5.1.2 Situative Planning 1 Situative Planning - A Strategic Approach to Urban Planning UPA Package 5, Module 1.

Slides:



Advertisements
Similar presentations
POLICY AND STRATEGY DEVELOPMENT THROUGH BRAIN STORMING AND IDEAS BANK TECHNIQUE Prof. Dr. S. Shabih-ul- Hassan Zaidi Dean, Faculty of Architecture and.
Advertisements

what is it and why do we use it?
This project is funded by the EUAnd implemented by a consortium led by MWH Amman – 23 April 2012 RCBI ‘handover’ meeting Jordan.
Chapter Ten Making Decisions. Chapter Ten Making Decisions.
1 Information Systems Development (ISD) Systems Development Life Cycle Overview of Analysis Phase Overview of Design Phase CP2236: Information Systems.
Group Techniques John A. Cagle California State University, Fresno.
BSBIMN501A QUEENSLAND INTERNATIONAL BUSINESS ACADEMY.
System Design and Analysis
Project Cycle Management (PCM)
Fundamentals of Information Systems, Second Edition
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Ch3. CP AND ENVIRONMENTAL MANAGEMENT SYSTEMS Course on Cleaner Production Middle East Technical University Department of Environmental Engineering Ankara.
Teaching, Learning, and Assessment Learning Outcomes Are formulated by the academic staff, preferably involving student representatives in the.
Copyright c 2006 Oxford University Press 1 Chapter 7 Solving Problems and Making Decisions Problem solving is the communication that analyzes the problem.
Urban Planning and Management Tools for Poverty Alleviation
1 Module 6 Putting It All Together. 2 Learning Objectives At the end of this session participants will understand: The monitoring and evaluation process.
1.Database plan 2.Information systems plan 3.Technology plan 4.Business strategy plan 5.Enterprise analysis Which of the following serves as a road map.
SYSTEM ANALYSIS AND DESIGN
Introduction to Systems Analysis and Design Trisha Cummings.
Developing the Logical Frame Work …………….
1 CASE STUDIES IN PROJECT MANAGEMENT Lecture 3 Project management methodologies.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Evaluation plans for programming period in Poland Experience and new arrangements Ministry of Infrastructure and Development, Poland Athens,
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Reaching Goals: Plans and Controls Today’s smart supervisor.
Acumanage Draft presentation Effective Leadership & Project Management Courses 1 L. Zegers – Training courses (in English, French or Spanish) Course 1:
Integrating Evaluation into the Design of the Minnesota Demonstration Project Paint Product Stewardship Initiative St. Paul, MN May 1, 2008 Matt Keene,
The Issues of Budgetary Reform Unit 3. PFM Reform – Change Management Module 3.2. Preparing and managing a reform programme.
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
Chapter 10 Information Systems Analysis and Design
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
PREPARED BY ASSISTANT PROFESSOR REHAN MASOOD
WP1Transnational project and financial management Establishment-Operation of the Project Management and Implementation Instruments Region of Peloponnese.
EDUCATION OF STUDENTS AND Qualification and training of TEACHERS at the Faculty of Education Koper (FEK), Littoral University (LU)
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Overall Quality Assurance, Selecting and managing external consultants and outsourcing Baku Training Module.
111 Synthesis of Questionnaires. Thematic concentration  Most of the new member states support the suggested principle while maintaining the element.
© 2007 The McGraw-Hill Companies, Inc. All rights reserved. Serving as Designated Leader © 2007 The McGraw-Hill Companies, Inc. All rights reserved. C.
Participatory Planning Project Cycle Management (PCM)
IS Analysis and Design. SDLC Systems Development Life Cycle Break problems into management review stages Control cost and time Works best with well understood.
INFORMATION SYSTEMS FOR MANAGEMENT. Agenda Information system project Organization analysis.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Lecture : 5 Problem Identification And Problem solving.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
Integrating Evaluation into the Design of the Minnesota Demonstration Project Paint Product Stewardship Initiative St. Paul, MN May 1, 2008 Matt Keene,
PLANNING YOUR APPROACH: THE MANAGEMENT COMPONENT OF CPS.
Principles of Management
PowerPoint Presentation to Accompany Management, 8/e John R. Schermerhorn, Jr. Prepared by: Jim LoPresti University of Colorado, Boulder Published by:
Consensus Validation A Tool for Teams GALA Leadership Symposium October 11, 2013 Presenter: Mindy Taylor.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
REPUBLIC OF BULGARIA MINISTRY OF FINANCE CURRENT CHALLENGES IN BUDGET REFORM SOFIAMR. LYUBOMIR DATZOV 03 DECEMBER 2004DEPUTY MINISTER
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 11. Reporting.
URBAN STREAM REHABILITATION. The URBEM Framework.
Module 3 Engagement techniques 3b Running a SP Workshop.
Fundamentals of Information Systems, Sixth Edition
Gap Analysis Continuing the development of the strategy
Fundamentals of Information Systems, Sixth Edition
Chapter 8: Planning – Processes and Techniques
© Copyright Showeet.com ORAL PRESENTATION Nº1 Subject: Curriculum Evaluation Date: May 11 th, 2018 Cycle: VI Topic: Unit 1: Evaluation and Innovation and.
Joint session with IHP+ introduction
Introduction to Systems Analysis and Design
Evaluation plans for programming period in Poland
Opening seminar of the project
Task Force on Target Setting and Reporting TFTSR
Information Systems Development (ISD) Systems Development Life Cycle
Gender Training Workshop Name of Institution Place Date
Presentation transcript:

