Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting 2014.04.08.

Slides:



Advertisements
Similar presentations
All purpose professional emergency lighting. Ceiling mounting. Beghelli Formula 65 is equipped with a symmetric reflector which makes it suitable for.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
TDC2/TCC2 consolidation EATM 15/07/2014. EN/EL – DC and control cable identification and cut completed – Old light removal in TDC2 – New AUG installed.
TDC2-TCC2 consolidation status report to EATM EDMS October 7 th, 2014 S. EVRARD, EN-MEF, on behalf of the TDC2/TCC2 WG.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
1 EXPERIENCE AND RELIABILITY. 2 Short circuit loop measurements EN EN
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
TDC2-TCC2 consolidation status report to RSSO EDMS October 14 th, 2014 E. Harrouch, Q. Bouirek, EN-MEF, on behalf of the TDC2/TCC2 WG.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Extraction and beamline progress B.Goddard TE/ABT.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
Sale of material salvaged from the LEP experiments 4 large experiments ALEPH DELPHI L3 OPAL The 4 detectors are situated in caverns (100 m under ground.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Electrial Safety LS2 days November 2016 AP
TDC2/TCC2 Electrical remedial work /12/14
YETS & LS2 Works EN-EL / Power distribution
St. George Infrastructure
SPS LS1 Planning meeting (N019) 04/09/13
Identification of the unused cables
Equipment simplified model SMR UR safety
Francois and Lau EATM 17 July 2012
EHN1 Extension planning
East Hall under construction
Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain
Injector De-cabling Project
AD consolidation activities in LS2
Budget specification EHN1 Extension: Infrastructure (WG2)
YETS & LS2 Reminder G. Girardot 20 juin 2017.
De-cabling strategy during YETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
EN-STI activities in LHC during EYETS
SR1 cleanroom extension
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
Extension SR1 WP3 Electrical installations
Experimental Areas – LS2 planning
PSS0 Design & Concept of Operations
North Area Safety Review 2019
HL-LHC - WP15 modifications Coffrets Prise C4L8
Presentation transcript:

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Summary Replacement of cable trays – Cable trays – DC Cables – Control cables New cables installation requests + reinstallation of temporary cables Redo joints magnets cables TCC2 Consolidation of existing cables Low Voltage refurbishment activity Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Replacement of cable trays (I) Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting Re-routing zone (40m approx.)

Replacement of cable trays (II) DC cables in one cable tray (0D115+0D116+0D516) Control cables in one cable tray with separator (0D110+0D114) Maintains some of the old cable trays & re-use some parts of the old cable trays. Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Replacement of cable trays: 0D516 & 0D514 (III) Cables in cable tray 0D516 already identified (DC cables)  8 cables Cables in cable tray 0D514 already identified (Control cables)  17 cables Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Replacement of cable trays: DC Cables (I) Start point Number of affected cables: a) 56 in cable trays b) 14 on the floor (+8 no accessible) Number of joints and lugs a) Lugs : 14*2+38 =66 1) 14 short cables (link between magnets) 2) 38 arrivals b) Joints : 38+36=74 1) 36 for magnets in “forbidden zone” 2) 38 the rest of the zone Type of cables: a) PZK1 (1x1x240 AL ) ”ANTIRAD” b) PZK2 (2x1x240 AL ) ”ANTIRAD” c) PZM3 (3x1x400 AL) ”ANTIRAD” d) PZM4 (4x1x400 AL) ”ANTIRAD” Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting x4 x2 x4 Cable tray 0D D516 Forbidden zone x4 x2 x6 x4 x8 x2 Cable tray 0D115

Replacement of cable trays: DC Cables (II) Old cables PZK1 (1x1x240 AL ), PZK2 (2x1x240 AL ), PZM3 (3x1x400 AL) PZM4 (4x1x400 AL) – “ANTIRAD” IS23  New cables ZCR1 (1x240 AL CL.2 0.6/1kV) ZCT1 (1x400 AL CL.2 0.6/1kV) Technical appendix 362 rev ( ) EDMS Id: provided by Yann Pira “ “ “ “ * ** *

