6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.

Slides:



Advertisements
Similar presentations
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
Advertisements

Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
EXL/R3B Calorimeters- Readout from ASIC to DAQ Ian Lazarus STFC Daresbury Laboratory.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
5 Feb 2002Electronics changes1 Possible changes to electronics Paul Dauncey Imperial College Some ideas on iterations to the design: Reduce number of uplinks?
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
ECFA Sep 2004Paul Dauncey - ECAL DAQ1 Thoughts on Si-W ECAL DAQ Paul Dauncey For the Imperial/UCL groups D. Bowerman, J. Butterworth, P. Dauncey,
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
1 Sept 2005Paul Dauncey1 MAPS award and issues Paul Dauncey Imperial College London.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
21-Aug-06DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver Long baseline neutrino experiment Fermilab (Chicago)
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
DAQ for 4-th DC S.Popescu. Introduction We have to define DAQ chapter of the DOD for the following detectors –Vertex detector –TPC –Calorimeter –Muon.
1 FADC Boards for JPARC-K Preliminary Proposal Mircea Bogdan November 16, 2006.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Vertex 2005, Nikko Manfred Pernicka, HEPHY Vienna 1.
25 Feb 2005Paul Dauncey1 TB Review: DAQ Paul Dauncey Imperial College London For Imperial, RAL, UCL.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
CLAS12 Trigger System part1: Level1 EC Revision 1, Feb 7, 2007.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Configuration and local monitoring
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
APV Readout Controllers DAQ
CMS EMU TRIGGER ELECTRONICS
CMS Preshower: Startup procedures: Reconstruction & calibration
CDR Project Summary and Issues
A First Look J. Pilcher 12-Mar-2004
Electronics for the E-CAL physics prototype
VELO readout On detector electronics Off detector electronics to DAQ
Example of DAQ Trigger issues for the SoLID experiment
UK ECAL Hardware Status
BESIII EMC electronics
Trigger issues for the CALICE beam test
The CMS Tracking Readout and Front End Driver Testing
August 19th 2013 Alexandre Camsonne
Presentation transcript:

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions

6 Mar 2002Readout electronics2 Real system I assume the final TESLA calorimeter will have: A total of 32 million channels –Ignor possible reduction in layers for now. Analog preamplifier for every channel –I see no alternative to this; presumably will be in an ASIC. Digital readout via fibre-optic cables –Need 15 bit range, 10 bit resolution; not easy using analog fibre system. Assume digital for now.

6 Mar 2002Readout electronics3 Requirements Looking at both 500 GeV and 800 GeV running: Maximum number of bunches per train ~5k. 500 GeV, 800 GeV Minimum bunch spacing 176 ns – GeV, GeV Total time ~1 ms in both cases – GeV, GeV

6 Mar 2002Readout electronics4 Cosmics HCAL requires cosmic data between trains: Not defined how this will be done Assume data readout within ~10 ms Do multiple “faked” trains before next real train – GeV, GeV allows 10’s of fake trains to be read out per real train ~1 ms live-time every ~10 ms –~10% efficiency; sufficient?

6 Mar 2002Readout electronics5 Data volume Noise dominates rate above threshold Assume ~3  cut so ~0.1% readout, i.e. 32k channels per sample, or 160M per bunch train. Physics rate low; ~10’s physics events per train. Even at 100 showers of 1000 channels each per event, this is small compared with the noise. With 4 bytes/channel, this is ~700 MBytes per bunch train (real or fake) –Physics event data lower by factor ~100. –Cosmics data lower by factor ~10 6

6 Mar 2002Readout electronics6 Data volume (2) Using Gbit links, i.e. ~100 MBytes/s, this needs ~700 links total. –~10 per detector module; sounds feasible Each link serves ~50k channels and moves ~1 MByte.

6 Mar 2002Readout electronics7 On detector tasks On detector, need to do three things: “Digitise” - digitise data. “Cut” - remove data below threshold. “Buffer” - save data during the bunch train. Six permutations of the order of these: Most make sense (but vary in cost) Original idea: digitise, (buffer), cut, buffer –Otherwise need analog threshold and buffer

6 Mar 2002Readout electronics8 Can cut be done on analog data? Unfeasible to have threshold voltage per channel Need uniformity across ASIC (128 channels?) –Pedestal and gain; to what level? 1%? 10%? If not possible, must digitise first –Buffer can be before or after digitise If possible, only one sensible arrangement –Cut, buffer, digitise

6 Mar 2002Readout electronics9 Assume no cut on analog data Digitise before buffer; assume ~10 ns required for analog multiplex settling –16 channels per (F)ADC (~100 MHz) –Total of 2M FADC’s needed Digitise after buffer; assume digitise and cut done as part of readout –Need 5k deep analog pipeline –Can take 10 ms, not 1 ms; 160 channels per FADC –Total of 200k FADC’s needed

6 Mar 2002Readout electronics10 Assume cut on analog data Cut and store analog data –Short analog pipeline; ~5 samples on average, maximum ~100 samples? (NB CMS APV25 has 192-sample analog pipeline) Total data rate down by factor 1000 –Need 160 FADC’s for average, i.e. 200k channels per FADC –Fluctuations; more like 10k channels per FADC so 3000 FADC’s.

6 Mar 2002Readout electronics11 What we now expect Each VFE chip will handle 18 channels All 18 will be multiplexed onto a single line at 1 MHz (may be speeded up to 5 MHz). Each row of diodes takes 6 VFE chips, mounted on the PCB holding the diodes. The VFE chip has single gain, so need ADC’s with at least 12 bits, preferably 14. Pre-amp peaking time will be ~150 ns, so a trigger is needed within this time.

6 Mar 2002Readout electronics12 Simplest system 15 6U cards in a VME crate –Each covers 2 layers. Each card handles 36 VFE chips –Total is 540 chips. Use one ADC per VFE chip –14 or 16 bit? Cost ~ £20/chip, gives ~ £11k total Signals to/from PCB’s using twisted pair cables, around 100 pins. –Analog, multiplex clock, calibration signals

6 Mar 2002Readout electronics13 Simplest system (2) No data suppression in hardware –Total data volume per event is 2 bytes x 9720 channels = 19 kBytes. –This is ~1 kByte/card so can just use FPGA VME readout of 19 kBytes ~ 1ms –Limited to < 1 kHz, realistically < 500 Hz Rough cost; must be < £50k –ADC’s = £15k, FPGA’s = £5k, PCB’s = £10k, crate = £5k, PC/PCI interface/disks = £10k

6 Mar 2002Readout electronics14 Questions How to do trigger distribution and handling? –Should multiplex clock be generated in hardware on the cards? CPU then just polls for data –HCAL may need trigger within 20 ns! Calibration signal distribution and handling? –Externally generated by FCT? –Timing of trigger after pulse? Just use NIM crate for the above? Do we expand system to include HCAL? –I don’t know what this would entail...