PERFORMER WP2 INTRODUCTION 13th of September 2013 CSTB Sophia Antipolis, France.

Similar presentations


Presentation on theme: "PERFORMER WP2 INTRODUCTION 13th of September 2013 CSTB Sophia Antipolis, France."— Presentation transcript:

1 PERFORMER WP2 INTRODUCTION 13th of September 2013 CSTB Sophia Antipolis, France

2 WP2 ‘HOLISTIC ASSESSMENT FRAMEWORK FOR BUILDING ENERGY PERFORMANCES’ – OVERVIEW 2 PERFORMER Kick-Off meeting Objectives: To build a consistent and comprehensive framework, which augments the PERFORMER solution with ICT-enabled smartness and automation Facts & figures RTD work-package – mainly focused on ICT Duration: M1 – M30 Involving UPL, CSTB, CEA, CU, BRE, EC, GDF, SG, SIGMA, CCC (Leader CEA) Total WP effort = 93 p.m (15% of project’s total effort) Activities Specifying and prototyping a comprehensive and adaptable (i.e. scalable) ICT infrastructure (sensors, communication software, interfaces, and devices) for building energy, comfort and usage data collection. Assessing, selecting and implementing the most relevant combinations of artificial intelligence and building digital modelling approaches for real- time energy monitoring, awareness and management. Providing smart visualization and decision support during operation phase.

3 3DELFT, 17-18 SEP 2013 Task 2.1: Base technology selection (CU) Task 2.2: Building intrinsic and actual performances energy assessment ICT infrastructure (ECG) Task 2.3: Energy performance modelling environment (CEA) Task 2.4: Energy performances management (CSTB) D2.1: Performer Base Technologies Report (M6, 9 p.m) D2.2: Intrinsic Performances Assessment Framework (M24, 24 p.m) D2.3: Energy Performance Modelling Environment (M24, 27 p.m) D2.4: Actual Performance Monitoring and Management Framework (M30, 33 p.m) D2.1: Performer Base Technologies Report (M6, 9 p.m) D2.2: Intrinsic Performances Assessment Framework (M24, 24 p.m) D2.3: Energy Performance Modelling Environment (M24, 27 p.m) D2.4: Actual Performance Monitoring and Management Framework (M30, 33 p.m) WP2 ‘HOLISTIC ASSESSMENT FRAMEWORK FOR BUILDING ENERGY PERFORMANCES’ – STRUCTURE PERFORMER Kick-Off meeting MS4: Delivery of Intrinsic and in-use performance monitoring and management framework (M30)

4 WP1: Global framework and methodologies Methodological support D1.1: PERFORMER framework (M12) D1.2: Methodologies for the Assessment of Intrinsic Energy Performance of Building Envelopes (M15) D1.3: Cost Optimised Energy Performance Measurement Plan Methodology (M15) D1.4: Specification for Energy Management, Fault Detection and Diagnostic Tools (M15) Pilot information D3.1: Pilot Building Characteristics and Related Energy Data (M9) D3.3: Pilot Information Model (M12) D3.4: Consideration of Measurement Challenges (M12) Demonstration requirements D4.1: Pilot Version Sharing and Awareness Raising Report (M6) WP3: Pilot Data Gathering WP4: Demonstrators WP2: ICT framework WP4: Demonstrators WP5: Replication and Assessment WP6: Dissemination and exploitation WP1: Global framework and methodologies SoA (D2.1) and ICT-related requirements and limitations Technology Research results ICT infrastructure and tools (D2.2, D2.3, D2.4) WP2 ‘HOLISTIC ASSESSMENT FRAMEWORK FOR BUILDING ENERGY PERFORMANCES’ – DEPENDENCIES

5 ACTIVITY PLAN M1-M6 WP2 ‘HOLISTIC ASSESSMENT FRAMEWORK FOR BUILDING ENERGY PERFORMANCES’ 5 ActivityExpected outcomePartners involvedDeadline 1. Review of WP2 partners’ background Summary of technological background available to WP2 All WP2 partners10/2013 2. Clarification of technological contributions Summary of contributions – tools architecture overview – detailed structure of D2.1 All WP2 partners11/2013 3. Technology review (-> D2.1) State of the art contributions TRF, RNS, AOC, APH 01/2014 4. D2.1 consolidationD2.1 for internal review CU, CEA, CSTB, GDF 02/2014 5. Development planning refinement M6-24 detailed development planning Task leaders: CU, EC, CEA, CSTB 02/2014 Objectives in M1-M6SoA – technologies selection - clarification of contributions Active tasksT2.1 ‘Base technology selection’ mainly – CU ; All tasks to start during the first 6 months. Planned effort 10-12 person-months (out of total 93 person-months for this WP) Remark/anticipated issue - PERFORMER Kick-Off meeting

6 WP2 - COMMENTS Work organization List of participants + one main contact point for each partners One conf call every two weeks F2Fmeetings when necessary Having a WP2 workshop at M3 about the architecture? Need business models Initially planned at M48 – early internal delivery? The planning is tight Two ICT deliverables at M24 There is a risk of “drift” to M28-M30 Need for an early awareness of end-users functional requirements From WP3-4-5 Impact on technology choice (e.g. MAS vs expert systems)