Replacement of cable trays: 0D110 Control Cables (I) Cables in cable tray 110 : identification in progress. – Some cables are old. – Difficult to follow in the cable trays. – No info of the use. Cables: – C4E75: LEP TDM project, is it still alive? – NE4?: – CB50: routing not according to thecâblothèque. – NE48? Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Replacement of cable trays: 0D114 Control Cables (II) Cables in cable tray 114 : identification in progress. Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Replacement of cable trays: 0D117 Control Cables (III) Cables in cable tray 117 : identification in progress. – Difficult to follow in the cable trays. – Cables at the end of forbidden zone. (Pump system (CV), radiation monitor, emergency lights, plugs, lighting system…) – Cables entering in the ventilation pit? Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting Red door

Replacement of cable trays: Control Cables Summary (IV) 34 cables to re-install Total cable length = 3701 m 6 cables in the “forbidden zone” Users: – Vacuum: 1 cables – RP: 1 cables – BMP detectors: 18 cables – Intercom:3 cables – Magnets: 3 cables – Telephone (sec.+normal+alarm): 3 cables – Others : 5 BT cables not included: lighting, security lighting, AUG, pumps (CV), plugs, … Remaining work: – 4 cables in cable tray 0D110 – 7 cables in cable tray 0D114 – Re-check cable passing to TT20/end TDC2. Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

New cables installation requests + temporal cable 18 cables to install Total cable length = 2985 m 4 cables in the “forbidden zone” Users: – Vacuum: 15 cables – RP: 2 cables – ABM detectors: 1 cable Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Cable consolidation (I) Near the splitter 2: – 50 or 60 new cables to pull. No possibility to redo connectors – They will be replaced in LS2 Best solution: wait to LS2 Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting Home made box (vacuum) – Redo the box in a proper place. – Home made cables to reinstall and to be included in the câblothèque.( 4 short cables) – In LS2, new cables can be installed from surface.

Cable consolidation (II) 3 cables pulled by user up to BTV925 – Are they needed? – New cables to re-install porperly? Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Cable consolidation (III) Cable to remove: – MDFP230707: 6 cables – MDFP230710: 6 cables – Easy access – Removal up to TA801 (to be re-used in the future if it is needed) – No interference with other cables. Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Magnets cables joints Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting From “Magnets” Draft EDMS connections of as shown in the document (6 under MBN V071 and 6 under MBN 067) have been found. Solution:“Manchonnage”

Time Estimations

Low Voltage works James Devine – EN/EL/BT – WP 31st Meeting Scope: Replacement of all obsolete and non-compliant systems. – Lighting (Normal & Emergency) – Power distribution (Socket outlets) – Fixed appliances (Cranes, transport rails) – AUG buttons Reversed sequence of installation: – Install new – Remove old

Normal Lighting James Devine – EN/EL/BT – WP 31st Meeting Provide minimum 100 Lux illumination at floor level throughout TDC2/TCC2. 50% de-rating for radiation impact on luminaires. 58W T26 Fluorescent lighting within TDC2, long life tubes and ferromagnetic ballasts to resist radiation. 207W LED High-bay lighting within TCC2, power converters installed in CV Mezzanine to reduce radiation dose.

Emergency Lighting James Devine – EN/EL/BT – WP 31st Meeting Provide 1 Lux illumination along escape routes 50% de-rating for radiation. Comatelec LEDs within TDC2 and TCC2, custom radiation resistant design specific for CERN. Additional Thorlux LED fittings installed on TCC2 catwalk for illumination of beam line bridges.

Power Distribution James Devine – EN/EL/BT – WP 31st Meeting Install rationalized electrical distribution for socket outlets in vicinity of beam line Remove obsolete equipment and cables where possible. Agreement on positions with users required. OLD NEW

AUG buttons James Devine – EN/EL/BT – WP 31st Meeting Existing cabling + buttons are life expired. Replacement with new cables and CERN specific AUG button. Rationalise AUG placement to minimise dose (installation and operation). OLD NEW

Sequence of works James Devine – EN/EL/BT – WP 31st Meeting Pulling of new cables arriving to TT20/BA20/TDC2(4.5m) 2.Emergency Lighting Installation 3.AUG Installation 4.New Lighting & Power installation 5.EL/CF cable tray removal/installation activities 6.Final removal of obsolete equipment

Conclusions Identification must be finished. The preparation of the work is quite advanced. Procedure to work in safety condition must be finished (grounding) The work in the splitter zone implies high doses New dose survey is needed for a better calculation of the dose. Some more work is required to reduce the total dose. Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

Thanks! Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting

WDP – DRAFT!!! Handle with precaution!! RP Survey