Future Plans. Overview Biomass Update Climate Commitment Update ECM ESPC Dashboard Deferred Maintenance Supply Side Conservation.

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
Cogeneration Facility The University of North Carolina at Chapel Hill Cogeneration Systems Energy Services Department Phil Barner- Cogeneration Systems.
Cogeneration Facility Overview Energy Services
Worldwide Applied Systems Group 1 Comprehensive Comfort Solutions Trane’s Global ESCO Strategy Don Anderson Global Process Owner.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Franklin County Technical School Performance Contract Project.
Economic Realities for Sustainable Real Estate Green Retrofit Lending 34 th Annual Real Estate & Economics Symposium Fisher Center for Real Estate & Urban.
RETScreen® Energy Efficiency Projects
Performance Contracting The Honeywell One Source Solution.
Energy Conservation & Performance Contracting
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Eastern Illinois University Energy Conservation and Sustainability Program December 11, 2007 Lt. Governor Pat Quinn Sustainable Government Symposium IDNR,
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Energy Management 101 Lance Stewart Facilities Maintenance Manager/Energy Manager City of Charlottesville, Virginia.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
GREATER LAWRENCE SANITARY DISTRICT ENERGY EFFICIENCY PROGRAM.
UAF research leads to inventions Invention Disclosures by Year.
Green Schools How to Save Money and Improve the Learning Environment Power Point at
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Jagadhri Brass and Aluminum Industries Cluster Jagadhri, Haryana State.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
The Essential Energy Savings Performance Contracting Program Design South Carolina ESC November 29, 2012 Presented by: Jim Ploger.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Net-Zero Rubenstein 5% Energy Reduction Goal Main campus electricity is supplied by the Burlington Electric Department (BED). Nuclear energy, which comprised.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Cogeneration Facility Overview. History Joshua Walker Gore ( ) and Gore Building at Cogeneration Facility Came to Chapel Hill in 1882, taught.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
E NERGY P ERFORMANCE C ONTRACTING : Financing Energy Performance Improvement Projects Patricia Gómez PE, CEM, LEED AP Office of Sustainability Miami-Dade.
Cogeneration Facility
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Cogeneration at UC March 09, Welcome Central Utility Plant.
T own-Wide Energy Performance Contracting to Finance Infrastructure Improvements 1.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Ontario SMART GREEN Program. Program Overview  SMART Green is a program funded by the Ontario Government to drive competiveness, energy efficiency and.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Robert Greenwald, P.Eng, MBA February 26, 2004
January 12, 2017.
Fort Stanwix National Monument Energy Audit Contract
Energy Savings Performance Contracts & Energy Service Companies
Seminar On Energy Audit Submitted To: Submitted By:
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
UMCP Learning Objectives
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
ESCO Project 5 – Lab Building Upgrades
Michigan Energy Summit | April 25, 2019
Presentation transcript:

Future Plans

Overview Biomass Update Climate Commitment Update ECM ESPC Dashboard Deferred Maintenance Supply Side Conservation

Biomass Update August 9 – received bids for test fuel Carolina Wood Pellets selected 520 tons purchased August 31-September 1 – 20 tons to be delivered Plan to burn the week after receipt Demonstrate suitability of feeding the fuel through the existing coal handling and fuel feeding systems Boiler maintenance outage Document interior condition Install test ports Install test ports and a fire detection/supression system in ductwork going to the baghouse Optimize combustion fuel and air to optimize efficiency

Biomass Update Early November – additional 500 tons delivered Test burn, expected to take 2 weeks Vary fuel flow percentage of biomass Collect extensive test data at various load points on the boiler Measure efficiency and performance Understand boiler operating characteristics when cofiring Measure stack gas emissions Spring 2011 – Potential torrified wood test, dependent upon availability

Climate Commitment Update 120,000 metric ton reduction, back to 2003 level From 30.6 to 24.6 total emissions per square foot

ECM Success Funds spent = $212,222 Annualized savings = $5-6 million Equivalent to $68 million investment by ESCO

