Presentation is loading. Please wait.

Presentation is loading. Please wait.

Boardwalk Improvement Project

Similar presentations


Presentation on theme: "Boardwalk Improvement Project"— Presentation transcript:

1 Boardwalk Improvement Project
Status Update: 13JAN14 By Ethan Crouch

2

3 Background Contract Award Date: 12AUG14
Prime Contractor: Civil Works Construction Award Amount: $991,536.00 Notice To Proceed: 06OCT14 Contract Completion Date: 13FEB14 Note only DIV A (replace existing) awarded, DIV B (northern extension) not awarded.

4 Boardwalk Improvements
Project Overview G F&5 E&4 D&3 H&6 Boardwalk Improvements

5 Project Overview Highlights
New boardwalk double the width of previous boardwalk New beach accesses double width & handicap accessible Additional beach access 4 Trellises & Shade Structures 3 Gazebos Additional walkway to stage/band stand New decking and added a roof to stage/band stand Foot Wash at each beach access Replace showers & add new shower area Lighting on handrails & replace overhead lighting Expanded alcoves for pedestrian access and recreation areas

6 Current Status of Construction
Mobilized Project Site Initial Grading Complete Demolition Complete Bulk of Lumber Material & Hardware Onsite Piling Installation Underway Structural Framing Underway Decking Underway Handrail Underway Stage/Band Stand – Decking Replaced & Roof Framing Complete

7

8 Current Status of Construction Boardwalk Improvements Work in Place
Open to Public Open to Public Temp Sand Walkway G F&5 E&4 D&3 H&6 Decking Complete Piling Complete Status As of: 01JAN15 Boardwalk Improvements Work in Place

9 Next Steps Demo landscaping northern section
Fine grading northern section Piling installation northern section Structural framing & decking northern section Start Electrical Rough-In Start Plumbing Rough-In Metal Roof for stage

10 Questions


Download ppt "Boardwalk Improvement Project"

Similar presentations


Ads by Google