RockOn! 2009 1 Canister Integration RockOn! 2009.

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

GOODSON Tools and Supplies for Engine Builders Calibrating and Maintaining Your Precision Machinists Level.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Load the Crimp into the jaws of the Crimper/Tensioner instrument.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Optical Manufacturing Solutions 1 Probe Assembly.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Materials QtyLWHDescription 28’X4’X15/16”Plywood (15/16” is also known as ¾”) 88’X2”X1”Lumber – Pine 16Home Depot 5 Gal Bucket 48’Rolls of hook and tie.
Honda Recon TRX-250 Installation Manual. STEP 1: Remove rear tires and install axle spacers. Use blue thread locker and tighten lugs to ATV specification:
Presented by: Ginnette Clark Terri Hall Robert Ishmael Michael Petry.
MyLock 644D Service Seminar.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Model 12 Intek Horizontal OHV
Step 12 Here is the issue…..the mount for the throttle arm is pushed up against the side of the housing. The problem with this is it allows (due to alignment)
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
Reduced Vertical Separation Minimum (RVSM)
5/13/ Assembling and Testing Your Robot. 5/13/2015 Mounting the Topside Hardware  Parts Boe-Bot Chassis (1) Standoffs (4) 1/4” 4-40 Screws (4)
Choose Your Motor Type (Click The Appropriate Picture) S-CanSlimline- FF050 Topic Jump.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
Robot Build IT Girls Allowed 2014 Updated 14 th August.
Installation. Indoor Unit Installation Typical Installation.
University of Minnesota Unmanned Aerial Vehicle Research Lab Goldy Flight Control System Manufacturing Instructions.
Wheel Bearing Service. - Remove the cap using a flat head screw driver or pipe pliers. Careful not to damage the cap.
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Installation. Indoor Unit Installation Typical Installation.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
RockOn! RockOn! Structure Build RockOn! 2008.
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
Focusing Lighting Instruments THE107. Focusing Lights This presentation will walk you through the basic steps of focusing a theatrical lighting instrument.
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
Model 12 Intek Horizontal OHV
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
RockOn! RockOn! Structure Build RockOn! 2009.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Assembly of steering.
VIEW SERIES with Sliding Door
Internal and External Screw Threads
30’ Wireless Mast – Self Install
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
Annex 4 - Moving Frame and Whiffletree assembly
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Assembly Instructions:
Bilge Pump Service Project Model Service Kit
IN-VEHICLE ENGINE SERVICE
Chapter 26: Mechanical fasteners 1
How to Change a Flat Tire
Assembly instructions for M-K all bolt together hoppercone kit.
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
4 shelf shoe rack assembly instructions
Presentation transcript:

RockOn! Canister Integration RockOn! 2009

2 Overview: -Now that your payload has been built, tested, and mounted to a structural plate, it is time to assemble a stack of plates and integrate them into the RockSat canister configuration. -This procedure has changed a bit from last year -Not all pictures have been updated

RockOn! What Are We Building? RockOn! 2009

4 Final Product 1: Above: 5 plate stacked configuration. Below: Stacked configuration in can. (Minus lid)

RockOn! Final Product 2: SolidWorks model and actual picture of structural RockSat canister. 5 Plate Stack Stand-offs attached to Top Lid. Barrel Section attached to Top Lid (8 Places) Assembled can with payload ~20 pounds

RockOn! Groups and Hardware RockOn! 2009

7 Group Formation: To Begin: - Examine your plate for a serial number. The leading number indicates which can your team flies in, and the last two digits indicate plate number. Can Number Plate Number

RockOn! Group Formation 2: -Find the other four (4) groups that have the same can number and sit together. (5 Plates total) -The assistants will come around and pass out the hardware that each team will need to build the RockSat can structure.