ECM Plans $200,000 annual budget Remaining T12 lighting, survey and preliminary design for Kenan Center Ductwork modifications in Global Education and Chapman Matching portion of $865,843 in ARRA projects for lighting and HVAC $100,000 supplemental (potential) Steam trap survey and replacement HVAC controls Wilson Library Variable speed drives Phillips and Beard Preliminary design, heat recovery, MBRB

State Utility Appropriation ($) “ Baseline ” UNC Debt Obligation Construction Loan to ESPC 2 - year average utility costs 2 - year average utility costs Contract Years New “Baseline” ESCO Guarantee Payment (if needed) (typical) Project Savings (Project Value) Project Savings (Project Value) ESPC

Process (Two Years) Measurement and Verification (Life of Project) Annual certified audits of savings UNC obligated for proper operation ESCO refunds savings shortfall Construction (12 months) Fast paced to begin realized savings and make first bond payment Final Contract Termination possible if owner pays ESCO costs ($ k) Investment Grade Audit (6-8 months) Detailed analysis of all measuresSavings within 10% of proposalCost limited to 150% of proposal ESCO Selection (4 months) Bidders provide detailed cost proposalsBest overall value selection Application to SEO Buildings defined Costs estimated

ESPC Preliminary Building Screening Campus Appropriated (130) > $2.50/ft 2 (55) > $200,000 Utility Cost (35) Stable Program (26 +/-)

ESPC 26 Candidate Buildings 2,747,588 square feet $14, utility costs (variable only) $37,641,979 limit on performance contract (12 years, 30%) 20 of the Candidate Buildings were in the ECM Program 2, 213,810 square feet $11,808,301 utility costs (variable only) ECM project savings averaged 23% (range = 0% to 59%) While ESPC offers little near-term benefit and we have other opportunities for low cost improvements that are outperforming ESPC investments, we have underlying capital needs could be addressed by ESPC

ESPC Plan Fall 2010 – invite ESCOs to quantify remaining savings post-ECM Winter 2010 – Finalize candidate buildings +/- 5 buildings in initial RFP $5 -$15 million contract value Initial focus ECM tuned buildings within 1 year of new baseline data Building automation system control upgrades Laboratory ventilation optimization Dedicated outdoor air systems Heat recovery systems

Dashboard Decided to reject all bids – too expensive Agreement with Computer Science to write the system in conjunction with current Energy Services applications programmers Supervised by Prof. Diane Pozefsky Master’s students Schedule Prototype by end of Fall 2010 Beta version by end of Spring 2011 System live by Fall 2011

Deferred Maintenance $645 million backlog $230 million is HVAC (2nd largest category is $57 million) HVAC replacement normally must be completed as part of a comprehensive renovation, has been low priority because it requires relocation of building occupants Divided workload into three groups Demolish Comprehensive renovation Component replacement

Deferred Maintenance Developing funding plan Working on identifying new resources Projects in annual R&R allocation Phillips Hall Lineberger Cancer Center Need More R&R funding overall at state level Different allocation methodology at the state level Need State of North Carolina to provide deferred maintenance capital infusion - $250 million range (received $515 in 2000 Higher Education Bond funding)

Supply Side Initiatives Total avoided cost to date = $1.3 million, to date in avoided costs = $282,460 Chilled Water Systems

Supply Side Initiatives Chilled Water Systems Increase production efficiencies 33% efficiency increase at Cobb Chiller Plant Installing a plate and frame heat exchanger at the Tomkins Center in Rebuilding North Chiller Plant, will be most the efficient plant at the end of project Goal to increase chiller efficiencies by more than 1/3 District energy plant in the Imaging Research Building using heat recovery chillers Recover heat from chilled water system Use to produce hot water for building use

Supply Side Initiatives Cogeneration Systems 7% reduction in thermal losses in steam distribution system Reduced average condensing rate Replaced VFDs on boilers Optimizing combustion of fluidized bed boiler Reducing auxiliary energy usage by 10% Electric Distribution Systems Landfill gas project under construction in 2011 to supply electricity to Carolina North

Questions?