Episode 3 E3-WP3-MWPM20091215-PPT-V0001-EXCOM5 1 Episode 3 EXCOM # 5 15th December 2009.

Slides:



Advertisements
Similar presentations
Petr Cerveny Unit Administration and Finance 31/5/2010 Major FP7 Negotiation Issues.
Advertisements

Expert Groups in Episode 3 Episode 3 - CAATS II Final Dissemination Event Raquel Garcia Isdefe Episode 3 Brussels, 13 & 14 Oct 2009.
Icahn Conversion to T. Rowe Price ITS ABOUT BEING THERE. DaVita Inc. Conversion to T. Rowe Price.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
PREPARE Final reporting period Months February 2013 to 31 July 2014.
Introduction Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
© Kristina Shroyer 2011 VITA: Winter 2011 Lesson 11: Retirement Income Winter 2011 Kristina Shroyer.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
WEEK 7 Introduction to Project Management. Wk 7 Agenda Review Phase 5: Closing Out the Project Review for test Assignment Discussion Quiz.
S/W Project Management
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
The Services Charter of Eustat Cristina Prado / Alicia Barriocanal Helsinki, May 5 th, 2010.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3.
Part-financed by the European Union WS 3: Communication Joint Technical Secretariat Lead Applicant seminar, Hamburg, 2-4 April 2008.
Overview Day 1 Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Development of testing structure, performance of testing and generalization of the outcomes by P7, Sataedu This project has been funded with support from.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 WP0.1 (international.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
WP2: Report 29 th June 2006 Dr Ing Jonathan C. Borg Kaunas CECA Parterns Meeting.
1 National R&I Programme Auditing Procedure National Funding Unit 2013.
INFSO-RI ETICS Periodic Review – Administrative and Financial requirements Karin Burghauser, CERN Project Admin.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Antonella Fresa Roma, 12 December 2005 kick off meeting.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
1 Project Coordinators’ meeting March 2010 TEMPUS MONITORING POLICY.
Topic 6 Managing stage boundaries
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
INGAS - Integrated GAS Powertrain 18 months Meeting, Paris GdF Suez May, 2010 Project number: May 2010 Project number:
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Joint wrap-up of event Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Episode 3 1 Final Report Performance Aspects Ex-Com #6 - Brussels, December 15th 2009
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
© Services GmbH Proposal writing: Part B 2/1/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
Monica Pantea, MANETPCC meeting in Frankfurt 2007 The annual reports 2005 and 2006.
Introduction to Project Management
DIRECTIVE 2000/60/EC 2 nd MEETING CHEMICAL MONITORING ACTIVITY (CMA) BRUSSELS, 17 th NOVEMBER 2005 Chemical Monitoring Activity Draft Outline of a Guidance.
Research and Innovation REPORTING and PAYMENT (in practice) v
HAPTEX HAPtic sensing of virtual TEXtiles haptex.miralab.unige.ch Funded by: FET-IST-FP6 (IST-6549) Review August, 2007 Financial Report Nadia Magnenat-Thalmann.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
ASPEC February 2015 Incidents –0 incidents, 0 near misses Hours 31/01/15-27/02/15 11% Site, 1% Travel, 88% Office ASPEC QSHR February 2015 Minutes.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
J-AGE I Status/Closing Report JPI MYBL - GA Meeting Brussels 21th January 2016.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Kick Off Meeting Largs, Scotland
Deliverables, final review and final reporting
Third PMC meeting University of Priština, Kosovska Mitrovica
SKADS Controller’s Meeting Timeline Annual Financial Report
Marine Strategy Framework Directive (MSFD)
Updating of the Reporting Guidance for the Floods Directive: Context
Automated Interoperability Testing
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Marine Strategy Framework Directive (MSFD)
Exercise Name player Briefing
9th meeting of the Expert Group on Reporting (22 March 2011)
WP 1 Management and Coordination
Lunar Calibration Workshop Status of the preparation
Presentation transcript:

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 1 Episode 3 EXCOM # 5 15th December 2009

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 2 Agenda TimeTopicWho leads 10:00-10:10WelcomeK. Gryc / P. Leplae 10:10-10:20Project statusP. Leplae 10:20-10:25Final report presentation-structureP. Leplae 10:25-10:45Chapter 3- Tools & validationR. Leemueller 10:45-11:00Chapter 4- ConceptR. Eveleigh 11:00-11:15OperabilityP. Sanchez 11:15-11:30PerformanceG. Murgese 11:30-11:45Technology assessmentP. Lelièvre 11:45-12:00Conclusion, feedback from consortium and ECAll 12:00-12:15Preparation of final management reportsP. Leplae 12:15-12:30AOB, Wrap-upAll

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 3 Status WP2 DOD’s nearly finalised (except, G, M1 and M2) WP3 Approval of 3 exercise reports, expert group report, operational scenarios, WP report WP4 completed WP5 Airport expert group report and WP report to approve WP6 Technical scenarios to approve and WP report to complete All approved documents on the public website on the 17th

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 4 Status continued Final report status: Sent for approval to consortium on 13th December Last comments on the 16th Transmission to EC on the 17th However: Transversal review still need to take place by more participants Need to assess conclusions in light of WP finalised reports The document is assessed as being too bulky for a high level report, and should be reduced noticeably, with details moved in annexes

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 5 Status report (continued) Management and activity reports to be sent end January with cost statements MTR answers already sent, but an MTR report is due to EC Final dissemination actions in January targeted to EP3 partners

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 6 Final report structure Introduction EP3 context & scope Tools, techniques and methodologies for validation Concept development Operational and process feasibility Performance aspects Technology aspects Lessons learnt Conclusions Recommendations

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 7 Final report presentation

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 8 Final cost statements All information to be sent as soon as possible before auditing, so that they can be checked: Form C properly filled in (dates, responsible, cost models, etc…) Travels justified by EP3 meetings or work only Management costs < 7% total costs All meetings properly justified by minutes or at least agenda on the website Audit certificate to be done for whole project of not delivered in year 1. Documents rejected in Yr 1 have to be resubmitted. Rejected costs for year 1 to be resubmitted as « adjustment to previous period » Money to be obtained from QUB, SELEX before distribution of remaining funds Clarifications required by NATS on exchange rate to apply

Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 9 Final cost statements