Achieving World Class Vehicles with Agile Fabrication Systems for Achieving World Class Vehicles Table Top Hemmer August 22, 2001 by.

Slides:



Advertisements
Similar presentations
Chapter 5 Overview Casting die is the other major component
Advertisements

Pryda Floor & Rafter Truss Systems
O T F O R D T O O L & G A U G E C O M P A N Y L I M I T E D The Design and Manufacture of Mini Applicators O T F O R D T O O L & G A U G E C O M P A N.
KORSCH Tablet Compression Technology
Bringing the Voice of the Consumer Into Your Supply Chain Jake Barr Director, Consumer Driven Supply Network Global Mfg, Planning & Logistics The Procter.
VEGETATION CUTTING MODULE - DESIGN. Deminers want to be helped in vegetation cutting, specially palm leafs.
WELCOME TO DHANADA ENGINEERING PVT.LTD. COMPANY PROFILE & HISTORY.
Waterjet propulsion systems. thirteen waterjet model sizes 100 SERIES 200 SERIES SERIES DJ100G DJ105 DJ110 DJ120 DJ130 DJ140HP DJ170HP DJ200 DJ220.
Mate Grinder MATE European Dealer Meeting Advantages of Automatic Controlled Punch and Die Grinding More regrinds, accurate material removal Protect.
Decorative Tooling for the Finishing Industry
Product Lifecycle Management © 2003 IBM Corporation ArvinMeritor LVS (Light Vehicle Systems)  Customer Background o UK arm of worldwide group of companies.
VS Series Shears. User-friendly CNC Touchscreen Control Flexibility for Thick/Thin or Narrow/Wide Sheets Automatic Swing-up Back Gauge T-slotted Sheet.
Copyrights © ATTEXOR Clinch Systems SA 1 Modules (for integration) This presentation is for internal use of ACS’ exclusive.
Flexible Manufacturing Systems (FMS)
By Dean Mckinstry National Diploma Project Electro Plating Fixture.
Unrestricted © Siemens AG 2013 All rights reserved. Siemens PLM Software Industrial Food Processing Equipment Fred Lauzus Senior Application Engineer Greg.
MMEC LLC dba MidwestMetalcraft & Equipment 200 Industrial Drive Windsor, MO Office: (660) Fax: (660)
Copyright © 2010 – Gasparini GASPARINI ACCESSORIESACCESSORIES.
Ch 1 Introduction Sections: Production Systems
Template: 3BGB D0001 Rev - Body-in-White Assembly systems and products Simultaneous Engineering Simulation Process and Design Installation and Commissioning.
Palletizing the Easy Way
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
TP Series Turret Punches.
Case Study – St Clair Park Village, Auckland, NZ
Department of Industrial and Engineering Technology College of Science and Technology Morehead State University IET 317 Group 5 Project Group Members:
Manufacturing Engineering Department Lecture 1 - Introduction
A.V.C.COLLEGE OF ENGINEERING
Computer Aided Design, Manufacturing & Measurement Integration August Coordinate Measurement System Committee Albuquerque, New Mexico Richey-McIvor-Sandwith.
By : PHILLIP, ANGUS, DASHAUN, JORDAN, AND MARCUS.
“here to make your life easy...” Mobile Services.
Solutions – Design to Delivery
Providing Robotics and Automated Solutions for the Manufacturing Industry Worldwide.
SHIFT_MPE SHIFT_MPE EMTISA Sant Andreu de la Barca, Barcelona, Spain
GLOBALLY COMPETITIVE.
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Md. Niaz Sharif. Construction of Machine Tool  Structure of Machine tools  Slide Ways  Drive System  Mechanical  Electrical  Hydraulic  Pneumatic.
SBT Series Swingbeam Shears.
MANUFACTURING VOCATS 7.O5. MANUFACTURING is A system or group of systems used in the manufacturing process to make products for an end user.
Ch. 9: Organizational Agility: The Responsive Organization
MicroMet Cutting Edge Technology Defence Systems Division.
Controllable Gas Springs KF2. Step 1 Forming + ? Step 2 Piercing Flanging + ? Step 3 Trimming + ? Add functionality Increase production rates Reduce tooling.
New Product Development Page 1 Teddy Concurrent Engineering by Teddy Sjafrizal.
Innovative Toolings & Automation Solution P-1 Contact No Mail id: Company address: 23, 24, Shivam Industrial estate, Near Hotel.
COMPANY INTRODUCTION S & C Co., Ltd.
 Your Single Source for "to spec" Custom Manufacturing Your Single Source for "to spec" Custom Manufacturing  AMS offers a unique and complete combination.
20/11/161 NEW E5 FINN-POWER e-technology - 14 years of excellence.
H, I & PLUS BEAM FABRICATION LINE WITH MATERIAL HANDLING
It’s…….
Optimum Pump Performance for Process Applications
Technological process for parts FAN COVER
Haeger VS PEM.
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
Essem Engineers Beyond the limits…
The University of Jordan Mechatronics Engineering Department
Rosava Engineering Group Gantry Crane Manufacturer
COMPANY INTRODUCTION S & C Co., Ltd.
FINN-POWER e-technology - 14 years of excellence
The Challenges of Electronic Enclosures for US Navy Ships
Automation (자동화) Associate Professor Su-Jin Kim
Agenda I. Business Overview ● Business Summary ● Capabilities
ERDF Sustainable Advanced Manufacturing SME Support Programme
QE 107: Workshop Technology Section 5: Manufacturing Organisation
GLOBACOM telecommunications company Prototype Alfred Awonuga.
Company Overview Founded in 1967 by George S. Moxlow
Computer Networking A Top-Down Approach Featuring the Internet
Ch 1 Introduction Sections: Production Systems
Your gateway to an automated retreading world
Stoughton Parts Sales 2019 Customer Appreciation Event
Presentation transcript:

