ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex 2002 5.6m.

Slides:



Advertisements
Similar presentations
Construction of the ATLAS SCT Endcap Modules Steve Snow Manchester University On behalf of the ATLAS SCT Collaboration Context - ATLAS, Inner Detector,
Advertisements

Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
The ATLAS Pixel Detector
Marco Bregant Vertex05 - Nikko, November 2005 Dipartimento di Fisica Universit à di Trieste & Istituto Nazionale di Fisica Nucleare (INFN) - Trieste ALICE.
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
H.-G. Moser, Max-Planck-Institut für Physik, Munich1 Beauty03, October 2003 The Status of the ATLAS Inner Detector Hans-Günther Moser for the ATLAS Collaboration.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
Didier Ferrère, Geneva University Como, October The Construction Status of the ATLAS Silicon Microstrip Tracker D. Ferrère on behalf of the SCT.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
The ATLAS Silicon Microstrip Tracker introduction system design sensors module design electronics hybrids status Lutz Feld, Freiburg University, for the.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
ATLAS SCT module performance: beam test results José E. García.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
P i x e l C a r m e l Sept. 9, 2002M. Garcia-Sciveres - The ATLAS Pixel Detector1 The ATLAS Pixel Detector Pixel 2002 Workshop M. Garcia-Sciveres.
The ATLAS SemiConductor Tracker Abstract The ATLAS SemiConductor Tracker (SCT) is presented. About silicon micro-strip sensors with a total active.
Jochen Ebert, Uni Karlsruhe1 Powering via cooling pipes very first results.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
The ATLAS Inner Detector Steve McMahon / RAL. Welcome to CERN Geneva Airport LHC accelerator CERN main site SPS accelerator CERN 2nd site It is your laboratory.
The ATLAS Silicon Microstrip Tracker
LHCb VErtex LOcator & Displaced Vertex Trigger
Michał Dwużnik, for the SCT collaboration
The ATLAS Silicon Microstrip Tracker introduction system design sensors module design electronics hybrids construction integration Zdenek Dolezal, Charles.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
ATHENA - Module Construction P. Riedler, J. Rochet.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
ATLAS SemiConductor Tracker Detector Module Design and Performance — Towards Production of Detector Components Lars Eklund for the ATLAS/SCT Collaboration.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Operation & Performance of the ATLAS SemiConductor Tracker Dr. Petra Haefner Max-Planck-Institut für Physik.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
1 End-cap Module Electrical Specs. And Performance C. Lacasta + J. Pater, R. Bates, J. Bernabeu, P. Dervan, A. Greenall, C. Ketterer, J.E. Garcia, G. Moorhead,
01/10/2009 Y. Ikegami, KEK RD09, Florence1 Development of low-mass, high-density, hybrid for the silicon microstrip sensors in high track density environment.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
Performance and operation of the ATLAS Semi Conductor Tracker (SCT) Paul Dervan The University of Liverpool, UK on behalf of the ATLAS SCT Collaboration.
Developing Radiation Hard Silicon for the Vertex Locator
Tracking detectors/2 F.Riggi.
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Simulated vertex precision
Status report of the ATLAS SCT optical links
Strawman module design
Integration and alignment of ATLAS SCT
The SuperB Silicon Vertex Tracker
SIT AND FTD DESIGN FOR ILD
Design and fabrication of Endcap prototype sensors (petalet)
Setup for testing LHCb Inner Tracker Modules
The LHCb VErtex LOcator
Presentation transcript:

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m

Vertex 2002Lutz Feld, Freiburg University2 Endcap Disks covered by 3 Rings of Modules outer modules inner modules cooling block power tapes middle modules (on backside) 9 disks in each endcap, ~1.2m diameter CF structure 132 detector modules on a full disk, 1976 endcap modules in total modules have central mounting and cooling point  module overlap easy each module serviced by a power tape and 3 optical fibres evaporative cooling circuits serve up to 13 modules

