EMODNet Lot 4 - Chemistry Overview, management and administrative issues Alessandra Giorgetti (OGS) with the contribution of Altenburger Alessandro, Brosich.

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

Project reporting in FP6 Guidance notes for Integrated Projects, Networks of Excellence, Specific Targeted Research Projects, Coordination Actions.
How can EMODNet Chemistry engage in support to MSFD data reporting Alessandra Giorgetti and Matteo Vinci (OGS) Nineteenth meeting of MODEG, 4-5 July 2013.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
Key issues in project reporting Jakub Rutkowski Project Annual meeting , Hannover.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
EMODnet Chemistry 2 3 rd Steering Committee Hotel Park, Split (Croatia), 20 June 2014.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
SeaDataNet, pan-European infrastructure for ocean and marine data management A key component of EMODNet A possible building block for GEOSS By Dick M.A.
MSFD Interactions EMODNET Chemistry 2 Kick-off meeting Giordano Giorgi Trieste (Italy), 3-5 June 2013.
EMD 2015 – Workshop 10 – Coastal Mapping 28/05/2015 European Maritime Day 2015 Workshop 10 Marine data and information powering Blue Growth Coastal Mapping:
EMODnet Chemistry 2 2 nd Steering Committee CNR, Piazzale Aldo Moro 7, Roma (Italy), Aula Golgi (2nd floor), January 2014.
This work is part of EQUITY ACTION which has received funding from the European Union, in the framework of the Health Programme.
Administrative issues, first year results and next schedule Alessandra Giorgetti, Lipizer Marina and Vinci Matteo EMODNet Chemistry – First year plenary.
The Preparatory Phase Proposal a first draft to be discussed.
The MyOcean Concept P.Bahurel, project coordinator.
EMODnet Chemistry 2: administrative issues, results and scheduling Alessandra Giorgetti, Lipizer Marina, Vinci Matteo, Alessandro Altenburger and Alberto.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
SeaDataNet2 Plenary meeting, 19th-20th September 2012, Rhodes SeaDataNet2 Plenary meeting THE EMODNET CHEMISTRY LOT. FROM THE EXPERIENCE OF THE THREE YEARS.
MARITIME AFFAIRS European Marine Observation and Data Network DG MAREBrussels21 September 2011 interim evaluation.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Emodnet Chemistry 2 Lot First Steering Committee Aula Magna Androna Baciocchi, Trieste university, 5th June 2013.
The European Marine Observation and Data Network IT Steering Committee 31 January 2013.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
EPOCA – 11. June EPOCAConsortiumOrganisation.
Design central EMODnet portal Objectives, Technical Proposal and Consultation Process.
MARITIME AFFAIRS European Marine Observation and Data Network DG MAREBrussels21 September 2011 interim evaluation.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Task 1. Project management and executive planning of activities Задание 1. Управление проектом и планирование выполнения работ М.А. Коробейникова Marina.
IIIrd SeaSearch Full Group Meeting Limassol, Cyprus Tuesday May 25-27, 2004 SeaDataNet-Design Study proposal.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
WP5: DATA MANAGEMENT AND DISTRIBUTION Overview and Status: months Caterina Fanara 1, Loic Petit De La.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator GRNET NA1: Project Administrative and Technical Management PSC07 Meeting, Zabljak,
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
From Emodnet Chemical Pilot to Emodnet Chemistry 2 Matteo Vinci and Alessandra Giorgetti, – OGS – NODC group, OCE - MODEG meeting, Copenhagen, 4 and 5.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
1 EMODNET pilot biological lot Francisco Hernandez, Simon Claus, Leen Vandepitte.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
EMODNET Preparatory Actions Progress meeting for ur-EMODNET preparatory actions, 24 November 2009 Presentation of Progress Chemical Lot Alessandra Giorgetti.
European Commission Virtual Institutes Workshop--28 September Thematic network contracts Megan Richards DG RTD Virtual Institutes  Thematic Network.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
Outcomes from EMODnet/MSFD coordination meetings A. Giorgetti, M. Lipizer, M. Vinci EMODnet Chemistry, 3 rd year meeting, June 8-9, 2016 Helsinki, Finland.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
EMODnet Chemistry 4° Steering Committee, Amsterdam QC inventory Matteo Vinci and Alessandra Giorgetti – OGS, Italy.
AMICI WP1 – Management, coordination and dissemination
The 6th Framework Programme
Management - coordination
Eurostat D2 – Regional Indicators and Geographical Information
Project Coordination Group (PCG) for the implementation of the MSFD
Draft Guidance Document (ERDF/ESF)
IHO-European Union Network Working Group (IENWG)
Design central EMODnet portal Objectives and Technical description Initial draft prepared by the Flanders Marine Institute.
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
The Learning Networks under the ESF
EMODnet Chemistry 3 Management and Coordination
EMODnet Chemistry 3 Project Management and Communication
How can EMODNet Chemistry engage in support to MSFD data reporting
Presentation transcript:

EMODNet Lot 4 - Chemistry Overview, management and administrative issues Alessandra Giorgetti (OGS) with the contribution of Altenburger Alessandro, Brosich Alberto, Lipizer Marina, Partescano Elena, Vinci Matteo EMODNet Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013

Summary EMODNet Chemistry 2 key elements and participants EMODNet Chemistry 2 overview EMODNet Chemistry 2 management EMODNet Chemistry 2 coordination Reporting to EU Administrative issues EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013

EMODNet Chemistry 2 - key elements Proposal submitted 10 th September partners + 14 subcontractors 35 countries represented Duration 3 years Budget 4 M€ Evaluation sent 4 th April 2013 with documents integration New documentary evidence sent 15 th May 2013 Waiting for EU Service Contract to be signed EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013

EMODNet Chemistry 2 - partnership Based on SeaDataNet network of NODC’s with Technical partners to further develop and run SDN infrastructure Specific expertise to coordinate data analyses and validation, and the creation of data products 32 partners 14 subcontractors

Objective: To build on what was achieved under preparatory actions; To deliver a marine observation infrastructure that offers the most effective support to the marine and maritime economy whilst supporting environmental protection needs. Specific objectives are: assemble existing data into interoperable formats develop, test, operate and maintain a portal for public access monitor and report on the effectiveness of the system in meeting the users needs and analyse what further steps are needed to improve the system keep the portal operational and be prepared to transfer to the EC EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 EMODNet Chemistry 2 - overview

6 service contract are funded by DG-MARE for creating pilot components of the European Marine Observation and Data Network: hydrography, marine geology, chemistry, biology, habitats maps, physics. Started in years EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 The preparatory actions:

Workplan of the project Technical Annex Executed in 3 phases: construction (months 1-12) consolidation (months 13-24) convergence (months 25-36) EMODNet Chemistry 2 – 6 workpackages EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013

EMODNet Chemistry 2 – workflow diagram

EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 Management: documents Service Contract - Consortium Agreement – Subcontracts

Project management EC service contract with coordinator (OGS) Consortium Agreement with all partners including: Technical Tender Form (Annex 3) Table with budget breakdown Banking references Subcontract with one-by-one all subcontractors including: Technical Tender Form (Annex 3) Banking references EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013

Project coordinator (=OGS) Technical coordinator (=MARIS) Project office (=OGS) Workpackage leaders (=OGS, MARIS, ISPRA, ICES) Regional leaders for products (=AU-DCE, IFREMER, SMHI, HNODC-HCMR, NIMRD) Steering committee: (=OGS, MARIS, AU-DCE, IFREMER, SMHI, HNODC-HCMR, NIMRD, ISPRA, ICES). Project Coordination Group (all partners and subcontractors) Management: structure EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013

Coordination: planned meetings GroupNumber of meetings Comment Coordination group4Kick-off + 3 annual meetings Steering committee7Every 6 months + final meeting MSFD experts and WG DIKE representatives 2M12 and M24 EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 The 7 thematic lots will meet with EU every 6 months to ensure convergence and collaboration between lots. The 7 thematic lots will meet with VLIZ and DG MARE to oversee development of an entry point portal. The 7 thematic lots will meet with WG-DIKE/MODEG to work collaboratively and support data access for MSFD assessment and monitoring.

Coordination: planned meetings EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 Any volunteer to host the first year plenary meeting?  Expected participants 70/80 people  Expected timing June/July 2014

Coordination: tools EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 Mailing lists: Website: updating previous EMODNet Chemistry pilot Extranet for the project: Restricted access (user: emduser, password: 91L07G207) All project documents including contract

Coordination: tools EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013

Deliverables: Bimonthly concise progress reports through phases 1 to 3 (from M2 to M36) First interim report after phase 1 (M12) Second interim report after phase 2 (M24) Draft final report 2 months before the end of phase 3 (M34) Final report at the end of phase 3 (M36) 15-page executive summary that can be read by a non- specialist Reporting to EU: planning EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013

The bimonthly concise progress reports will be posted on the Maritime Forum, indicating meetings held, difficulties encountered, inventories of data made available (from M2) Interim and final reports have to be sent to EC for approval and payments, including summary of work done and what remains to be done, challenged faced, effort spent on data preparing and providing, developing standards (M12, M24, M34, M36) EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 Reporting to EU

EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 Administrative issues

At the end of each period, the activity report and the relevant invoices have to be sent to EC by OGS After payment approval by EC, the relevant invoices or debit note or other official document have to be sent to OGS by all the partners and subcontractors EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 Administrative issues

…the Commission may decide to impose liquidated damages per calendar day of delay according to the following formula: 0.3x(Volume/duration)=0.3x(3,999,999/1095)=1095,89 euro …such amount will be charged in proportion between all partners and subcontractors. It is much important to keep the scheduled date! EMODNET Lot 4 - Chemistry Kick-off meeting, 3-4 June 2013 Administrative issues: liquidated damages