Achieving World Class Vehicles with Agile Fabrication Systems for Achieving World Class Vehicles Table Top Hemmer August 22, 2001 by

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 2 GSEG Supplies Engineering & Components with Proprietary Technology We integrate our proprietary technology and independent resources through our Company to deliver world class products for our customers Proprietary Technology Suppliers Process Engineering / Design Long Term Service & Support

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 3 GSEG Global in Our Outlook Providing Best Practices in –Lean Processing –Virtual Factory design –Low Cost Sourcing –Functional Build Our Mission GSEG is committed to eliminating waste, costly duplication of efforts and production start-up problems for our customers. We accomplish this by providing proprietary technologies and the simultaneous development and delivery of world class equipment from a single source through integrated subcontracts. The Company

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 4 Hemmer Design Originally Designed for Cologne Tool & Die Operations Over 50 installations in Ford of Europe GSEG has exclusive world wide rights to sell the this hemmer design and technology (except to Ford)

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 5 Table Top Hemmer Combination Electrical / Pneumatic Drive Multiple Die Sets –Capable of 2 to 4 Models Auto Die Change –30 Second Model Change Aluminium & Laser Welded Blank Capable

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 6 Specifications Features –Hemmer & Fixture Operation Pneumatic / Pneumatic –Size (l/w/h)2600x2500x1630 mm –Cycle Time (hem only)14 sec. –Cycle Time (w/part transfer)24 sec. –Quick Change CapableYes –Cycle Time (w/tool transfer)30 sec. –Cycle Time (w/part & tool transfer)50 sec. –Part Loading / Transfer Method Robot or Shuttle –Full Periphery Hem Capable Yes – 2 Strokes/1 Station –Full Periphery w/Beltline CapableYes –Full Periphery w/I/S Window Capable Yes –Full Periphery w/beltline and I/S Window CapableYes –Optimum Open Flange Angle90º –Max. Flange Angle Allowed113º –Accessibility for MaintenanceYes –Hem Force (kg/mm)10kg – 20kg/mm Delivery –From P.O. to complete 24 Weeks

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 7 The History of Clinching / Hemming Starts with High Speed Lines using Hydraulic Clinch Presses with Tool Change –Disadvantages »Requires Batch Build Moves to Captive Lines with Table Top Hemmers (Electric or Hydraulic Drive) –Disadvantages »Model Specific »High Investment for Multiple Models

