Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 4 Plan 1 st period Idoia Olalde Co-Living.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

SAFEFOODERA – SSA – integration project Expansion of SAFEFOODERA – Fully integrated or Associated partnership in 12 months.
Contents of the EHES Joint Action Hanna Tolonen EHES JA Kick-off meeting, 21 January 2010, Luxembourg.
SYSTEMATIC THOUGHT LEADERSHIP FOR INNOVATIVE BUSINESS Dr. Uli Eisert, SAP Research Ernst Sassen, University of St. Gallen (HSG) Successful IL* Solutions.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Plan 1 st Period Instituto Pedro Nunes Co-Living.
Partner Team Sponsors © 1999, Dept. of Computer Science, University Of Cyprus FOUNDATION OF RESEARCH & TECHNOLOGY DITIS is a system that supports Collaborative.
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
PERFORMER WP2 INTRODUCTION 13th of September 2013 CSTB Sophia Antipolis, France.
C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
“ FIRST STEP TO FIRST JOB – Innovative methods leading YOUTH to a solid career” VS/2012/0017 – VP/2011/010/0563 Kick-off meeting, 20 February 2013, Bucharest,
Part I : The EUMEDGRID-Support Project Abderrahman El Kharrim Joint EPIKH/EUMEDGRID-Support Event in Rabat Rabat,
Virtual Collaborative Social Living Community for Elderly Kick Off Event Partner Instituto Pedro Nunes Paulo Freitas – António.
D ET N ORSKE V ERITAS DNV - 01/06/ Project Progress between review meeting #2 and #3 Peik Jenssen Copenhagen 25 May 2000.
Work Package 4.1: End-user Components Months 6-25 D4.1.1Design of the End-user components (Month 13) D4.1.2Prototype of the End-user components (Month.
EHealth Challenges and Opportunities E-health: Multi-disciplinary of E (ICT) and Healthcare, or applied ICT in healthcare (Design oriented), or healthcare.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
Duty Officer (DO) Module Kick off Meeting January 18, :00PM.
Preparing for Winter 2010/11 Guidance Overview Stuart Low Planning Manager SG Health Delivery Directorate.
IIIAURJCUPV Task 7.1 Software architecture and computation model E. Marcos C. Acuña Task 7.2 Multiagent System Platform A. Espinosa Task.
Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau.
The Preparatory Phase Proposal a first draft to be discussed.
The Mappers: “We find your way” MSE Studio Automated Test Framework 1 05 th December 2008 Presenter: Filipe Martins P&C Implementation.
European Life Sciences Infrastructure for Biological Information Subtask: TeSS Training Portal Subtask lead: Terri Attwood.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 WP2 “Design and implementation of infrastructure capturing.
Virtual Collaborative Social Living Community for Elderly Kick Off Event Partner Philips Overview Paul Koster Co-Living.
Virtual desktop for mobile elected Representative eRepresentative Project Overview.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Bridging Life Science Research and SME’s in the Baltic Sea Region - Putting Cluster Policies into Practise for the Benefit of SME´s Coordination and support.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Virtual Collaborative Social Living Community for Elderly Kick Off Event University of Cyprus Prof. George Samaras Co-Living.
NA2 objectives The „v.E.R.C.“ (virtual Earth System Resource Center) v.E.R.C is: A (technical) infrastructure to improve the utilization of the ESM core-infrastructure,
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
Demonstrators and Pan-European Services Laboratory WP5 session.
Schools Connectivity Presentation to the Portfolio Committee on Telecommunications and Postal Services 12 September 2014 Making South Africa a Global Leader.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
Virtual Collaborative Social Living Community for Elderly Kick Off Event Trondheim muncipality and Information center for seniors Toril Nervik Co-Living.
Introduction to EELA Antonio Fuentes Tutorial Grid Madrid, May 2004.
1 reTHINK Deliverables, How To Read reThink deliverables quick starter.
1:1 Learning Scott Drossos :1 Learning2.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 1 Overview Paul Koster - Philips Co-Living.
Structuring of work related competences in Chemical Engineering STRENGTH Leonardo da Vinci ToI Project ES1-LEO RESULT 7 STRENGTH Quality.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
HNSciCloud Project MSc in Project Engineering delivered by Professor Gilles Vallet Oxford Academics for Computing Science Department, University of Chester.
First Virtual Meeting of the Global Science Community (GSC) on e-Health Tiwonge Msulira Banda, MAGIC WP5 Team Leader February 2, 2016.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Overview Instituto Pedro Nunes Co-Living 12/3/ Paulo Freitas - Instituto.
Community Links Bromley 1 Presentation by Eithne Rynne Health Social Care & Housing Partnership Board Friday 26th June 2009 Community Links Bromley.
GEO ADC meeting, Tokyo, Japan, May 2007 Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Tokyo, Japan,
WP4 Summary Patrick Fuhrmann for the WP4 Tream RIA
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
Wp6 – Action plan for period 7-12/14 Renata Turčinov, LLMAncona, July, 16-18, 2014 Croatian Health Insurance Fund Communication Officer.
> 1 ACP S&T Grant Contract N° FED/2009/ Introducing WP6 Monitoring & Quality control Objectives, actions, procedures Dr Sarah Bracking.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
WP9: Dissemination and Exploitation
Project Facts Partners: DANTE (UK), GARR (IT), RedCLARA (UY), RedIRIS (ES), RENATA (CO), RNP (BR), TERENA (NL) Coordinator: RedCLARA Project Duration:
Presenter name affiliation
WP3 - Dissemination.
ARTEMIS Brokerage Event Call 2011 HealthyPARK ASP-2
WP5: Dissemination, studies, web portal and tools
Presentation for information days Units involved:
BioMedBridges – Work Packages 2 & 12
“In Paint” Communication Kick-off meeting Patrizia Di Mauro
dsk-net decentralized social and knowledge networks FETOPEN
The basics ESSnet on SDMX prepared in 2008/2009
Collaborative Smart House Environment Computer Science Department University of Cyprus Contact: Christodoulou Eleni.
How to integrate the PMO process with the Agile Process
Overview of the iLIVE Volunteer Project
Presentation transcript:

Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 4 Plan 1 st period Idoia Olalde Co-Living

Idoia Olalde - Andago WP 4 Contribution First 12 months Goals of the work package  First prototype of the mobile wireless ICT based services  A detailed specification and design of the services

Idoia Olalde - Andago WP 4 Contribution Bottlenecks / risks  Delay in previous design  Poor user requirements / community model design / system design Interdependencies within the work package  Parallel tasks  Each task Specification → Design → Implementation → Testing Interdependencies with other work package(s)  Backward: Overall system design (D2.1) Design of ICT based services (D2,3) Design of Soco-net and a security and privacy infrastructure (D2.2)  Forward: D4.1, D4.2, D4.3 → System Integration (T5.1)

Idoia Olalde - Andago WP 4 Contribution 1 st prototype Deliverables  D4.1 – Implementation and provision of an operational module of Care & Wellness services (M24) Responsable: Andago  D4.2 – Implementation and provision of an operational module of Guidance services (M24) Responsable: Andago  D4.3 – Implementation and provision of an operational module of Mobility monitoring services (M24) Responsable: IPN

Idoia Olalde - Andago WP 4 Contribution Planning (M02-M33)  Task 4.1: Specification, design, implementation and testing of Car & Wellness services (M02-M33)  Task 4.2: Specification, design, implementation and testing of Guidance services (M02-M33)  Task 4.3: Specification, design, implementation and testing of Mobility monitoring services (M02-M33)

Idoia Olalde - Andago WP 4 Contribution Contact persons per partner  Andago: Idoia Olalde Manrique Lopez  IPN: Antonio Cunha Paulo Freitas  Philips: Paul Koster  UCY: George Samaras Dimos Georgiadis  Citard: Eleni Christodoulou

Idoia Olalde - Andago WP 4 “Management Team”  WP leader: Andago  Task leaders Task 4.1 : Andago Task 4.2: Andago Task 4.3: IPN Deliverable “editors”  D4.1  Responsible : Andago  Editors: IPN, Philips, University of Cyprus and Citard  D4.2  Responsible : Andago  Editors: IPN, Philips, University of Cyprus and Citard  D4.3  Responsible : IPN  Editors: Andago, Philips and University of Cyprus

Idoia Olalde - Andago Communications  Meeting calendar Regular WP meetings  Conference call  Physical meetings Task meetings

15/09/10 Idoia Olalde - Andago9 WP 4 Expected results  Fully implementation of a set of mobile services  Help elderly people in their day to day activities in the area of care and wellness, guidance and mobility  Stimulate an active living in an outward environment  Facilitate the social interaction  Improve their well-being