

12 3) Upcoming Operations (17 – 24 Feb 2016)

13 An advisory 500m exclusion zone is requested at all times around vessels.

14 4) Summary of operations (10 – 17 Feb 2016) Ongoing Boulder removal and UXO investigations infield when weather permitted. Ongoing Inshore /Offshore Export Cable route boulder clearance and UXO Investigations when weather permitted Ongoing Geaphysical surveys. Ongoing Foundation installation when weather permitted. 5) Looking Ahead. Windcat 16 will be joining the project. 6) Project Metmast details The current lattice structure has failed and will be replaced in due course.

15 7) Project Wave Riders A Triax Wave rider buoy has been deployed at the following Coordinates 8) As Laid Cardinal Buoy Positions AIS will be activated once weather permits.

16 10) Site Layout

17 Notice to Mariners Rampion Offshore Wind Farm Date of Issue: 20th February 2016 Notice Expires: Ongoing Rampion Offshore Wind Farm - Deployment of 3 x Wave Rider Buoys (Construction Period) This NTM supersedes and cancels NTM 0002

18 The Vessel MV Erica will sail from Littlehampton on the 26/02/16 (weather permitting) to install the 3 units at the Rampion Offshore Wind Farm site. The Buoys will remain in situe for the duration of the project (Please note the buoy will have to be re-located at some point in the future due to operations taking place in that area. This will be depicted in the Project Weekly Notice of Operations) Installation of Wave Rider Buoys

19 Deployment Location The wave rider highlighted below will be removed from site. Name Latitude Longitude ROW_Triaxys No1 50°40.293’N 000°20.076’W Wave Rider No1 50°45.405’N 000°12.903’W Wave Rider No2 50°40.203’N 000°20.076’W Wave Rider No3 50°39.137’N 000°19.543’W Installation of Wave Rider Buoys

20 Notice to Mariners Rampion Offshore Wind Farm Date of Issue: 22nd February 2016 Notice Expires: Until further Notice NB: This Notice closes out NTM 003

21 Summary: Weather permitting, the vessel ‘Sea Fox’ will sail from Shoreham on Tuesday 23/02/16 to install 5 x Tri- Pods containing Noise monitoring equipment within the Rampion Offshore Wind Farm site. The purpose of this equipment is to enable us to monitor noise levels during the first 5 pile installations, carried out by the MPI vessel ‘Discovery’. There will be 5 units deployed in total, 4 units adjacent to the piling activity at preset radii from the pile in question, with a 5th unit being placed approx.. 10km from each pile. The units will be deployed and recovered before and after each piling operation. Vessel Details: ‘Sea Fox’ Draught: 1.8m Length x Breadth: 22m x 10m Gross Tonnage: 112.5 Speed Recorded (Max / Average): 8.3 / 6.5 Knots Call Sign: 2GMJ7 MMSI: 235098651 Flag: United Kingdom (GB) Vessel Contact: +44(0) 7881753823 Deployment of Project Noise Monitoring Equipment on Seabed

22

23 The buoy is fitted with an amber flashing light, flashing 5 times at 0.5 Hz every 20 seconds. Deployment of Project Noise Monitoring Equipment on Seabed

24 Deployment Locations: Second Discovery installation cycle WTG Latitude Longitude Distance from Monopile (m) Direction I04 50°40.70317'N 0°19.95091'W 500 North I04 50°40.83529'N 0°19.99354'W 750 North I04 50°40.65321'N 0°18.20317'W 2000 East I04 50°40.86762'N 0°16.53955'W 4000 East J04 50°40.42116'N 0°20.43403'W 500 North J04 50°40.55184'N 0°20.48440'W 750 North J04 50°40.41608'N 0°18.68474'W 2000 East J04 50°40.67250'N 0°17.03585'W 4000 East F04 50°41.57912'N 0°18.49757'W 500 North F04 50°41.71123'N 0°18.53928'W 750 North F04 50°41.52877'N 0°16.74847'W 2000 East F04 50°41.74172'N 0°15.08345'W 4000 East Deployment Locations: Second Discovery installation cycle Location Fixed position for all Monitored Locations Above Lat Long 50°42.10884'N 0°12.14109'W Deployment of Project Noise Monitoring Equipment on Seabed


Download ppt "Main risks for Divers Noise Environmental Pollution Marine Craft Collision Diver Entanglement Dropped Objects."