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 8 Manufacturing’s Requirements Model Flexibility Reusability Model Changeover with Zero Production Loss Maintainability Accessibility of Clinch Steel No Use of Hydraulics Global Solution

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 9 New System Design Goals Hemmer Family to suit the whole Range of Models Model Related Clinch Dies and Reusable Facility Quick Die Change Use of Production Die for Prototypes Modular Design / Construction –Easy Access for Maintenance –Simplify Drive System

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 10 Modular Design Pneumatic / Pneumatic Drive Die Set Air Drive Frame

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 11 Station UPPER FRAME PLATE POWER CONNECTION (STATION) GUIDE FOR DIE SET FRAME LOWER FRAME PLATE UNIT FOR DIE POSTIONING AND CLAMPING LIFT TABLE ELECTRIC DRIVE (WAY) AIR CUSHION (FORCE) FORCE TRANSMITTER

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 12 Die Set UPPER DIE PLATE POWER CONNECTION (DIE) LOWER DIE PLATE CAM CAM DRIVE 90° STEELS 45° STEELS

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 13 Table Top Hemmer Load Condition –Lifter Down –Hem Steels Out Operations Sequence 1.Load Part 2.Hem Steels In 3.Electric Lifter Up to 45º Hem Steel (within 10mm of Steel) 4.45º Hem (Force by Air Cushion Lift Table) 5.Electric Lifter Down 6.Hem Steels Out 7.Electric Lifter Up to 90º Hem Steel (within 10mm of Steel) 8.Hem Steels In 9.90º Hem (Force by Air Cushion Lift Table) 10.Hem Steels Out 11.Unload

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 14 Table Top Hemmer Load Condition –Lifter Down –Hem Steels Out Operations Sequence 1.Load Part 2.Hem Steels In 3.Electric Lifter Up to 45º Hem Steel (within 10mm of Steel) 4.45º Hem (Force by Air Cushion Lift Table) 5.Electric Lifter Down 6.Hem Steels Out 7.Electric Lifter Up to 90º Hem Steel (within 10mm of Steel) 8.Hem Steels In 9.90º Hem (Force by Air Cushion Lift Table) 10.Hem Steels Out 11.Unload

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 15 Table Top Hemmer Load Condition –Lifter Down –Hem Steels Out Operations Sequence 1.Load Part 2.Hem Steels In 3.Electric Lifter Up to 45º Hem Steel (within 10mm of Steel) 4.45º Hem (Force by Air Cushion Lift Table) 5.Electric Lifter Down 6.Hem Steels Out 7.Electric Lifter Up to 90º Hem Steel (within 10mm of Steel) 8.Hem Steels In 9.90º Hem (Force by Air Cushion Lift Table) 10.Hem Steels Out 11.Unload

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 16 Table Top Hemmer Load Condition –Lifter Down –Hem Steels Out Operations Sequence 1.Load Part 2.Hem Steels In 3.Electric Lifter Up to 45º Hem Steel (within 10mm of Steel) 4.45º Hem (Force by Air Cushion Lift Table) 5.Electric Lifter Down 6.Hem Steels Out 7.Electric Lifter Up to 90º Hem Steel (within 10mm of Steel) 8.Hem Steels In 9.90º Hem (Force by Air Cushion Lift Table) 10.Hem Steels Out 11.Unload

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 17 Table Top Hemmer Load Condition –Lifter Down –Hem Steels Out Operations Sequence 1.Load Part 2.Hem Steels In 3.Electric Lifter Up to 45º Hem Steel (within 10mm of Steel) 4.45º Hem (Force by Air Cushion Lift Table) 5.Electric Lifter Down 6.Hem Steels Out 7.Electric Lifter Up to 90º Hem Steel (within 10mm of Steel) 8.Hem Steels In 9.90º Hem (Force by Air Cushion Lift Table) 10.Hem Steels Out 11.Unload