RockOn! Required Hardware 1: -One (1) Top Bulkhead-One (1) Bottom Bulkhead

RockOn! Required Hardware 2: -One (1) 9/64 hex key -Two 5/16 open-end wrenches -Twenty (20) long male- female (MF) stand-offs Hex Key Wrenches

RockOn! Required Hardware 3: -Five (5) male- female (MF) short (cut-off) stand-offs -Five (5) female- female (FF) stand-offs -Sixteen (16) 3/8” bolts -Five (5) 5/8” bolts 5/8” 3/8”

RockOn! Required Hardware 4: -Ten (10) locking washers -Five (5) 1/2’’ bolts 1/2”

RockOn! An Update RockOn! 2009

14 Update Note: -Some AVR boards were too close to a support stand-off during fit checks.

RockOn! Update Note: -To help alleviate the issue, a small chunk was nipped from the edge of the board. -This should resolve the issue. -If at any time you are unsure if you may be doing damage to your board while installing stand-offs, please raise your hand.

RockOn! Crowd Control RockOn! 2009

17 Crowd Control: -Listen to your integration table leaders -Don’t crowd the table -Respect the payloads above and below your payload -Take your time because there is no time fix your mistakes -Watch out for wires and the handling of the wires -DO NOT WORK AHEAD -Pay attention to overall announcements -Listen to your integration table leaders, they are responsible for your successful integration

RockOn! Let’s Begin The Integration RockOn! 2009

19 Bottom Plate “01” Step 1: -Take one (1) short stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “01.” -The threaded end should protrude on the top side of the plate

RockOn! Bottom Plate “01” Step 2: -Screw on one (1) FF stand-off to the short MF stand-off you added. -Important: Tighten by hand until you cannot turn it anymore.

RockOn! Bottom Plate “01” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Bottom Plate “01” Step 4: -Repeat the previous steps to add the other four (4) MF and FF stand-offs to plate “01” as shown. -Plate “01” should look similar to the pictures to the left.

RockOn! Plate “02” Step 1: -Take one (1) long stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “02.” -The threaded end should protrude on the bottom side of the plate to thread into the FF stand-off on plate “01.”

RockOn! Clocking: -Clocking is a technique where each plate is rotated 180° relative to the previous plate. -Clocking is used here to better balance the RockSat cans due to the CG not being exactly at the geometric center of the plate. AVR 01 AVR 03 AVR 05 AVR 02 AVR 04

RockOn! Plate “02” Step 2: Clocked 180° -Clock or rotate plate “02” 180° such that the AVR boards are opposite to each other. -Hand tighten the MF stand-off until you can turn it no further. MF Stand-Off

RockOn! Plate “02” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Plate “02” Step 4: -Repeat the previous steps to mate the MF stand-offs into the FF stand-offs on the deck below. -Plates “01” and “02” should look similar to the pictures to the left

RockOn! Plate “03” Step 1: -Take one (1) long stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “03.” -The threaded end should protrude on the bottom side of the plate to thread into MF stand-off on plate “02.”

RockOn! Plate “03” Step 2: -Clock or rotate plate “03” 180° such that the AVR boards on plate “02” and “03” are opposite to each other. -Hand tighten the MF stand-off until you can turn it no further. Clocked 180° MF Stand-Off

RockOn! Plate “03” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Plate “03” Step 4: -Repeat the previous steps to mate the MF stand-offs into the MF stand-offs on the deck below. -Your stack should resemble the picture to the left

RockOn! Plate “04” Step 1: -Take one (1) long stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “04.” -The threaded end should protrude on the bottom side of the plate to thread into MF stand-off on plate “03.”

RockOn! Plate “04” Step 2: -Clock or rotate plate “04” 180° such that the AVR boards on plate “04” and “03” are opposite to each other. -Hand tighten the MF stand-off until you can turn it no further. Clocked 180° MF Stand-Off

RockOn! Plate “04” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Plate “04” Step 4: -Repeat the previous steps to mate the MF stand-offs into the MF stand-offs on the deck below. -Your stack should resemble the picture to the left

RockOn! Plate “05” Step 1: -Take one (1) long stand-off and place the male end through one of the 5 holes on the plate with the serial number ending in “05.” -The threaded end should protrude on the bottom side of the plate to thread into MF stand-off on plate “04.”

