Edward Downer Elementary School Playfield Renovation Status Update 06/10/14.

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects May 2009.
Advertisements

Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Update on FCPS Construction/Renovation Projects April 2009.
WCCUSD Bond Program Construction Update
Edward Downer Elementary School Playfield Renovation Status Update 10/14/14.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Coronado Elementary School Project Status Update 05/13/14.
Update on FCPS Construction/Renovation Projects August 2009.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
WCCUSD Bond Program Project Status Report
Arlington Elementary – Renovation Architect: RossTarrant Architects General Contractor: W/S Construction Substantial Completion Date:August, 2010 Contract.
Impact of 30 day hold Cedar Conversion to Elementary.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
SNIKLE Site Contractors Kylan Fitzpatrick Evan Kosmac Lane Nelson Dustin Osterhout Clint Poole Amy Unger.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Working with 3D Models in Design & Construction Panel Discussion 1.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
2011 Raze & Removal Pilot The WisDOT Northeast Region embarked on a new raze and removal process on a project in Sheboygan & Fond du Lac. It’s purpose.
Introduction to Construction General Permit Inspections.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
College Station ISD Planning for Growth December 12, 2006.
Mary Lin Elementary School 586 Candler Park Drive Phasing Plan March 25, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Working Successfully With Property Managers: An Interactive Engagement
The art and act of creating indoor spaces that are FUNCTIONAL & EYE-CATCHING! FORM FOLLOWS FUNCTION.
PROPERTY MANAGEMENT RAZE & REMOVAL. PROPERTY OWNER HAS FIRST RIGHT OF REFUSAL n The property owner has first right of refusal to retain and move their.
March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)
Update on FCPS Construction/Renovation Projects March 2009.
Example NAMEROLE Ron LilleyProject Manager ???Project Inspector ????County Planner ????Zoning Inspector HBACivil Engineer ????Architect ????Mechanical.
F ACILITIES, P LANNING, AND C ONSTRUCTION April 14, 2014 Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Louisiana Department of Transportation and Development La. DOTD Cash Flow Tool Charles Nickel, P.E. Cost Estimate & VE Director (225)
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
Norris Public School District Outdoor Activity Facility Planning Report August 16, 2012.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Filter Rehabilitation and Seismic Upgrades – Construction Update
Bond Oversight Committee
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
Bond Oversight Committee
Boardwalk Improvement Project
General Road Construction Information
Architecture, Interior and Project management consultant
Construction Documents
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT March 2017 Fast Facts
HHS Freshman Academy Update
FACILITIES, PLANNING, AND CONSTRUCTION
Brencal Contractors Inc.
Harding Elementary School, Ellerhorst Elementary School, and
Lafayette New Terminal Program Update
Rucker Elementary School
Value Engineering In Design
Huntsville High School Softball Program Upgrades
Huntsville High School Sports Lighting Upgrades
Lafayette New Terminal Program Update
Things You Need to Know about Underground Utility Contractors Dalton GA.
Presentation transcript:

Edward Downer Elementary School Playfield Renovation Status Update 06/10/14

Construction Manager:Gabriel Fortich (SGI) Project Engineer:Shawn Fitzgibbons (SGI) Inspector of Record:Man Wah Cheng Architect of Record:Rod Sepulvida (BCA Architects) General Contractor: Maggiora & Ghilotti, Inc.

DEMOLITION OF EXISTING ASPHALT PAVING AND MISCELLANEOUS ITEMS TO BUILD A NEW GRASS FIELD INCLUDING ROUGH AND FINISH SITE GRADING, IRRIGATION, PLANTING, AND FIELD DRAINAGE. ELECTRICAL SCOPE CONSISTING OF POWER AND DATA CONNECTION TO NEW IRRIGATION CONTROLLER AND PROVISION OF CONDUIT AND FULL BOXES FOR FUTURE LOW VOLTAGE SYSTEMS.

 Project Duration:180 (Calendar Days)  Notice To Proceed Date: May 19, 2014  Completion Date:Nov 15, 2014  Percent Complete: 18%  Base Contract Amount:$563,226.00

Site Demolition

Clear and Grubbing

Utility Trenching

Electrical and Signal Conduit

Sub-Grade Preparation