1 Technological process for parts FAN COVER
LAYOUT Attachment no 4 Technological process for parts FAN COVER

2 The system of exchanging tools - common for both presses
Layout view THE BASIC CYCLE 1 CYCLE 2 R1 R2 R3 THE SUPPORT CYCLE 3 The system of exchanging tools - common for both presses Mechanical press 5000kN Hydraulic press 8000kN Deep-drawing tool [2] [3] Conveyor no.1 [4] Conveyor no.2 Conveyor no.3

3 BASIC CYCLE 1 R1 R2 The roller guide with automatic mode in 3 zones
Loading sheets The roller guide with automatic mode in 3 zones Positioning [1] table Hydraulic press 8000 kN Conveyor no. 2 Deep-drawing Tool [2] Positioning table The roller guide with automatic mode in 3 zones The lift Robot 1 Deep-drawing Tool [2] Robot 2 Belt Conveyor no. 2 Taking off the drawpiece from the conveyor by the operator One stroke of press Collar cutting tool of the drawpiece [5] [manually operated]

4 BASIC CYCLE 2 R2 [3] [4] R3 Perforation punching tool[4]
Side holes punching tool [3] Robot 2 Drawpiece turn on the perforation punching tool 3 times 90° within 3 strokes of press Robot 3 Conveyor no. 2 BASIC CYCLE 2 Loading the drawpiece on the conveyor no. 3 by the operator and start-up the conveyor One stroke of press Four strokes of press Taking off the drawpiece from the conveyor by the operator Collar cutting tool of the drawpiece [5] [manually operated] Conveyor no. 3 . Mechanical press 5000 kN [3] [4] Hydraulic press 8000 kN

5 Collar cutting tool of the drawpiece [5] [manually operated]
THE SUPPORT CYCLE 3 Loading the drawpiece on the conveyor no. 1 by the operator and start-up the conveyor Stamping Tool [6] Robot 1 Robot 2 Conveyor no. 2 Taking off the drawpiece from the conveyor by the operator Robot 2 Robot 1 R1 R2 Hydraulic press 8000 kN Conveyor no. 2 Deep-drawing Tool [6] Conveyor no. 1 Collar cutting tool of the drawpiece [5] [manually operated]

6 Tools and selected schema elements
[2]. Deep-drawing Tool - oper. 1 [3]. Side holes punching tool – oper. 2 [5]. Collar cutting tool [4].Perforation punching tool [6] Stamping tool [spreading]

7 Tools and selected schema elements
[1]. Table positionig of the sheet [7] Conveyor

8 THE DRAWPIECES Fig.3 The drawpiece after punching side holes operation 3 – showing the base for the operation of punching in the first assumption Fig.1 The drawpiece after the first operation of the deep-drawing flattening Fig.2 The drawpiece after collar cutting operation 2 – showing the base of operation for punching side holes. flattening Base hole ø8 Cut for the lower base Fig.4 The drawpiece after perforation

9 The basing sheet on the deep-drawing tool [2]- basic cycle 1
THE BASING SHEET WITH PLATE LUBRICATION AREA

10 The drawpiece base on the side holes punching tool [3] – basic cycle 2
[3] PUNCHING TOOL OF THE SIDE HOLES [4] PUNCHING TOOL OF THE PERFORATION PLACE OF BASE OF THE FLATTENING

11 The drawpiece base on the perforation punching tool [4]- in the first assumption – basic cycle 2
Side base Pin ø8

12 The drawnpiece base on the perforation punching tool [4]- in the second assumption – basic cycle 2
The pin on the spring Lift and rotate 90° drawpiece Kołek ø8

13 The drawpiece base on the perforation punching tool [4]- in the third assumption– basic cycle 2
The pin on the spring Pin ø8

14 The drawpiece base on the perforation punching tool [4]- in the fourth assumption – basic cycle 2
Pin ø8 The pin on the spring

15 The drawpiece base on the deep-drawing tool [6]- support cycle 3
PLACE OF DRAWPIECE FLATTENING SET IN PLACE OF THE FLATTENING OF THE PUNCH

16 Sheets Warehouse (the roller conveyor- bufor)
CYCLE 1 DESCRIPTION Lubrication of the shedder plate in the deep-drawing tool. [slide 9] Taking the sheet by robot 1 from the positioning table and placing it in the basis of the deep-drawing tool [press shedder device in upper position]. 1st press stroke activation Taking the die off the tool by robot 2 and placing it on the belt conveyor. The drawpiece in the safe zone is taken off by the operator. Positioning Table Sheets Warehouse (the roller conveyor- bufor) The lift Robot 1 Deep-drawing Tool [2] Robot 2 Coveyor no. 2 Taking off the drawpiece from the conveyor by the operator and cutting collar on the cutting tool. Taking the sheet ≠1,5 x ø1115 by robot 1 from the stack of blanks and placing it on the positioning table [control system for taking one sheet is obligatory]. Lubrication of sheet [besides of central zone about ø 500].

17 Cycle 2 description Taking the drawpiece by robot 2 from the conveyor and placing it in the bases of the punching tool [3] with the required positioning of flattened drawpiece area [slide 10] 1st press stroke activation Perforation punching tool [4] Side holes punching tool [3] Robot 2 Drawpiece turn on the perforation punching tool 3 times 90° within 3 strokes of press Robot 3 Conveyor no. 2 Loading the drawnpiece on the conveyor no. 3 by the operator and start-up the conveyor One stroke of press Four strokes of press Placing the die on the belt conveyor in the set flattened position on the drawpiece circumference After conveyor activation by the operator the drawpiece must be stopped in the strictly defined position [this condition must be included in the conveyor construction] Taking and moving the drawpiece by robot 2 from the tool and placing it in the basis of perforation punching tool [4] with the required positioning [two bases for the first assumption - slide 12] 2nd press stroke activation Lifting the drawpiece up by the robot 3 , 90° rotation and placing the drawpiece in the punching tool bases with the required drawpiece positioning [bases for the second assumption – slide 12]. 3rd press stroke activation. Lifting the drawpiece up , 90° rotation and placing the die in the punching tool bases with the required drawpiece positioning [bases showed in slide 13]. 4th press stroke activation. Lifting the drawpiece up , 90° rotation and placing the drawpiece in the punching tool bases with the required die positioning [bases showed in slide 14]. 5th press stroke activation. Taking the drawpiece off the punching tool by robot 2 and placing it on the conveyor. The drawpiece in the safe zone is taken off by the operator. Technological line contractor will together with Firma Tarapata agree on the equipment of tools with necessary sensors and instalations.

18 Cycle 3 description Lubrication of the drawpiece collar area [by the operator]. Placing the drawpiece on the belt conveyor with the settled flattened position [flattening sketch rys.1]. After belt feed activation by the operator the drawpiece must be stopped in the strictly defined postion [this condition must be included in the conveyor construction] Taking the drawpiece by robot 1 off the conveyor and placing it in the bases of the stamping tool with the required positioning of flattened drawpiece area [slide 15] Press shedder in lower position by 120 mm. 1st press stroke activation Deep-drawing Tool [2] Robot 1 Robot 2 Conveyor no. 2 Taking off the drawpiece from the conveyor by the operator Loading the drawpiece on the conveyor no. 1 by the operator and start-up the conveyor Taking the drawpiece off the tool by robot 2 and placing it on the conveyor. The drawpiece in the safe zone is taken off by the operator.