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 18 Table Top Hemmer Load Condition –Lifter Down –Hem Steels Out Operations Sequence 1.Load Part 2.Hem Steels In 3.Electric Lifter Up to 45º Hem Steel (within 10mm of Steel) 4.45º Hem (Force by Air Cushion Lift Table) 5.Electric Lifter Down 6.Hem Steels Out 7.Electric Lifter Up to 90º Hem Steel (within 10mm of Steel) 8.Hem Steels In 9.90º Hem (Force by Air Cushion Lift Table) 10.Hem Steels Out 11.Unload

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 19 Table Top Hemmer Load Condition –Lifter Down –Hem Steels Out Operations Sequence 1.Load Part 2.Hem Steels In 3.Electric Lifter Up to 45º Hem Steel (within 10mm of Steel) 4.45º Hem (Force by Air Cushion Lift Table) 5.Electric Lifter Down 6.Hem Steels Out 7.Electric Lifter Up to 90º Hem Steel (within 10mm of Steel) 8.Hem Steels In 9.90º Hem (Force by Air Cushion Lift Table) 10.Hem Steels Out 11.Unload

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 20 Table Top Hemmer Load Condition –Lifter Down –Hem Steels Out Operations Sequence 1.Load Part 2.Hem Steels In 3.Electric Lifter Up to 45º Hem Steel (within 10mm of Steel) 4.45º Hem (Force by Air Cushion Lift Table) 5.Hem Steels Out 6.Electric Lifter Up to 90º Hem Steel (within 10mm of Steel) 7.Hem Steels In 8.90º Hem (Force by Air Cushion Lift Table) 9.Hem Steels Out 10.Unload

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 21 Die Exchange 1.Electric Lifter Up 2.Open Die Position Clamps 3.Clamp Die Bed 4.Electric Lifter Down 5.Engage Tool Change Drive 6.Transfer Model A Out 7.Transfer Model B In 8.Close Die Position Clamps / Electric Lifter Up 9.Un-Clamp Die Bed from Die Set 10.Clamp Die Bed to Electric Lifter Sequence of Events

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 22 Die Exchange 1.Electric Lifter Up 2.Open Die Position Clamps 3.Clamp Die Bed 4.Electric Lifter Down 5.Engage Tool Change Drive 6.Transfer Model A Out 7.Transfer Model B In 8.Close Die Position Clamps / Electric Lifter Up 9.Un-Clamp Die Bed from Die Set 10.Clamp Die Bed to Electric Lifter Die Unclamped Lifter Down

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 23 Die Exchange 1.Electric Lifter Up 2.Open Die Position Clamps 3.Clamp Die Bed 4.Electric Lifter Down 5.Engage Tool Change Drive 6.Transfer Model A Out 7.Transfer Model B In 8.Close Die Position Clamps / Electric Lifter Up 9.Un-Clamp Die Bed from Die Set 10.Clamp Die Bed to Electric Lifter

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 24 Die Exchange 1.Electric Lifter Up 2.Open Die Position Clamps 3.Clamp Die Bed 4.Electric Lifter Down 5.Engage Tool Change Drive 6.Transfer Model A Out 7.Transfer Model B In 8.Close Die Position Clamps / Electric Lifter Up 9.Un-Clamp Die Bed from Die Set 10.Clamp Die Bed to Electric Lifter

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 25 Die Exchange 1.Electric Lifter Up 2.Open Die Position Clamps 3.Clamp Die Bed 4.Electric Lifter Down 5.Engage Tool Change Drive 6.Transfer Model A Out 7.Transfer Model B In 8.Close Die Position Clamps / Electric Lifter Up 9.Un-Clamp Die Bed from Die Set 10.Clamp Die Bed to Electric Lifter

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 26 Maintenance Die Set Out of Frame down open Unclamp Die Lifter Down

Flexible Hemmer © 2004 Global Systems Engineering Group, LC 27 To Contact Us Joerg Hoefer CEO 667 Elmwood, Suite 100 Troy, Michigan P.O. Box 1496 Troy, Michigan F AX Internet Dave Fisher Vice President 777 Wimbleton Drive Birmingham, Michigan / F AX 248/ Internet