5.1.2 Situative Planning 1 Situative Planning - A Strategic Approach to Urban Planning UPA Package 5, Module 1

5.1.2 Situative Planning 2 Stategic Planning Strategic approach to urban management responds to rapidly changing environment. Therefore it is informal, flexible, iterative, unifying, participatory. Source: Urban Planning and Management Project 2002:2

5.1.2 Situative Planning 3 Situative Planning (2) Components are: to work together with administration to have a goal to analyse the situation to identify problems and potentials to derive objectives to implement a plan to monitor and evaluate to communicate

5.1.2 Situative Planning 4 Plan A strategy which gives intention guided recommendations to achieve a conceived situation. Programme An outline of measures that specify the type of work needed to achieve the conceived situation set in plans. Project A set of activities to achieve a specific objective of a programme within a given time period and budget. Plan – Programme - Project

5.1.2 Situative Planning 5 Hierarchy of Plan – Programme – Project Plan Programme A Activity 1 Activity 2 Activity 3... Programme BProgramme C Project 1Project 2Project 3Project 4Project 5Project 6 Activity 1 Activity 2 Activity 3Activity 1 Activity 2 Activity 3Activity 1 Activity 2

5.1.2 Situative Planning 6 Project Cycle External Evaluation : Project Continuation Project Modification Project End Project Proposal Project Examination Project Selection Project Planning Project Plan Implementation Monitoring & Evaluation

5.1.2 Situative Planning 7 Contents of Tool Kit Urban Profile Organisation and Institutional Analysis Interest Analysis Problem Analysis Potential Analysis Objectives Analysis Alternatives Analysis Logical Framework (Project Planning Matrix) Operation Plan Monitoring and Evaluation Communication- and Teamwork Exercises

5.1.2 Situative Planning 8 Management by Objectives MBO was introduced to improve the planning and control of projects through clarification of scope of responsibilities improvement of communication and co-operation between executing agencies and decision makers installation of common platform for the project team provision of indicators as a basis for monitoring and evaluation.

5.1.2 Situative Planning 9 GOPP as an Example of MBO What is GOPP? GOPP is the English translation of the German term ZOPP. ZOPP is an acronym of the German term Ziel= goal = G Orientierte= oriented = O Projekt = project = P Planung = planning = P GOPP is a set of procedures, instruments and working techniques.

5.1.2 Situative Planning 10 Basic Procedures of GOPP gradual procedure through a sequence of successive planning steps permanent visualisation and documentation of all planning steps team approach

5.1.2 Situative Planning 11 Features of GOPP GOPP is one workable system is an open system is as good as the planning-team can be applied flexible on different planning stages generates a consensus of different opinions through the planning process.

5.1.2 Situative Planning 12 Workshop Moderator The moderator leads through the workshop but he is not a discussion leader. The moderator introduces the method, reminds the participants to respect the game-rules and gives technical assistance. The moderator never judges the ideas of the participants and does not take part in the thematical discussion.

5.1.2 Situative Planning 13 Working Techniques permanent visualisation and documentation of all planning steps with cards rules of application moderation

5.1.2 Situative Planning 14 Card Method Per card same logic = same colour clear writing (block letters) 1 idea 1 problem 1 thought more than three lines per card CAPITALS hand written Never

5.1.2 Situative Planning 15 Card Visualisation Put the cards on the board. Organise the cards according to topics. Stick the cards to the board to fix the results.

5.1.2 Situative Planning 16 Rules All workshop participants have the same importance. no monologues  ‘thank you’ rule Avoid formal voting to obtain a majority decision. Every card remains on the wall till the whole group decides to remove it. new idea  new card

5.1.2 Situative Planning 17 Results There are no correct or incorrect ideas. All ideas are accepted on equal ground. Novel and creative ideas are encouraged regardless of how foolish they might seem. Criticism and discussions are not allowed. Emphasis is on generating a large number of ideas in order to get all around the problem. Combinations and extensions of ideas are encouraged.

5.1.2 Situative Planning 18 Brainstorming is a method to generate new ideas in a group on the basis of spontaneous thoughts concerning a specific topic. It helps to get inputs from all participants which are used for further development of the topic. To get a spontaneous statement of each participant. To get different answers regarding a put question. Is the basis for many further developments like group work, discussions, problem tree development etc. Brainstorming

5.1.2 Situative Planning 19 Procedure (1) Each participant gets one or a special number of cards (small groups up to three answers possible) and a pen. Explain the procedure how to work with cards and brainstorming method. Put the questions on the board Give a time reference and appoint someone to assist you. Collect all cards and pin them on the board.

5.1.2 Situative Planning 20 Procedure (2) Cluster the answers (some statements might be single). Encourage all participants to define labels for clusters (not the majority but consensus is decisive). Discuss the answers. Formulate further questions or steps (e.g. second round of brainstorming).

5.1.2 Situative Planning 21 Brainstorming Workshop Context Brainstorm Organise Name Evaluate ? Title

5.1.2 Situative Planning 22 Tasks of an Urban Planner preparation of an urban profile selection of participants: functional aspects group dynamics not more than 20 participants information and participation: objectives of workshop methodology expectations Organisation of a Planning Workshop