Fill in Agency Name on Master

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
6TH ANNUAL CONFERENCE.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
mydocs-presentations-2011PAPAMWF-EricaRevisions
APRIL 2014 CPOC LIRR SANDY RESTORATION PROJECTS. Active LIRR Sandy Projects PROJECT EAC Traction Power Substations64.1M Long Beach Branch Systems 56.4M.
Construction Industry Advancement Program William Wilson P.E., Supervising Engineer, Structures New Jersey Turnpike Authority Working with New Jersey Turnpike.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
New York Building Congress November 13, 2014 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM.
Update Training Meeting
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
York Region’s Pedestrian and Cycling Municipal Partnership Program Presentation to 2014 Sustainable Mobility and Healthy Communities Summit ACT Canada.
Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Maryland Transportation Authority (MDTA)
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
Greenman-Pedersen, Inc. Coatings Group Review of Maintenance Prioritization Schemes from Three Transportation Authorities Christopher L. Farschon, P.E.,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
1 Emerging Renewables Program Solar Conference North State Renewable Energy Chico, CA March 10, 2005 BILL BLACKBURN Lead, Emerging Renewables Program California.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
September 26, East Side Access Status Report to CPOC September 26, 2011.
John S. Halikowski ADOT Director Phoenix Chamber of Commerce Transportation Committee Sept. 22, 2011.
Depression and New Deal Professor Kenneth T. Jackson.
1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) Real Estate Economic Forecast Two New Bridges, One Project.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
1 Management Report on Bradley West Project BOAC Meeting October 5, 2009.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Draft for Discussion & Policy Purposes Only
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Brentwood of Palatine Condominium Board Meeting Treasurer’s Report – Cash Position – Scorecard – Expense Contributions – Delinquencies – Remaining.
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Open Road Tolling Procurement Update
January 18, 2017 City of San Diego
Turning Ideas into Reality Presentation to Build NYC
Project Purpose and Objective
MSD’s Second Annual “Can You Dig It?”
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
107th & 110th Avenue North Public Utilities Renewal Projects
NEW YORK CITY COMMUNITY BOARDS
Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014.
New York Building Congress
2018 Adopted Budget February Financial Plan
Board of Commissioners Meeting
Florida Transportation Commission FY 2009
Pacific Power Seismic Preparedness Update
Illinois Waterway 2020 Consolidated Closure
Cost Containment Working Group Board Update
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Cost Containment Working Group Board Update
Presentation transcript:

MTA Bridges and Tunnels New York Building Congress November 13, 2014

Fill in Agency Name on Master Overview Introduction 2010-2014 Capital Program Sandy Restoration/ Mitigation Program 2015-2019 Capital Program Operating Program Small Business Mentoring Program New Initiatives & Directions Upcoming Opportunities Q/A Fill in Agency Name on Master

2010-2014 Capital Program: Current Status Out of $2.078B, as of end of October, 2014, $1.33 Billion has been committed. Approximately 90% of the commitments are anticipated to be awarded before the end of 2014 including the following: BB28/BB28S/BB54 – Restoration of Hugh C. L. Tunnel & Repair/ Replacement of Brooklyn Plaza Structural Slab RK65A – Reconstruction of Bronx Toll Plaza RK23A – Reconstruction and Rehabilitation of the Manhattan Approach Ramps HH88A – Reconstruction of Upper and Lower Plaza and Southbound Approach RK76 – Miscellaneous Structural Repair TN-52 – Miscellaneous Structural Rehabilitation HH-88A – ORT Gantry Installation Anticipate the following awards in 2015: QM40/QM40S/QM18 – Restoration of Queens Midtown Tunnel CB99S/ MP03/MP-03S (Design -Build)– Replace CBB Mech. & Elect Equip – S. Abutment / S. Bldg and Rehab MPB Mech. and Elect Equip – N. Abutment Bridges and Tunnels

Sandy Programs A $778 million Capital Amendment approved by MTA Board in December, 2012 for Restoration work at the Hugh L. Carey and Queens Midtown Tunnels, and the bridges damaged by Sandy. $700 million will address damage to the tunnels $78 million will address damage to bridges and other assets Sandy Program divided in two categories – Sandy Restoration BB-28/28S/54 low bid $283M. Anticipate award by end of November (includes some mitigation work) QM-40/40S/18 – Anticipate award in first quarter 2015 (Includes some mitigation work) Sandy Mitigation - See following Slide Bridges and Tunnels

Sandy Mitigation Program Contracting Opportunities Type of Work under Mitigation Program to be awarded 2015 and beyond: Tunnel Perimeter Work Extension of Plaza Retaining Wall, Protection of Vulnerable Locations Raising Sea-Wall Flood Mitigation work at Service Buildings, including flood walls Design/Build of Electrical Substation Relocation of Revenue Control System Standby Emergency Generator Elevating bridge plazas, and flood proofing of utilities Bridges and Tunnels

Proposed 2015-2019 Capital Program As you can see, a significant portion of the capital work in the upcoming years is focused at three long span bridges, the RFK, VNB and TNB. The majority of the capital program is focused on State of good repair projects dealing with the decks and supporting structures. Distribution By Facility Distribution By Asset Category Bridges and Tunnels