Vertex 2002Lutz Feld, Freiburg University3 3 Module Types outer module (52 per ring) inner module (40 per ring) middle module (40 per ring)

Vertex 2002Lutz Feld, Freiburg University4 Endcap Module Design: Silicon Sensors strip direction 4 wedge shape silicon sensors 768 p-in-n strips, single sided supplied by Hamamatsu and CiS sensor alignment < 5µm 40mrad stereo angle

Vertex 2002Lutz Feld, Freiburg University5 Endcap Module Design: „Spine“ strip direction sensors are glued to „spine“: TPG bar for heat removal (1700 W/m/K) AlN wings for mechanical stability mounting points and cooling contacts

Vertex 2002Lutz Feld, Freiburg University6 Endcap Module Design: Hybrid strip direction hybrid: flex circuit on carbon-carbon hybrid connected to sensors only by fanins  thermal split 12 ABCD3TA binary read-out chips (DMILL)

Vertex 2002Lutz Feld, Freiburg University7 Hybrid development of hybrid was critical and needed several iterations very low impedance is key for successful operation of binary ABCD chips requirements: double sided, 12 readout chips supply well filtered analogue/digital power com/data lines and drivers for optical link detector bias supply (up to 500V) heat removal (7W) low mass implementation: 6 layer copper/Kapton flex circuit ~75µm feature size, ~3000 micro vias flex folded around carbon-carbon substrate full assembly and basic testing in industry

Vertex 2002Lutz Feld, Freiburg University8 Thermal Performance of Endcap Module evaporative C 3 F 8 cooling system, capable to cool down to –30°C central module cooling block, split between hybrid and detectors, long modules have additional far end cooling block detailed simulations, confirmed by measurements of non-irradiated and irradiated modules on an evaporative cooling test rig expected after 10 years inner moduleouter module detector temperature vs. radiation damage for coolant at –21°C

Vertex 2002Lutz Feld, Freiburg University9 Electrical Performance binary front-end chip  occupancy vs. threshold  „s-curves“ signal height and noise are derived from „s-curves“ relevant for operation: hit efficiency and noise occupancy noise occupancy determined by –front-end noise (fixed for given ASIC and detector) –channel-to-channel threshold variations (threshold trim per channel) –additional noise: common mode, feedback etc. (the difficult part...) occupancy vs. channel and thresholdoccupancy vs. threshold

Vertex 2002Lutz Feld, Freiburg University10 16 Prototype Modules 9 outer, 2 middle, 5 inner modules built reliably inside tolerances, in several institutes noise 1500 e or less noise ~10 -5 gain ~50mV/fC threshold spread 150 e ENC noise threshold spread gain

Vertex 2002Lutz Feld, Freiburg University11 System Test: 4 Modules on a Disk Sector with 4 modules on disk no extra noise common mode noise negligible noise for each chip when operated  simultaneously  singly common mode noise

Vertex 2002Lutz Feld, Freiburg University12 Testbeam Results binary read-out: efficiency and noise occupancy at given threshold spec: single hit efficiency > 99% while noise occupancy < 5E-4 long modules before / after irradiation to 1.6 or 3.3 E14 24GeV-p/cm 2 in a beam of 180 GeV pions 10 years LHC operation ~2.6 E14 p/cm 2 spatial resolution of 23µm achieved, as expected from pitch/sqrt(12) 150V bias 1.6E14 24GeV-p/cm 480V bias 3.3E14 24GeV-p/cm 480V bias

Vertex 2002Lutz Feld, Freiburg University13 Summary & Outlook ATLAS SCT endcap modules final design review in August 02 now preparing for production of 2000 modules (+spares): –ASICs and detectors: ~80% delivered –hybrid: pre-series of 100 pieces in production, first samples delivered; for production: full assembly and basic testing in industry –spines and fan-ins: pre-series in production, first samples delivered; production can start soon module assembly and QA at 7 sites –good experience with assembly of prototype modules (>20) –preparation of production tooling and qualification over next months –production will take about 1.5 years