Youngsville Parkway Presented by Raymond J. Reaux, PE.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Great Western Corridor Feasibility Study
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
District 03 Roundabouts. Roundabouts In Operation - LA LA 342 (Ridge ) - LA Chemin Metairie (Youngsville ) - LA Chemin Metairie.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Welcome to Pinal County. Greg Stanley Pinal County Public Works AACE Regional Conference Oct 1-3, 2008 The Three C’s of Hunt Highway.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Cape Cod Transportation Improvement Program (TIP) HOW DOES A PROJECT GET ONTO THE TIP ? Priscilla Leclerc, Senior Transportation Planner Cape Cod Commission.
1 The 2010 Financially Constrained Long-Range Transportation Plan And FY Transportation Improvement Program TPB Technical Committee November.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Joint Urban Roadway Standards Workshop April 27, 2006.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
CPEX Planning and Zoning Initiative Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation Tuesday, October 6, 2009 Michèle.
County Reports Arizona Association of County Engineers June 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Evaluation and Appraisal Comprehensive Plan Amendments City Council Workshop December 9, 2014.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
COLLIN COUNTY A County Government and Transportation Overview Ruben E. Delgado, PE Director of Engineering A County Government and Transportation Overview.
Development of A Traffic Monitoring Program Using Emme 3 Based on A San Joaquin COG Travel Demand Model Jia Hao Wu, Ph.D., Joy Bhattacharya, P.E. and Chris.
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) NOVEMBER 27, 2012 Craig Coffey, County Administrator 1.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
Prepared by: Derek Development Corporation, LLC 1035 East Milton Lafayette, LA The Shops at Miramar Community Profile This site is located west of the.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 28 th 2015.
USA Parkway Project Welcome Public Information Meeting to the
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Organization Chart of Department of Public Works and Town & Country Planning (DPT) Director - General Internal Audit Unit Deputy Director - General Office.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Hawthorne Village/ New Horizons South Apopka. Presentation Outline Background Re-Development Plan Action Requested.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) OCTOBER 23, 2012 Craig Coffey, County Administrator 1.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
PEACHTREE HILLS ROAD WAIVER REQUEST  2.34 ± acres  Currently zoned R-1a  Proposes to create 2nd lot (Mesa Village Tracts No. 2, Replat No. 1)  Applicant.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Transportation System Comments Santolina Level ‘A’ Master Plan.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Child Care Center Vehicle Impact Protection Ordinance Public Hearing Board of County Commissioners May 24, 2016.
1 Transportation Impact Fees and Street Maintenance Fees Presented to the City Council by the Planning and Development Department January 21, 2010.
POM & I-84/US 730 IAMPs Morrow County Planning Commission Hearing December 20, 2011.
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Regional Roads Committee
Central Polk Parkway PD&E Study
Transmittal Ordinance
MUNICIPAL UTILITIES DEPARTMENT July 26, 2005
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 9, 2018.
Joint City Council / Planning Commission
URBAN TRAIL PROJECT UPDATES
WSUP (Lightning W Tank #2)
Presentation transcript:

Youngsville Parkway Presented by Raymond J. Reaux, PE

Town of Youngsville Government Mayor Wilson B. Viator, Jr. Town of Youngsville Council Jesse Vallot Brenda Burley Paul Huval Huey Romero A.J. Bernard

Financially Constrained Transportation Plan N North – South Beltway Youngsville Parkway

Youngsville Parkway Funding History –State of Louisiana, Division of Administration, Office of Facility Planning and Control; September 2003 – Funding of $250,000 –Lafayette City-Parish Consolidated Government May 2004 – Funding of $305,000 –St. Martin Parish –Iberia Parish

Preliminary Engineering Project Coordination –Louisiana Department of Transportation & Development (LaDOTD) –Lafayette City – Parish Consolidated Government (LCG) –I-49 Design Consultants –St. Martin Parish –Lafayette Parish School Board –Land Owners –Utility Companies –Public Hearings

Preliminary Engineering Roadway Alternatives –Classifications LaDOTD Urban Arterial 1, 2, or 3 –Typical Sections 90 Ft. Right-of-Way, 2-Lane Urban Road, Open Ditch 150 Ft. Right-of-Way, 2-Lane Urban Road, Open Ditch 150 Ft. Right-of-Way, 4-Lane Urban Road, Open Ditch 150 Ft. Right-of-Way, 4-Lane Urban Road, Subsurface Drainage –Horizontal Alignments Eleven segment alignments

Town of Youngsville Council Action 1 Classification: LaDOTD Urban Arterial 3 Typical Section: 2-Lane Urban Road, Open Ditch Roadway Right-of-Way: 150 Foot Design Speed: 50 miles per hour 1 Town of Youngsville Ordinance No February 12, 2004.

Typical Section Design and Opinion of Probable Cost = $ 10.1 million 25’57’8’12’ 8’ 28’ 150’ Right of Way 2 Lane with Shoulder shoulder travel lane

Typical Section (Future Expansion 4-Lanes) 12’ 28’ 8’ 12’ 15’ 8’ 12’ 150’ Right of Way shoulder travel lane 12’ 14’ 1’ travel lane turn lane 28’

Metropolitan Planning Organization –Citizen Advisory Committee – March 1 st, 2004 –Transportation Technical Committee - March 1 st, 2004 –Transportation Policy Committee – April 5 th, 2004 –Lafayette Consolidated Government Planning and Zoning Commission – April 7 th, 2004 –Lafayette City-Parish Council 1 – May 4 th, Lafayette City-Parish Ordinance No

Youngsville Parkway Alignment School Board Property (Section 16) Green T. Lindon Elementary Ernest Gallet Elementary Youngsville Elementary Baker Hughes US 90 Lasalle Coulee LA HWY 734 N Le Triomphe

Fly Through…….

Lafayette Parish School Board Town of Youngsville Section 16 Property  12 acres N  400 acres  144 acres

Why Build The Youngsville Parkway? Addresses Regional Transportation Needs –An Important Segment of the North-South Beltway –Aligns with the Proposed I-49 Interchange –Aligns with a Proposed St. Martin Parish Roadway –Assist during Hurricane Evacuation Events

Why Build The Youngsville Parkway? Foster Regional Economic Development –Lafayette Parish –Lafayette Economic Development Authority –Town of Youngsville –St. Martin Parish –Iberia Parish

Why Build The Youngsville Parkway? Address Youngsville Population Expansion –Youngsville is the fastest-growing Town in the State of Louisiana –Population grew 25 percent to near 5,000 from July 2000 to June 2004.

Why Build The Youngsville Parkway? Address Youngsville Population Expansion Planned Residential Development. –Village of Copperfield (150 ac.) -18 lots –Sugar Mill Pond (2,000 ac.) – initially 100 lots –Copperwood East – 74 lots –Highland Plantation - 50 lots –Copperwood East - 74 lots –Chelsea Meadows – 24 lots –Shadowbrook - 55 lots –Madison Court - 11 lots –Adjacent Lafayette Parish Development

QUESTIONS???