Proposed 2015-2019 Capital Program Eleven projects account for approximately 60% of the 2015-2019 Program total. Four of the projects are major deck replacement or deck rehabilitation projects Six of the projects are major structural rehabilitation projects One project is the construction of a new off Ramp from the RFK to the North Bound Harlem River Drive Bridges and Tunnels

Operating Program Average Operating program spending projected at $70M over the next 5 years. Typical Work performed under operating budget includes: Paving Flag Repairs Bridge Preservation Bridge Washing Spot Painting Scupper Cleaning Drainage Cleaning Joint Cleaning & Replacement Work under operating program typically contracted via As-Needed Requirements Contractors and SBMP contractors Our Operating/MM program is to fund all on-going major maintenance, as-needed repair and rehabilitation work, biennial inspection, some painting work, bridge preservation, tunnel inspection program, and other needs. Work is typically contracted via as-needed requirements contractors and SBMP contractors, however, some work will be combined with capital projects due to coordination/best value considerations

B&T Current SBMP Program Status Goal - $14,500,000, Awarded - $20,885,897 (projected) B&T is expected to exceed the 5-year SBMP goals by approximately 44%

New Initiatives and Directions Use of Design-Build: B&T has completed 12 design-build projects to-date On-going DB projects include: RK-65R2: Training Facility VN-87: Substation #1 Rehabilitation Upcoming Design-build opportunities CB-99S: Replace Mech. & Elect Equipments, S. Abutment & S. Bldg. MP-03S: Programmable Logic Controller & Mechanical Rehab MP-21: Rehab of Rockaway Point Blvd Overpass and Jacob Riis Park Pedestrian Bridge A significant portion of the 15-19 program will be Design Build projects As you can see, B&T has been embracing the Design-build method when possible. Based on the success of the projects to date, B&T anticipates expanding its use of design build projects over the upcoming capital program. Bridges and Tunnels

New Initiatives and Directions Enhanced Safety Program: Strong emphasis on safety (public, contractor, customers) throughout the MTA. Cultural change from compliance and enforcement driven to a system safety approach. As-needed Construction, Design, and CM contracts Use of as-needed construction, design and CM Contracts increasing due to need for greater flexibility and speed in progressing work Continued focus on meeting WBE/MBE Goals: WBE/MBE requirements and compliance will be strictly enforced. Final performance evaluation and future awards will consider past MBE/WBE goal compliance performance. Safety program: Safety is paramount at B&T. The project must be driven by safety. This requires a cultural change to a system safety approach. As needed: Due to the need to react in a timely manner to changing conditions, the Authority has expanded its use of as-needed construction, design and CM contracts. WBE/MBE Goals are currently 10 & 10. The goals will be increasing in the near future. It is imperative to make every effort to meet the goals and performance appraisals will reflect this effort. Bridges and Tunnels

Opportunities Upcoming Construction Contracts

Proposed Major Construction Contracts 2015-2019 Program Facility Project & Description Project Budget Duration (Months) Planned Award Year Bronx-Whitestone Bridge BW-14 Miscellaneous Structural Rehabilitation $ 78M 30 2015 Henry Hudson Bridge HH-88B Reconstruction of Toll Plazas and Southbound Approach $ 92M 51 2016 HH-89 Skewback Retrofit $ 83M 33 Marine Parkway Bridge MP-16 Miscellaneous Steel Repairs and Zone Painting of the MPB below roadway, spot paint above roadway $ 82M 39 RFK Bridge RK-19 / RK-70 Seismic/Wind Retrofit and Structural Rehabilitation / Miscellaneous Structural Repairs $ 235M 42 2018 RK-23C Construction of New HRD Ramp $ 155M Throgs Neck Bridge TN-49 Replacement of Grid Decks on Suspended Span and Painting on Suspended Span $ 360M 48 2017 TN-53 Approach Viaducts Seismic Retrofit & Structural Rehab $ 163M 36 Verrazano Narrows Bridge VN-34 Main Cable & Suspender Rope Testing Ph I $ 42M 38 VN-84 Replacement of Upper Level Elevated Approach & Anchorage Decks - Ph 1 $ 132M Bridges and Tunnels

Proposed Major Operating Projects 2015-2019 Program Project & Description Projected Budget Planned Award Year GFM-509 Miscellaneous Construction on an As-needed Basis $ 80M 2017 GFM-512 Authority-wide Roadway Repairs $ 34M GFM-513 Miscellaneous Authority-wide Painting $ 2M 2016 Bridges and Tunnels

Upcoming Opportunities An Eye on the Future. Future solicitations – Updated Quarterly covering a running 6-month period. http://web.mta.info/mta/capital/eotf.htm Dashboard. 2010-2014 Project schedules and budgets, as well as selected 2005-2009 Project schedules and budgets – Updated Quarterly. http://web.mta.info/capitaldashboard/CPDHome.html 2015-19 Capital Program http://web.mta.info/capital/pdf/Board_2015-2019_Capital_Program.pdf Bridges and Tunnels