Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County 651-266-7117 April 2, 2013.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Hot Springs Public Meeting Reconstruction of US 18 & US 385
Project Background and Objectives
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
US 52 Corridor Study Public Meeting November 15, 2010.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
U.S. 33 Northern Connector Alternative
Environmental Assessment Public Meeting
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Maryland Avenue and Westminster Street Jerry Auge, PE Project Manager Ramsey County Paul St. Martin Traffic Engineer City of St. Paul September 10, 2013.
City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Joint Urban Roadway Standards Workshop April 27, 2006.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
U.S. 33 Road Reconstruction Goshen High School Auditorium 6 p.m. Wednesday, August 20, 2014.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Maryland at Edgerton Channelization  Maryland Avenue – Ramsey County Roadway  ADT 20,000 plus  Maryland/Edgerton Intersection in top 10 Citywide for.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Visit Our Website at: Click to edit Master title style.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Public Information Meeting NW 100th Street Reconstruction Project
SE 12th Street Roadway Improvements February 8, 2005.
State Aid Standards Development
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Project Location: 35th Ave HSIP8
Presentation transcript:

Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013

Presentation Topics Purpose/Background of Project Proposed Improvements – Project Limits – Infiltration Property Acquisition Update Costs Schedule HSIP Crash Data

Project Purpose Improve Safety within the Corridor – Adding Left Turn Lanes on Maryland Avenue – Estimated Accident Reduction of 58%*** – Increase Lane Width to 11 feet Improve Radii at Intersection of Arkwright St. Consolidate Driveway Access near Arkwright St. Improve Pedestrian Facilities at Intersection

Maryland Ave/Arkwright Intersection #1 Rated County Road intersection for Accidents in St. Paul Rated #4 – Intersection of Highest 175 crashes – Crash Data for June – ~35 crashes per year

Existing and Proposed Improvements

Existing Maryland Ave at Arkwright St. Roadway width 40 feet Four lane section Lane width 10 ft No designated left turn lanes at Arkwright St. 30 mph

Proposed Maryland Ave at Arkwright St. Roadway width 44 feet Four lane roadway 2 foot curb and gutter 11’ left turn lane 11’ thru lanes 5’ sidewalk 5’ boulevard 30 mph

Proposed Maryland Ave Alignment

Water Quality Improvements Watershed requires Improvements Infiltration/Water Quality Improvements Necessary for the Proposed Project Imp. Proposing to install within the Southwest Corner of Westminster/Maryland.

Proposed Rain Garden

Property Acquisition Update

Parcels within the Project Limits Total of 31 Parcels – 4 Commercial Properties – 26 Residential Properties – 1 MnDOT Property

Property Acquisition Update Total of 31 Parcels – 1 Property has Settled – 15 Properties Tentatively Settled – 15 Properties Unsettled

North East Quadrant 3 Residential Properties Commercial Property County/City has Prepared for all Options for Northeast Quadrant – St. Paul Water/Sewer Division – Other Private Utilities

Project Costs Federal Funding $1,363,300 County State Aid Funding $1,350,000 City Funding$1,050,000 Total Project Costs $3,963,300

Project Schedule Acquire All PropertiesMay 20, 2013 Project ApprovalsMay 2013 Advertise ProjectJune 2013 Utility RelocationsJuly 2013 Start ConstructionAugust 2013 End Construction October 2013

Project Phasing To be Determined – Private/Public Utility Work – Community Input – Project Duration Future Open House Meeting (April/May)

Crash Data

Report Prepared by FHWA (Crash Reduction Factors) Iowa State and Iowa Department of Transportation Study (Effectiveness of Roadway Safety Improvements) FHWA – Tool Box of Counter Measures

Data In Reports Estimated Crash Reduction to be Expected Provide 12 Tables (FHWA)grouped as: – Intersections – Roadways – Non Intersection Crashes – Pedestrian Crashes Tables provide a compiled Crash Reduction Factor (CRF)

Maryland Avenue at Arkwright Street (Intersection) CRF Incorporate this Information: – Minor Traffic Volumes – Reference – Intersections Observed – Crash Reduction Factor – Standard Error – Range – Crash Type – Crash Severity – Area Type – Configuration – Control – Major Traffic Volumes – Study Type

FHWA (CRF) Table

Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013