Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.

Similar presentations


Presentation on theme: "Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School."— Presentation transcript:

1 Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School

2 Industrial Heating & Piping Co. Madawaska Town Meeting Heating Project Special meeting February 16 th, 2011 Introductions Todd Leroy, Superintendent, Madawaska School Department Mike McCormick, Owner, McCormick Facilities Management, Construction Manager for this project Maynard Pelletier, President, Industrial Heating & Piping, Prime Contractor for this project

3 Industrial Heating & Piping Co. Organizational structure for our “team approach” Todd LeRoy School Superintendent (Primary school contact) Mike McCormick Construction Manager (overall project responsibility) Maynard Pelletier General Contractor (mechanical installation and sub trades management)

4 Industrial Heating & Piping Co. Role of our team members Mike McCormick will meet with your Board committee Discuss what you would like to do in this project Long-term building goals Energy conservation Alternative/Renewable opportunities Financing the project Operations and Maintenance goals Review previous studies and efforts

5 Industrial Heating & Piping Co. Role of our team members Industrial Heating & Piping will be instrumental to the ultimate success of this project They will: work with the committee and CM to obtain an understanding of the desired outcomes investigate existing project conditions within the building perform the construction and manage sub trades Condensate return tank steam escaping

6 Industrial Heating & Piping Co. We are a team specifically assembled to best serve the districts interests We aspire to make this YOUR project We are here to assist and advise what will work for building systems We will meet with your Board and Committees to fully understand your needs and desired direction We will fully investigate the existing conditions We will explore multiple solutions and present them to you with the pros and cons of each

7 Industrial Heating & Piping Co. Approach to the project 1. Meet with the Board Committees 2. Perform thorough building and systems investigations 3. Conduct an energy audit and heating load calculations 4. Review green and alternative energy opportunities 5. Design final solution (s) 6. Construction complete before end of 2011

8 Industrial Heating & Piping Co. Existing conditions Aged and inefficient heat generation, distribution, and terminal devices No mechanical air exchanges within building Higher than average utility costs

9 Industrial Heating & Piping Co. There are 2 projects: #1 is the installation of a wood chip fired boiler and accessories to be the primary heat source Budgeted at $1.4 million #2 is to convert the steam system to a hot water system, and other energy improvements Budgeted at $2.7 million Together they will provide a comfortable and energy efficient school environment

10 Industrial Heating & Piping Co. Bio mass project description Construct a new boiler house to accommodate the wood boiler and wood chip storage Install a 4.3 MMBTU wood chip boiler and new oil fired back up boiler Install thermal storage tank and roof top solar units for domestic water and heating water supplement Connect wood fired system to new building distribution system

11 Industrial Heating & Piping Co. Steam to hot water conversion project Replace both existing boilers with one oil fired hot water boiler Reuse as much existing piping as possible and replace as needed Replace univents and terminal device Add fresh air systems with heat recovery Rebuild exhaust fans and air handlers, café and gym Install solid state direct digital building controls Remove equipment from existing boiler room Remove brick chimney Install new lights and sensor in gym

12 Industrial Heating & Piping Co.

13 Industrial Heating & Piping Co. Possible location for new bio mass plant

14 Industrial Heating & Piping Co. Fuel savings Fuel savings spreadsheet Annual 1 st year – $196,704 10 year savings – $1,967,036 15 year savings – $2,950,554 Savings over oil

15 Industrial Heating & Piping Co. ??Questions and Answers?? Thank you for attending tonight and supporting this exciting project for your school department and community. Burn Maine wood – create Maine jobs!


Download ppt "Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School."