RockOn! Plate “05” Step 2: -Clock or rotate plate “05” 180° such that the AVR boards on plate “05” and “04” are opposite to each other. -Hand tighten the MF stand-off until you can turn it no further. Clocked 180° MF Stand-Off

RockOn! Plate “05” Step 3: -Use your wrenches to tighten the stand-off an extra quarter turn. (90° or π/2 radians)

RockOn! Plate “05” Step 4: -Repeat the previous steps to mate the MF stand-offs into the MF stand-offs on the deck below. -Your stack should resemble the picture to the left

RockOn! Bottom Bulkhead 1: -Carefully turn the stack upside down. -Place the bottom bulkhead (with the outer bolt circle) on the bottom of the stack -Make sure the notch aligns with the set of blue RBF wires as shown.

RockOn! Bottom Bulkhead 2: -Take one (1) 1/2” bolt and locking washer and hand screw it into the center stand-off as shown.

RockOn! Bottom Bulkhead 2: -Lightly tighten the 1/2” bolt and lock washer with the hex key. -Important: Don’t not over tighten the bolt. After all bolts are in, they will be torqued to 30 in*lbs.

RockOn! Bottom Bulkhead 3: -Insert and tighten the remaining four (4) 1/2” bolts and washers on the bottom bulkhead. -Note: Add the bolts in an alternating fashion (like tire lug nuts) as indicated above. Tighten until bolts are flush with the plate

RockOn! Bottom Bulk Head 4: -Have two people in the group carefully rotate the stack 180° so that it now rests on the bottom bulkhead. -Your stack should resemble the picture to the left.

RockOn! Outer Skin 1: -Ensure that the blue wires all pass down the channel with the LEDs. -Also check that no wires or objects are on the edge of any of the plate. -Place the outer skin onto the bottom bulkhead.

RockOn! Outer Skin 2: -Align the outer skin to allow the skin and bulkhead holes to line up. -By hand, screw in all eight (8) 3/8” bolts through the skin to attach it to the bottom bulkhead. Good Alignment -Important: Do not over tighten the bolts. The bolts will be torqued to 30 in*lbs 8 Total

RockOn! Outer Skin 3: -Use the hex key to lightly tighten all eight (8) 3/8 bolts -Note: Use an alternating pattern (like tire lug nuts). -Caution: Do not over tighten the bolts. The bolts will be torqued to 30 in*lbs once all structural bolts are installed.

RockOn! Outer Skin 4: -Your structure should now resemble the picture to the left.

RockOn! Outer Skin 5: -Place the top bulkhead on the stack as shown to the left. -Make sure that the notch aligns with the wire path way.

RockOn! Outer Skin 6: -Align the outer skin to allow the skin and bulkhead holes to align. -By hand, screw in all eight (8) 3/8” bolts into the skin to attach it to the top bulkhead. Good Alignment 8 Total

RockOn! Outer Skin 7: -Use the hex key to lightly tighten all eight (8) 3/8 bolts -Note: Use an alternating pattern (like tire lug nuts). -Caution: Do not over tighten the bolts. The bolts will be torqued to 30 in*lbs once all structural bolts are installed.

RockOn! Outer Skin 8: -Your structure should now resemble the picture to the left.

RockOn! Top Bulk Head 1: -You might find that your top bulkhead bolts don’t align perfectly. -If this is the case, reach in through a window and apply a small amount of force to achieve alignment.

RockOn! Top Bulkhead 2: -Once alignment is achieved, insert one (1) 5/8” bolt and lock washer into the center hole. -Lightly tighten the bolt with the hex key. -Important: Leave this bolt loose enough to make slight adjustments to the other four (4) bolts.

RockOn! Top Bulkhead 3: -By hand, lightly screw in the other four (4) 5/8” bolts and lock washers.

RockOn! Top Bulkhead 4: -Use your hex key to tighten all five (5) 5/8” bolts and lock washers on the top of the bulkhead.

RockOn! Top Bulkhead 5: -Your structure should look like this, but with more wires coming down the pass-through. -Note: All LEDs and connectors should be visible in the wire way.

RockOn! Final Product: Congratulations! You have completed integration of your payload with the RockSat can. We will now walk through a shorting plug test, pull the RDY LED, and get all structural bolts torqued and ready for the hand-off to Wallops engineers!